X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284283412002

Well Details

Well ID: 0284283412002
Loading map...
Location: 00/12-34-028-28W4/2
Location Alias: 00/12-34-28-28 W4M
Location Alias 2: 00/12-34-028-28 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 34
County/Municipality: Rocky View County
Well Name: EMBER LPINECK 12-34-28-28
Operator Name: Ember Resources Inc.
License Number: 0411325
License Date: 2009-07-07
License Status: Amended
Spud Date: 2009-12-10
Final Drill Date: 2010-01-06
Well Total Depth: 987.00 m
Surface Hole Latitude: 51.438217
Surface Hole Longitude: -113.867938

For data sources see[1][2]

Well History

Date Event
2009-07-07 Obtained License
2009-12-10 Lost Circulation Occurred
2009-12-10 Surface Casing Operation Performed
2010-01-05 Lost Circulation Occurred
2010-01-06 Finished Drilling
2010-01-06 Production Casing Operation Performed
2010-01-06 Rig Released
2010-01-06 Well Mode changed to Drilled and Cased
2010-01-09 Well Log Performed
2010-02-04 Perforation Treatment Performed - Jet Perforation
2010-03-01 Perforation Treatment Performed - Jet Perforation
2010-06-27 Perforation Treatment Performed - Fractured
2010-11-19 Well Began Production
2010-11-19 Well Fluid changed to Coalbed Methane-Coals and Other
2010-11-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-04 Perforation 389.00 392.00 13
2010-03-01 Perforation 740.00 742.00 13
2010-03-01 Perforation 597.00 598.00 13
2010-03-01 Perforation 493.00 495.00 13
2010-03-01 Perforation 498.00 500.00 13
2010-03-01 Perforation 441.00 443.00 13
2010-03-01 Perforation 458.00 460.00 13
2010-03-01 Perforation 578.00 580.00 13
2010-03-01 Perforation 590.00 592.00 13
2010-03-01 Perforation 518.00 520.00 13
2010-03-01 Perforation 557.00 559.00 13
2010-02-04 Perforation 606.00 609.00 13
2010-03-01 Perforation 428.70 429.20 13
2010-03-01 Perforation 825.90 826.40 13
2010-03-01 Perforation 828.80 829.30 13
2010-03-01 Perforation 770.30 770.80 13
2010-03-01 Perforation 810.00 810.50 13
2010-03-01 Perforation 863.30 863.80 13
2010-03-01 Perforation 864.80 865.30 13
2010-03-01 Perforation 835.00 836.00 13
2010-03-01 Perforation 853.10 853.60 13
2010-03-01 Perforation 451.50 452.00 13
2010-03-01 Perforation 675.00 678.00 13
2010-03-01 Perforation 563.40 564.40 13
2010-03-01 Perforation 795.10 796.10 13
2010-03-01 Perforation 444.90 445.90 13
2010-03-01 Perforation 566.90 567.40 13
2010-03-01 Perforation 768.80 769.30 13
2010-03-01 Perforation 700.80 701.30 13
2010-03-01 Perforation 575.70 576.20 13
2010-06-27 Fracture 441.00 816.00 0
2010-06-27 Fracture 389.00 609.00 0
2010-06-27 Fracture 428.70 865.30 0
2010-03-01 Perforation 710.00 712.00 13
2010-03-01 Perforation 628.00 631.00 13
2010-03-01 Perforation 664.50 666.50 13
2010-03-01 Perforation 775.00 778.00 13
2010-03-01 Perforation 814.00 816.00 13
2010-03-01 Perforation 721.00 723.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1032 0.0 0.0 0.0
2011 8755 0.0 0.0 0.0
2012 8782 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8747 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8669 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8660 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-12-10 Lost Circulation 50.00 60.00
2010-01-05 Lost Circulation 137.00 987.00

For data sources see[6]

References