If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284290213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.372124,"lon":-113.971761,"icon":""}]} |
Location: 00/13-02-028-29W4/0 | |
Location Alias: 00/13-02-28-29 W4M | |
Location Alias 2: 00/13-02-028-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 29 | |
Section: 02 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 13-2-28-29 | |
Operator Name: Ember Resources Inc. | |
License Number: 0411551 | |
License Date: 2009-07-23 | |
License Status: Amended | |
Spud Date: 2010-01-24 | |
Final Drill Date: 2010-01-25 | |
Well Total Depth: 1765.00 m | |
Surface Hole Latitude: 51.372124 | |
Surface Hole Longitude: -113.971761 |
Date | Event |
---|---|
2009-07-23 | Obtained License |
2010-01-24 | Direction Drilling Operation Performed - Deviate |
2010-01-25 | Finished Drilling |
2010-01-25 | Surface Casing Operation Performed |
2010-01-25 | Well Mode changed to Drilled and Cased |
2010-01-26 | Production Casing Operation Performed |
2010-01-26 | Rig Released |
2010-01-29 | Well Log Performed |
2010-02-22 | Perforation Treatment Performed - Jet Perforation |
2010-03-14 | Well Fluid changed to Gas |
2010-03-14 | Well Mode changed to Testing |
2010-06-14 | Well Fluid changed to Gas |
2010-06-14 | Well Mode changed to Test Completed |
2010-10-02 | Perforation Treatment Performed - Fractured |
2010-10-06 | Well Fluid changed to Gas |
2010-10-06 | Well Mode changed to Testing |
2010-10-14 | Well Began Production |
2010-10-14 | Well Fluid changed to Gas |
2010-10-14 | Well Mode changed to Flowing |
2012-01-30 | Perforation Treatment Performed - Jet Perforation |
2012-02-06 | Perforation Treatment Performed - Fractured |
2012-02-09 | Perforation Treatment Performed - Fractured |
2012-02-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-24 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-01-24 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-22 | Perforation | 1681.00 | 1683.00 | 13 |
2010-02-22 | Perforation | 1127.00 | 1130.00 | 13 |
2010-10-02 | Fracture | 1494.00 | 1496.00 | 0 |
2010-10-02 | Fracture | 1447.00 | 1449.00 | 0 |
2010-10-02 | Fracture | 1127.00 | 1130.00 | 0 |
2012-01-30 | Perforation | 719.50 | 723.50 | 13 |
2012-01-30 | Perforation | 819.50 | 822.00 | 13 |
2012-01-30 | Perforation | 884.50 | 888.50 | 13 |
2012-01-30 | Perforation | 1040.00 | 1043.00 | 13 |
2012-01-30 | Perforation | 1054.60 | 1055.10 | 13 |
2012-01-30 | Perforation | 1055.30 | 1055.80 | 13 |
2010-02-22 | Perforation | 1650.00 | 1652.00 | 13 |
2012-01-30 | Perforation | 1107.80 | 1108.30 | 13 |
2012-01-30 | Perforation | 1138.60 | 1139.10 | 13 |
2012-01-30 | Perforation | 1156.90 | 1158.40 | 13 |
2012-01-30 | Perforation | 1166.30 | 1166.80 | 13 |
2012-01-30 | Perforation | 1174.90 | 1175.90 | 13 |
2012-01-30 | Perforation | 1176.50 | 1177.00 | 13 |
2012-01-30 | Perforation | 1196.40 | 1197.40 | 13 |
2012-01-30 | Perforation | 1214.90 | 1215.40 | 13 |
2012-01-30 | Perforation | 1216.40 | 1217.40 | 13 |
2012-01-30 | Perforation | 1219.00 | 1220.50 | 13 |
2010-02-22 | Perforation | 1624.00 | 1626.00 | 13 |
2012-01-30 | Perforation | 1227.00 | 1227.50 | 13 |
2012-01-30 | Perforation | 1243.00 | 1244.00 | 13 |
2012-01-30 | Perforation | 1245.00 | 1245.50 | 13 |
2012-01-30 | Perforation | 1247.90 | 1248.40 | 13 |
2012-01-30 | Perforation | 1267.70 | 1268.70 | 13 |
2012-01-30 | Perforation | 1271.80 | 1272.30 | 13 |
2012-02-06 | Fracture | 1214.90 | 1272.30 | 0 |
2012-02-09 | Fracture | 719.50 | 1197.40 | 0 |
2010-02-22 | Perforation | 1616.50 | 1618.50 | 13 |
2010-02-22 | Perforation | 1494.00 | 1496.00 | 13 |
2010-02-22 | Perforation | 1469.00 | 1471.00 | 13 |
2010-02-22 | Perforation | 1447.00 | 1449.00 | 13 |
2010-02-22 | Perforation | 1415.00 | 1417.00 | 13 |
2010-02-22 | Perforation | 1332.00 | 1335.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 1886 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 7895 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8744 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8680 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[6]