If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284290208000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.364398,"lon":-113.967411,"icon":""}]} |
Location: 00/08-02-028-29W4/0 | |
Location Alias: 00/08-02-28-29 W4M | |
Location Alias 2: 00/08-02-028-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 29 | |
Section: 02 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 8-2-28-29 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411440 | |
License Date: 2009-07-15 | |
License Status: Amended | |
Spud Date: 2009-12-18 | |
Final Drill Date: 2010-01-22 | |
Well Total Depth: 1464.00 m | |
Surface Hole Latitude: 51.364398 | |
Surface Hole Longitude: -113.967411 |
Date | Event |
---|---|
2009-07-15 | Obtained License |
2009-12-18 | Surface Casing Operation Performed |
2010-01-22 | Finished Drilling |
2010-01-22 | Production Casing Operation Performed |
2010-01-22 | Rig Released |
2010-01-22 | Well Mode changed to Drilled and Cased |
2010-01-29 | Well Log Performed |
2010-02-21 | Perforation Treatment Performed - Jet Perforation |
2010-03-13 | Well Fluid changed to Gas |
2010-03-13 | Well Mode changed to Testing |
2010-08-28 | Perforation Treatment Performed - Fractured |
2010-09-05 | Perforation Treatment Performed - Jet Perforation |
2010-09-07 | Perforation Treatment Performed - Fractured |
2010-09-29 | Well Began Production |
2010-09-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-29 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-21 | Perforation | 1331.00 | 1332.00 | 13 |
2010-09-05 | Perforation | 883.00 | 885.00 | 13 |
2010-09-05 | Perforation | 827.00 | 828.00 | 13 |
2010-09-05 | Perforation | 830.00 | 831.00 | 13 |
2010-09-05 | Perforation | 734.00 | 737.00 | 13 |
2010-09-05 | Perforation | 586.00 | 588.00 | 13 |
2010-09-05 | Perforation | 620.00 | 622.00 | 13 |
2010-09-05 | Perforation | 549.00 | 552.00 | 13 |
2010-09-05 | Perforation | 566.00 | 569.00 | 13 |
2010-09-05 | Perforation | 681.00 | 683.00 | 13 |
2010-09-05 | Perforation | 711.00 | 712.00 | 13 |
2010-02-21 | Perforation | 1268.00 | 1270.00 | 13 |
2010-09-05 | Perforation | 625.00 | 626.00 | 13 |
2010-09-05 | Perforation | 675.00 | 678.00 | 13 |
2010-09-05 | Perforation | 900.00 | 902.00 | 13 |
2010-09-05 | Perforation | 1003.20 | 1005.20 | 13 |
2010-09-05 | Perforation | 1006.60 | 1007.10 | 13 |
2010-09-05 | Perforation | 983.40 | 983.90 | 13 |
2010-09-05 | Perforation | 999.70 | 1001.70 | 13 |
2010-09-05 | Perforation | 1036.60 | 1037.10 | 13 |
2010-09-05 | Perforation | 1039.70 | 1040.70 | 13 |
2010-09-05 | Perforation | 1019.60 | 1020.10 | 13 |
2010-02-21 | Perforation | 1226.00 | 1228.00 | 13 |
2010-09-05 | Perforation | 1021.60 | 1022.10 | 13 |
2010-09-05 | Perforation | 975.00 | 975.50 | 13 |
2010-09-05 | Perforation | 853.30 | 853.80 | 13 |
2010-09-05 | Perforation | 942.00 | 945.00 | 13 |
2010-09-05 | Perforation | 924.00 | 927.00 | 13 |
2010-09-05 | Perforation | 865.50 | 866.50 | 13 |
2010-09-05 | Perforation | 955.20 | 955.70 | 13 |
2010-09-05 | Perforation | 967.30 | 969.30 | 13 |
2010-09-05 | Perforation | 949.30 | 949.80 | 13 |
2010-09-07 | Fracture | 549.00 | 945.00 | 0 |
2010-08-28 | Fracture | 1268.00 | 1270.00 | 0 |
2010-09-07 | Fracture | 853.30 | 1040.70 | 0 |
2010-09-05 | Perforation | 801.00 | 804.00 | 13 |
2010-09-05 | Perforation | 815.00 | 818.00 | 13 |
2010-09-05 | Perforation | 750.00 | 751.00 | 13 |
2010-09-05 | Perforation | 770.00 | 772.00 | 13 |
2010-09-05 | Perforation | 869.00 | 871.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2256 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8669 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]