If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284282001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.404392,"lon":-113.898966,"icon":""}]} |
Location: 00/01-20-028-28W4/0 | |
Location Alias: 00/01-20-28-28 W4M | |
Location Alias 2: 00/01-20-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 20 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 1-20-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410884 | |
License Date: 2009-06-10 | |
License Status: Amended | |
Spud Date: 2009-12-12 | |
Final Drill Date: 2010-01-12 | |
Well Total Depth: 1316.00 m | |
Surface Hole Latitude: 51.404392 | |
Surface Hole Longitude: -113.898966 |
Date | Event |
---|---|
2009-06-10 | Obtained License |
2009-12-13 | Surface Casing Operation Performed |
2010-01-12 | Finished Drilling |
2010-01-12 | Well Mode changed to Drilled and Cased |
2010-01-13 | Production Casing Operation Performed |
2010-01-13 | Rig Released |
2010-01-21 | Well Log Performed |
2010-02-12 | Perforation Treatment Performed - Jet Perforation |
2010-02-22 | Well Fluid changed to Gas |
2010-02-22 | Well Mode changed to Testing |
2010-11-12 | Well Fluid changed to Gas |
2010-11-12 | Well Mode changed to Test Completed |
2010-11-28 | Perforation Treatment Performed - Jet Perforation |
2010-12-10 | Perforation Treatment Performed - Fractured |
2017-03-31 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-12 | Perforation | 1213.00 | 1216.00 | 13 |
2010-11-28 | Perforation | 836.00 | 837.00 | 13 |
2010-11-28 | Perforation | 638.00 | 640.00 | 13 |
2010-11-28 | Perforation | 529.00 | 532.00 | 13 |
2010-11-28 | Perforation | 523.00 | 526.00 | 13 |
2010-11-28 | Perforation | 453.00 | 456.00 | 13 |
2010-11-28 | Perforation | 537.00 | 540.00 | 13 |
2010-11-28 | Perforation | 619.00 | 622.00 | 13 |
2010-11-28 | Perforation | 604.00 | 607.00 | 13 |
2010-11-28 | Perforation | 565.00 | 568.00 | 13 |
2010-11-28 | Perforation | 874.10 | 874.60 | 13 |
2010-02-12 | Perforation | 1056.00 | 1059.00 | 13 |
2010-11-28 | Perforation | 885.80 | 886.30 | 13 |
2010-11-28 | Perforation | 870.30 | 870.80 | 13 |
2010-11-28 | Perforation | 871.40 | 872.40 | 13 |
2010-11-28 | Perforation | 899.60 | 900.10 | 13 |
2010-11-28 | Perforation | 906.30 | 906.80 | 13 |
2010-11-28 | Perforation | 888.80 | 889.30 | 13 |
2010-11-28 | Perforation | 893.60 | 894.10 | 13 |
2010-11-28 | Perforation | 831.70 | 832.20 | 13 |
2010-11-28 | Perforation | 810.80 | 811.80 | 13 |
2010-11-28 | Perforation | 801.90 | 802.40 | 13 |
2010-02-12 | Perforation | 991.00 | 993.00 | 13 |
2010-11-28 | Perforation | 833.20 | 834.20 | 13 |
2010-11-28 | Perforation | 868.00 | 868.50 | 13 |
2010-11-28 | Perforation | 866.60 | 867.10 | 13 |
2010-11-28 | Perforation | 840.20 | 840.70 | 13 |
2010-12-10 | Fracture | 453.00 | 854.00 | 0 |
2010-12-10 | Fracture | 736.50 | 906.80 | 0 |
2010-11-28 | Perforation | 787.00 | 789.00 | 13 |
2010-11-28 | Perforation | 703.00 | 706.00 | 13 |
2010-11-28 | Perforation | 685.00 | 688.00 | 13 |
2010-11-28 | Perforation | 814.00 | 817.00 | 13 |
2010-11-28 | Perforation | 736.50 | 737.00 | 13 |
2010-11-28 | Perforation | 851.00 | 854.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]