If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284283412002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.438217,"lon":-113.867938,"icon":""}]} |
Location: 00/12-34-028-28W4/2 | |
Location Alias: 00/12-34-28-28 W4M | |
Location Alias 2: 00/12-34-028-28 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 34 | |
County/Municipality: Rocky View County | |
Well Name: EMBER LPINECK 12-34-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411325 | |
License Date: 2009-07-07 | |
License Status: Amended | |
Spud Date: 2009-12-10 | |
Final Drill Date: 2010-01-06 | |
Well Total Depth: 987.00 m | |
Surface Hole Latitude: 51.438217 | |
Surface Hole Longitude: -113.867938 |
Date | Event |
---|---|
2009-07-07 | Obtained License |
2009-12-10 | Lost Circulation Occurred |
2009-12-10 | Surface Casing Operation Performed |
2010-01-05 | Lost Circulation Occurred |
2010-01-06 | Finished Drilling |
2010-01-06 | Production Casing Operation Performed |
2010-01-06 | Rig Released |
2010-01-06 | Well Mode changed to Drilled and Cased |
2010-01-09 | Well Log Performed |
2010-02-04 | Perforation Treatment Performed - Jet Perforation |
2010-03-01 | Perforation Treatment Performed - Jet Perforation |
2010-06-27 | Perforation Treatment Performed - Fractured |
2010-11-19 | Well Began Production |
2010-11-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-11-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-04 | Perforation | 389.00 | 392.00 | 13 |
2010-03-01 | Perforation | 740.00 | 742.00 | 13 |
2010-03-01 | Perforation | 597.00 | 598.00 | 13 |
2010-03-01 | Perforation | 493.00 | 495.00 | 13 |
2010-03-01 | Perforation | 498.00 | 500.00 | 13 |
2010-03-01 | Perforation | 441.00 | 443.00 | 13 |
2010-03-01 | Perforation | 458.00 | 460.00 | 13 |
2010-03-01 | Perforation | 578.00 | 580.00 | 13 |
2010-03-01 | Perforation | 590.00 | 592.00 | 13 |
2010-03-01 | Perforation | 518.00 | 520.00 | 13 |
2010-03-01 | Perforation | 557.00 | 559.00 | 13 |
2010-02-04 | Perforation | 606.00 | 609.00 | 13 |
2010-03-01 | Perforation | 428.70 | 429.20 | 13 |
2010-03-01 | Perforation | 825.90 | 826.40 | 13 |
2010-03-01 | Perforation | 828.80 | 829.30 | 13 |
2010-03-01 | Perforation | 770.30 | 770.80 | 13 |
2010-03-01 | Perforation | 810.00 | 810.50 | 13 |
2010-03-01 | Perforation | 863.30 | 863.80 | 13 |
2010-03-01 | Perforation | 864.80 | 865.30 | 13 |
2010-03-01 | Perforation | 835.00 | 836.00 | 13 |
2010-03-01 | Perforation | 853.10 | 853.60 | 13 |
2010-03-01 | Perforation | 451.50 | 452.00 | 13 |
2010-03-01 | Perforation | 675.00 | 678.00 | 13 |
2010-03-01 | Perforation | 563.40 | 564.40 | 13 |
2010-03-01 | Perforation | 795.10 | 796.10 | 13 |
2010-03-01 | Perforation | 444.90 | 445.90 | 13 |
2010-03-01 | Perforation | 566.90 | 567.40 | 13 |
2010-03-01 | Perforation | 768.80 | 769.30 | 13 |
2010-03-01 | Perforation | 700.80 | 701.30 | 13 |
2010-03-01 | Perforation | 575.70 | 576.20 | 13 |
2010-06-27 | Fracture | 441.00 | 816.00 | 0 |
2010-06-27 | Fracture | 389.00 | 609.00 | 0 |
2010-06-27 | Fracture | 428.70 | 865.30 | 0 |
2010-03-01 | Perforation | 710.00 | 712.00 | 13 |
2010-03-01 | Perforation | 628.00 | 631.00 | 13 |
2010-03-01 | Perforation | 664.50 | 666.50 | 13 |
2010-03-01 | Perforation | 775.00 | 778.00 | 13 |
2010-03-01 | Perforation | 814.00 | 816.00 | 13 |
2010-03-01 | Perforation | 721.00 | 723.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1032 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8669 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-12-10 | Lost Circulation | 50.00 | 60.00 |
2010-01-05 | Lost Circulation | 137.00 | 987.00 |
For data sources see[6]