X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284281116000

Well Details

Well ID: 0284281116000
Loading map...
Location: 00/16-11-028-28W4/0
Location Alias: 00/16-11-28-28 W4M
Location Alias 2: 00/16-11-028-28 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER CROSSE 16-11-28-28
Operator Name: Ember Resources Inc.
License Number: 0437689
License Date: 2011-10-16
License Status: Issued
Spud Date: 2011-12-03
Final Drill Date: 2011-12-05
Well Total Depth: 1343.00 m
Surface Hole Latitude: 51.383162
Surface Hole Longitude: -113.833838

For data sources see[1][2]

Well History

Date Event
2011-10-16 Obtained License
2011-12-03 Direction Drilling Operation Performed - Deviate
2011-12-03 Surface Casing Operation Performed
2011-12-05 Finished Drilling
2011-12-05 Production Casing Operation Performed
2011-12-05 Rig Released
2011-12-05 Well Mode changed to Drilled and Cased
2011-12-13 Well Log Performed
2012-01-13 Perforation Treatment Performed - Jet Perforation
2012-01-24 Perforation Treatment Performed - Fractured
2012-01-26 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-26 Well Mode changed to Testing
2012-06-03 Well Began Production
2012-06-03 Well Fluid changed to Coalbed Methane-Coals and Other
2012-06-03 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-03 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-13 Perforation 443.20 443.70 13
2012-01-13 Perforation 625.80 626.30 13
2012-01-13 Perforation 632.90 633.40 13
2012-01-13 Perforation 682.20 682.70 13
2012-01-13 Perforation 688.50 689.00 13
2012-01-13 Perforation 734.00 737.00 13
2012-01-13 Perforation 748.00 751.00 13
2012-01-13 Perforation 756.90 757.40 13
2012-01-13 Perforation 766.00 767.00 13
2012-01-13 Perforation 783.70 784.20 13
2012-01-13 Perforation 834.40 835.40 13
2012-01-13 Perforation 446.50 449.50 13
2012-01-13 Perforation 838.60 839.10 13
2012-01-13 Perforation 849.80 851.30 13
2012-01-13 Perforation 867.70 870.20 13
2012-01-13 Perforation 877.60 878.10 13
2012-01-13 Perforation 886.00 886.50 13
2012-01-13 Perforation 905.10 907.10 13
2012-01-13 Perforation 909.80 910.80 13
2012-01-13 Perforation 928.80 929.30 13
2012-01-13 Perforation 931.40 931.90 13
2012-01-13 Perforation 932.30 932.80 13
2012-01-13 Perforation 453.00 453.50 13
2012-01-13 Perforation 957.90 958.40 13
2012-01-13 Perforation 960.60 961.10 13
2012-01-24 Fracture 443.20 961.10 0
2012-01-13 Perforation 461.80 462.80 13
2012-01-13 Perforation 468.30 469.30 13
2012-01-13 Perforation 479.80 481.30 13
2012-01-13 Perforation 603.30 603.80 13
2012-01-13 Perforation 608.00 611.00 13
2012-01-13 Perforation 613.00 613.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5160 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8692 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8600 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[6]

References