X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284281115000

Well Details

Well ID: 0284281115000
Loading map...
Location: 00/15-11-028-28W4/0
Location Alias: 00/15-11-28-28 W4M
Location Alias 2: 00/15-11-028-28 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER CROSSE 15-11-28-28
Operator Name: Ember Resources Inc.
License Number: 0437690
License Date: 2011-10-16
License Status: Issued
Spud Date: 2011-12-01
Final Drill Date: 2011-12-02
Well Total Depth: 1240.00 m
Surface Hole Latitude: 51.383252
Surface Hole Longitude: -113.833838

For data sources see[1][2]

Well History

Date Event
2011-10-16 Obtained License
2011-12-01 Direction Drilling Operation Performed - Deviate
2011-12-01 Surface Casing Operation Performed
2011-12-02 Finished Drilling
2011-12-02 Well Mode changed to Drilled and Cased
2011-12-03 Production Casing Operation Performed
2011-12-03 Rig Released
2011-12-13 Well Log Performed
2012-01-12 Perforation Treatment Performed - Jet Perforation
2012-01-23 Perforation Treatment Performed - Fractured
2012-01-26 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-26 Well Mode changed to Testing
2012-06-02 Well Began Production
2012-06-02 Well Fluid changed to Coalbed Methane-Coals and Other
2012-06-02 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-01 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-12 Perforation 418.70 419.20 13
2012-01-12 Perforation 584.00 584.50 13
2012-01-12 Perforation 590.70 591.70 13
2012-01-12 Perforation 610.00 610.50 13
2012-01-12 Perforation 612.50 615.00 13
2012-01-12 Perforation 637.60 638.10 13
2012-01-12 Perforation 689.00 692.00 13
2012-01-12 Perforation 699.00 702.00 13
2012-01-12 Perforation 707.70 708.20 13
2012-01-12 Perforation 709.60 710.10 13
2012-01-12 Perforation 717.60 718.60 13
2012-01-12 Perforation 427.00 427.50 13
2012-01-12 Perforation 721.20 721.70 13
2012-01-12 Perforation 780.30 780.80 13
2012-01-12 Perforation 794.50 796.00 13
2012-01-12 Perforation 812.40 814.40 13
2012-01-12 Perforation 821.00 821.50 13
2012-01-12 Perforation 827.50 828.00 13
2012-01-12 Perforation 846.00 848.00 13
2012-01-12 Perforation 850.30 851.30 13
2012-01-12 Perforation 866.70 867.70 13
2012-01-12 Perforation 870.00 871.00 13
2012-01-12 Perforation 429.40 430.40 13
2012-01-12 Perforation 880.20 880.70 13
2012-01-12 Perforation 886.60 887.10 13
2012-01-12 Perforation 890.70 891.20 13
2012-01-12 Perforation 892.30 892.80 13
2012-01-23 Fracture 418.70 892.80 0
2012-01-12 Perforation 435.40 435.90 13
2012-01-12 Perforation 445.60 447.10 13
2012-01-12 Perforation 564.70 565.20 13
2012-01-12 Perforation 570.30 570.80 13
2012-01-12 Perforation 571.60 572.10 13
2012-01-12 Perforation 575.50 578.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5184 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8692 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8600 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[6]

References