If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284282916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.429924,"lon":-113.901007,"icon":""}]} |
Location: 00/16-29-028-28W4/0 | |
Location Alias: 00/16-29-28-28 W4M | |
Location Alias 2: 00/16-29-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 29 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 16-29-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410872 | |
License Date: 2009-06-09 | |
License Status: Amended | |
Spud Date: 2009-12-15 | |
Final Drill Date: 2010-01-10 | |
Well Total Depth: 1298.00 m | |
Surface Hole Latitude: 51.429924 | |
Surface Hole Longitude: -113.901007 |
Date | Event |
---|---|
2009-06-09 | Obtained License |
2009-12-15 | Surface Casing Operation Performed |
2010-01-10 | Finished Drilling |
2010-01-10 | Well Mode changed to Drilled and Cased |
2010-01-11 | Production Casing Operation Performed |
2010-01-11 | Rig Released |
2010-01-23 | Well Log Performed |
2010-02-09 | Perforation Treatment Performed - Jet Perforation |
2010-02-22 | Well Fluid changed to Gas |
2010-02-22 | Well Mode changed to Testing |
2010-10-28 | Perforation Treatment Performed - Jet Perforation |
2010-11-03 | Perforation Treatment Performed - Fractured |
2011-01-17 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-09 | Perforation | 1204.00 | 1207.00 | 13 |
2010-10-28 | Perforation | 701.00 | 704.00 | 13 |
2010-10-28 | Perforation | 822.00 | 824.00 | 13 |
2010-10-28 | Perforation | 837.00 | 838.00 | 13 |
2010-10-28 | Perforation | 806.00 | 809.00 | 13 |
2010-10-28 | Perforation | 783.00 | 784.00 | 13 |
2010-10-28 | Perforation | 786.00 | 788.00 | 13 |
2010-10-28 | Perforation | 533.00 | 536.00 | 13 |
2010-10-28 | Perforation | 546.00 | 547.00 | 13 |
2010-10-28 | Perforation | 520.00 | 523.00 | 13 |
2010-10-28 | Perforation | 475.00 | 478.00 | 13 |
2010-02-09 | Perforation | 1170.00 | 1172.00 | 13 |
2010-10-28 | Perforation | 493.00 | 495.00 | 13 |
2010-10-28 | Perforation | 658.00 | 660.00 | 13 |
2010-10-28 | Perforation | 675.00 | 677.00 | 13 |
2010-10-28 | Perforation | 585.00 | 587.00 | 13 |
2010-10-28 | Perforation | 551.00 | 553.00 | 13 |
2010-10-28 | Perforation | 555.00 | 557.00 | 13 |
2010-10-28 | Perforation | 860.00 | 862.00 | 13 |
2010-10-28 | Perforation | 843.80 | 844.30 | 13 |
2010-10-28 | Perforation | 868.40 | 868.90 | 13 |
2010-10-28 | Perforation | 815.30 | 815.80 | 13 |
2010-02-09 | Perforation | 1151.00 | 1154.00 | 13 |
2010-10-28 | Perforation | 834.50 | 835.00 | 13 |
2010-10-28 | Perforation | 873.30 | 874.30 | 13 |
2010-10-28 | Perforation | 890.40 | 890.90 | 13 |
2010-10-28 | Perforation | 902.90 | 903.40 | 13 |
2010-10-28 | Perforation | 874.80 | 875.80 | 13 |
2010-10-28 | Perforation | 888.10 | 888.60 | 13 |
2010-10-28 | Perforation | 742.40 | 742.90 | 13 |
2010-10-28 | Perforation | 487.40 | 487.90 | 13 |
2010-10-28 | Perforation | 559.70 | 560.20 | 13 |
2010-10-28 | Perforation | 466.10 | 466.60 | 13 |
2010-02-09 | Perforation | 1026.00 | 1028.00 | 13 |
2010-10-28 | Perforation | 480.90 | 481.90 | 13 |
2010-10-28 | Perforation | 802.00 | 802.50 | 13 |
2010-10-28 | Perforation | 738.10 | 738.60 | 13 |
2010-10-28 | Perforation | 612.10 | 613.10 | 13 |
2010-10-28 | Perforation | 667.70 | 668.20 | 13 |
2010-10-28 | Perforation | 731.70 | 732.20 | 13 |
2010-11-03 | Fracture | 475.00 | 862.00 | 0 |
2010-11-03 | Fracture | 466.10 | 903.40 | 0 |
2010-02-09 | Perforation | 792.00 | 795.00 | 13 |
2010-10-28 | Perforation | 759.00 | 761.00 | 13 |
2010-10-28 | Perforation | 778.00 | 781.00 | 13 |
2010-10-28 | Perforation | 728.00 | 731.00 | 13 |
2010-10-28 | Perforation | 682.00 | 684.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]