X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284281112000

Well Details

Well ID: 0284281112000
Loading map...
Location: 00/12-11-028-28W4/0
Location Alias: 00/12-11-28-28 W4M
Location Alias 2: 00/12-11-028-28 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER CROSSE 12-11-28-28
Operator Name: Ember Resources Inc.
License Number: 0438266
License Date: 2011-11-01
License Status: Issued
Spud Date: 2011-12-08
Final Drill Date: 2011-12-10
Well Total Depth: 1345.00 m
Surface Hole Latitude: 51.383296
Surface Hole Longitude: -113.843382

For data sources see[1][2]

Well History

Date Event
2011-11-01 Obtained License
2011-12-08 Direction Drilling Operation Performed - Deviate
2011-12-09 Surface Casing Operation Performed
2011-12-10 Finished Drilling
2011-12-10 Well Mode changed to Drilled and Cased
2011-12-11 Production Casing Operation Performed
2011-12-11 Rig Released
2011-12-19 Well Log Performed
2012-01-19 Perforation Treatment Performed - Jet Perforation
2012-01-26 Perforation Treatment Performed - Jet Perforation
2012-01-27 Perforation Treatment Performed - Fractured
2012-01-30 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-30 Well Mode changed to Testing
2012-06-03 Well Began Production
2012-06-03 Well Fluid changed to Coalbed Methane-Coals and Other
2012-06-03 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-08 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-19 Perforation 813.00 815.00 13
2012-01-26 Perforation 585.60 586.10 13
2012-01-26 Perforation 684.10 684.60 13
2012-01-26 Perforation 693.30 693.80 13
2012-01-26 Perforation 695.80 696.30 13
2012-01-26 Perforation 708.20 708.70 13
2012-01-26 Perforation 711.80 712.30 13
2012-01-26 Perforation 712.90 713.40 13
2012-01-26 Perforation 759.50 760.00 13
2012-01-26 Perforation 809.00 811.00 13
2012-01-26 Perforation 827.70 828.20 13
2012-01-19 Perforation 895.00 898.00 13
2012-01-26 Perforation 837.50 838.50 13
2012-01-26 Perforation 841.00 841.50 13
2012-01-26 Perforation 909.70 911.20 13
2012-01-26 Perforation 927.70 929.20 13
2012-01-26 Perforation 935.60 936.10 13
2012-01-26 Perforation 957.20 957.70 13
2012-01-26 Perforation 959.50 961.00 13
2012-01-26 Perforation 963.10 964.10 13
2012-01-26 Perforation 980.20 980.70 13
2012-01-26 Perforation 984.00 984.50 13
2012-01-26 Perforation 531.70 532.70 13
2012-01-26 Perforation 985.10 985.60 13
2012-01-26 Perforation 1006.80 1007.30 13
2012-01-26 Perforation 1008.40 1008.90 13
2012-01-27 Fracture 531.70 1008.90 0
2012-01-26 Perforation 536.50 537.00 13
2012-01-26 Perforation 550.90 551.40 13
2012-01-26 Perforation 559.60 560.10 13
2012-01-26 Perforation 561.70 562.20 13
2012-01-26 Perforation 565.90 566.40 13
2012-01-26 Perforation 578.30 579.30 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5184 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8692 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8600 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[6]

References