X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284281107020

Well Details

Well ID: 0284281107020
Loading map...
Location: 02/07-11-028-28W4/0
Location Alias: 02/07-11-28-28 W4M
Location Alias 2: 02/07-11-028-28 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER 102 CROSSE 7-11-28-28
Operator Name: Ember Resources Inc.
License Number: 0437950
License Date: 2011-10-24
License Status: Issued
Spud Date: 2011-12-15
Final Drill Date: 2011-12-16
Well Total Depth: 1271.00 m
Surface Hole Latitude: 51.375098
Surface Hole Longitude: -113.832039

For data sources see[1][2]

Well History

Date Event
2011-10-24 Obtained License
2011-12-15 Direction Drilling Operation Performed - Deviate
2011-12-15 Surface Casing Operation Performed
2011-12-16 Finished Drilling
2011-12-16 Well Mode changed to Drilled and Cased
2011-12-17 Production Casing Operation Performed
2011-12-17 Rig Released
2011-12-22 Well Log Performed
2012-01-19 Perforation Treatment Performed - Jet Perforation
2012-01-30 Perforation Treatment Performed - Fractured
2012-02-13 Perforation Treatment Performed - Jet Perforation
2012-02-15 Perforation Treatment Performed - Fractured
2012-02-17 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-17 Well Mode changed to Testing
2012-06-02 Well Began Production
2012-06-02 Well Fluid changed to Coalbed Methane-Coals and Other
2012-06-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-15 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-19 Perforation 747.00 750.00 13
2012-02-13 Perforation 643.80 644.30 13
2012-02-13 Perforation 645.10 645.60 13
2012-02-13 Perforation 715.70 716.20 13
2012-02-13 Perforation 725.70 726.70 13
2012-02-13 Perforation 731.40 731.90 13
2012-02-13 Perforation 788.00 789.00 13
2012-02-13 Perforation 791.10 792.10 13
2012-02-13 Perforation 795.30 795.80 13
2012-02-13 Perforation 807.10 808.60 13
2012-02-13 Perforation 824.50 826.50 13
2012-01-30 Fracture 747.00 750.00 0
2012-02-13 Perforation 834.10 834.60 13
2012-02-13 Perforation 839.80 840.30 13
2012-02-13 Perforation 856.90 857.40 13
2012-02-13 Perforation 858.00 859.50 13
2012-02-13 Perforation 862.40 863.40 13
2012-02-13 Perforation 879.30 880.30 13
2012-02-13 Perforation 882.70 883.70 13
2012-02-13 Perforation 899.20 899.70 13
2012-02-13 Perforation 901.60 902.10 13
2012-02-13 Perforation 906.60 907.10 13
2012-02-13 Perforation 421.60 422.10 13
2012-02-13 Perforation 909.60 910.10 13
2012-02-15 Fracture 421.60 910.10 0
2012-02-13 Perforation 445.00 448.00 13
2012-02-13 Perforation 452.20 453.20 13
2012-02-13 Perforation 575.80 576.30 13
2012-02-13 Perforation 578.90 579.40 13
2012-02-13 Perforation 592.50 593.50 13
2012-02-13 Perforation 598.20 598.70 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5164 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8692 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8600 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[6]

References