If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284281106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.37501,"lon":-113.840848,"icon":""}]} |
Location: 00/06-11-028-28W4/0 | |
Location Alias: 00/06-11-28-28 W4M | |
Location Alias 2: 00/06-11-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 6-11-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438269 | |
License Date: 2011-11-01 | |
License Status: Issued | |
Spud Date: 2012-01-05 | |
Final Drill Date: 2012-01-06 | |
Well Total Depth: 1296.00 m | |
Surface Hole Latitude: 51.375010 | |
Surface Hole Longitude: -113.840848 |
Date | Event |
---|---|
2011-11-01 | Obtained License |
2012-01-05 | Direction Drilling Operation Performed - Deviate |
2012-01-05 | Surface Casing Operation Performed |
2012-01-06 | Finished Drilling |
2012-01-06 | Production Casing Operation Performed |
2012-01-06 | Well Mode changed to Drilled and Cased |
2012-01-07 | Rig Released |
2012-01-10 | Well Log Performed |
2012-01-25 | Perforation Treatment Performed - Jet Perforation |
2012-02-09 | Perforation Treatment Performed - Fractured |
2012-02-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-12 | Well Mode changed to Testing |
2012-02-17 | Perforation Treatment Performed - Jet Perforation |
2012-02-21 | Perforation Treatment Performed - Fractured |
2012-05-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-05-12 | Well Mode changed to Test Completed |
2012-06-01 | Well Began Production |
2012-06-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-06-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-05 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-01-05 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-25 | Perforation | 459.00 | 462.00 | 13 |
2012-02-17 | Perforation | 436.40 | 436.90 | 13 |
2012-02-17 | Perforation | 442.90 | 443.40 | 13 |
2012-02-17 | Perforation | 450.50 | 451.50 | 13 |
2012-02-17 | Perforation | 467.60 | 468.60 | 13 |
2012-02-17 | Perforation | 476.00 | 476.50 | 13 |
2012-02-17 | Perforation | 480.00 | 482.00 | 13 |
2012-02-17 | Perforation | 580.70 | 581.20 | 13 |
2012-02-17 | Perforation | 590.40 | 590.90 | 13 |
2012-02-17 | Perforation | 593.00 | 593.50 | 13 |
2012-02-17 | Perforation | 606.60 | 607.60 | 13 |
2012-01-25 | Perforation | 686.00 | 688.00 | 13 |
2012-02-17 | Perforation | 611.80 | 612.30 | 13 |
2012-02-17 | Perforation | 659.70 | 660.20 | 13 |
2012-02-17 | Perforation | 674.00 | 675.00 | 13 |
2012-02-17 | Perforation | 714.00 | 716.50 | 13 |
2012-02-17 | Perforation | 726.00 | 728.00 | 13 |
2012-02-17 | Perforation | 733.80 | 734.80 | 13 |
2012-02-17 | Perforation | 743.20 | 744.20 | 13 |
2012-02-17 | Perforation | 805.50 | 807.50 | 13 |
2012-02-17 | Perforation | 812.50 | 813.00 | 13 |
2012-02-17 | Perforation | 823.60 | 825.10 | 13 |
2012-01-25 | Perforation | 765.00 | 768.00 | 13 |
2012-02-17 | Perforation | 836.40 | 836.90 | 13 |
2012-02-17 | Perforation | 841.70 | 843.70 | 13 |
2012-02-17 | Perforation | 850.50 | 851.00 | 13 |
2012-02-17 | Perforation | 875.00 | 875.50 | 13 |
2012-02-17 | Perforation | 876.40 | 877.90 | 13 |
2012-02-17 | Perforation | 880.30 | 881.30 | 13 |
2012-02-17 | Perforation | 897.90 | 898.90 | 13 |
2012-02-17 | Perforation | 901.30 | 902.30 | 13 |
2012-02-17 | Perforation | 919.40 | 919.90 | 13 |
2012-02-17 | Perforation | 925.00 | 925.50 | 13 |
2012-02-09 | Fracture | 459.00 | 462.00 | 0 |
2012-02-17 | Perforation | 927.10 | 927.60 | 13 |
2012-02-21 | Fracture | 418.90 | 927.60 | 0 |
2012-02-09 | Fracture | 686.00 | 688.00 | 0 |
2012-02-09 | Fracture | 765.00 | 768.00 | 0 |
2012-02-17 | Perforation | 418.90 | 419.40 | 13 |
2012-02-17 | Perforation | 420.60 | 421.10 | 13 |
2012-02-17 | Perforation | 430.70 | 431.20 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5188 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8717 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8663 | 0.0 | 0.0 | 0.0 |
2017 | 8692 | 0.0 | 0.0 | 0.0 |
2018 | 8284 | 0.0 | 0.0 | 0.0 |
2019 | 8600 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[7]