If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284282908003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.423006,"lon":-113.901086,"icon":""}]} |
Location: 00/08-29-028-28W4/3 | |
Location Alias: 00/08-29-28-28 W4M | |
Location Alias 2: 00/08-29-028-28 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 29 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 8-29-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0313340 | |
License Date: 2004-08-16 | |
License Status: Issued | |
Spud Date: 2004-09-26 | |
Final Drill Date: 2004-09-28 | |
Well Total Depth: 1311.00 m | |
Surface Hole Latitude: 51.423006 | |
Surface Hole Longitude: -113.901086 |
Date | Event |
---|---|
2004-08-16 | Obtained License |
2004-09-27 | Surface Casing Operation Performed |
2004-09-28 | Finished Drilling |
2004-09-28 | Well Mode changed to Drilled and Cased |
2004-09-29 | Production Casing Operation Performed |
2004-09-29 | Rig Released |
2004-10-10 | Well Log Performed |
2004-11-01 | Perforation Treatment Performed - Jet Perforation |
2004-11-09 | Perforation Treatment Performed - Jet Perforation |
2004-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-11-22 | Plug Back Performed |
2005-01-09 | Perforation Treatment Performed - Jet Perforation |
2005-04-13 | Perforation Treatment Performed - Fractured |
2005-04-26 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-04-26 | Well Mode changed to Testing |
2005-07-26 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-07-26 | Well Mode changed to Test Completed |
2010-10-14 | Well Began Production |
2010-10-14 | Well Fluid changed to Coalbed Methane-Coals Only |
2010-10-14 | Well Mode changed to Flowing |
2011-02-10 | Perforation Treatment Performed - Jet Perforation |
2011-02-14 | Perforation Treatment Performed - Fractured |
2011-04-13 | Well Fluid changed to Coalbed Methane-Coals Only |
2011-04-13 | Well Mode changed to Flowing |
2017-03-13 | Well Fluid changed to Coalbed Methane-Coals Only |
2017-03-13 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2004-11-01 | Perforation | 1197.00 | 1201.00 | 14 |
2005-01-09 | Perforation | 863.90 | 864.40 | 13 |
2005-01-09 | Perforation | 861.40 | 861.90 | 13 |
2005-01-09 | Perforation | 839.40 | 839.90 | 13 |
2005-01-09 | Perforation | 831.70 | 832.20 | 13 |
2005-01-09 | Perforation | 812.20 | 812.70 | 13 |
2005-01-09 | Perforation | 799.50 | 800.00 | 13 |
2005-01-09 | Perforation | 796.70 | 797.20 | 13 |
2005-01-09 | Perforation | 727.40 | 727.90 | 13 |
2005-01-09 | Perforation | 726.90 | 727.40 | 13 |
2005-01-09 | Perforation | 659.60 | 660.10 | 13 |
2004-11-09 | Perforation | 950.00 | 953.00 | 14 |
2005-01-09 | Perforation | 617.30 | 617.80 | 13 |
2005-01-09 | Perforation | 614.20 | 614.70 | 13 |
2005-01-09 | Perforation | 528.40 | 528.90 | 13 |
2005-01-09 | Perforation | 489.80 | 490.30 | 13 |
2005-01-09 | Perforation | 483.10 | 483.60 | 13 |
2005-01-09 | Perforation | 468.70 | 469.20 | 13 |
2005-01-09 | Perforation | 464.60 | 465.10 | 13 |
2005-01-09 | Perforation | 451.00 | 451.50 | 13 |
2005-01-09 | Perforation | 304.80 | 305.30 | 13 |
2005-01-09 | Perforation | 288.90 | 289.40 | 13 |
2004-11-22 | Packing Device Capped w/Cement | 1185.50 | 1193.50 | 0 |
2005-01-09 | Perforation | 282.10 | 282.60 | 13 |
2005-01-09 | Perforation | 254.10 | 254.60 | 13 |
2005-04-13 | Fracture | 254.10 | 897.60 | 0 |
2011-02-10 | Perforation | 834.50 | 835.50 | 13 |
2011-02-10 | Perforation | 820.50 | 821.50 | 13 |
2011-02-10 | Perforation | 815.00 | 816.00 | 13 |
2011-02-10 | Perforation | 775.00 | 777.00 | 13 |
2011-02-10 | Perforation | 772.00 | 773.00 | 13 |
2011-02-10 | Perforation | 758.50 | 760.50 | 13 |
2011-02-10 | Perforation | 716.00 | 719.00 | 13 |
2005-01-09 | Perforation | 897.10 | 897.60 | 13 |
2011-02-10 | Perforation | 694.00 | 696.00 | 13 |
2011-02-10 | Perforation | 690.00 | 692.00 | 13 |
2011-02-10 | Perforation | 673.00 | 675.00 | 13 |
2011-02-10 | Perforation | 655.00 | 656.00 | 13 |
2011-02-10 | Perforation | 557.50 | 558.50 | 13 |
2011-02-10 | Perforation | 519.00 | 521.00 | 13 |
2011-02-10 | Perforation | 480.00 | 481.00 | 13 |
2011-02-10 | Perforation | 476.00 | 478.00 | 13 |
2011-02-10 | Perforation | 460.00 | 462.00 | 13 |
2011-02-10 | Perforation | 425.00 | 427.00 | 13 |
2005-01-09 | Perforation | 887.40 | 887.90 | 13 |
2011-02-10 | Perforation | 422.00 | 423.00 | 13 |
2011-02-10 | Perforation | 398.00 | 399.00 | 13 |
2011-02-10 | Perforation | 361.50 | 362.50 | 13 |
2011-02-10 | Perforation | 229.50 | 230.50 | 13 |
2011-02-10 | Perforation | 201.00 | 204.00 | 13 |
2011-02-10 | Perforation | 187.00 | 189.00 | 13 |
2011-02-14 | Fracture | 834.50 | 835.50 | 0 |
2011-02-14 | Fracture | 815.00 | 816.00 | 0 |
2011-02-14 | Fracture | 519.00 | 777.00 | 0 |
2011-02-14 | Fracture | 460.00 | 478.00 | 0 |
2005-01-09 | Perforation | 883.50 | 884.00 | 13 |
2011-02-14 | Fracture | 229.50 | 423.00 | 0 |
2005-01-09 | Perforation | 871.20 | 871.70 | 13 |
2005-01-09 | Perforation | 870.00 | 870.50 | 13 |
2005-01-09 | Perforation | 868.80 | 869.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 24 | 0.0 | 0.0 | 0.0 |
2010 | 1858 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8669 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]