If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284291105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.375463,"lon":-113.972127,"icon":""}]} |
Location: 00/05-11-028-29W4/0 | |
Location Alias: 00/05-11-28-29 W4M | |
Location Alias 2: 00/05-11-028-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 29 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 5-11-28-29 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412081 | |
License Date: 2009-09-01 | |
License Status: Amended | |
Spud Date: 2010-02-09 | |
Final Drill Date: 2010-02-11 | |
Well Total Depth: 1728.00 m | |
Surface Hole Latitude: 51.375463 | |
Surface Hole Longitude: -113.972127 |
Date | Event |
---|---|
2009-09-01 | Obtained License |
2010-02-10 | Direction Drilling Operation Performed - Deviate |
2010-02-10 | Surface Casing Operation Performed |
2010-02-11 | Finished Drilling |
2010-02-11 | Production Casing Operation Performed |
2010-02-11 | Rig Released |
2010-02-11 | Well Mode changed to Drilled and Cased |
2010-02-19 | Well Log Performed |
2010-04-21 | Perforation Treatment Performed - Jet Perforation |
2010-05-13 | Well Fluid changed to Gas |
2010-05-13 | Well Mode changed to Testing |
2010-08-12 | Well Fluid changed to Gas |
2010-08-12 | Well Mode changed to Test Completed |
2010-09-30 | Perforation Treatment Performed - Fractured |
2010-10-04 | Well Fluid changed to Gas |
2010-10-04 | Well Mode changed to Testing |
2010-10-11 | Perforation Treatment Performed - Jet Perforation |
2010-11-29 | Perforation Treatment Performed - Fractured |
2010-12-23 | Well Began Production |
2010-12-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-12-23 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-10 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-04-21 | Perforation | 1627.00 | 1629.00 | 13 |
2010-09-30 | Fracture | 1541.00 | 1544.00 | 0 |
2010-10-11 | Perforation | 917.50 | 919.50 | 13 |
2010-10-11 | Perforation | 934.00 | 937.00 | 13 |
2010-10-11 | Perforation | 853.00 | 855.00 | 13 |
2010-10-11 | Perforation | 862.00 | 864.00 | 13 |
2010-10-11 | Perforation | 976.00 | 979.00 | 13 |
2010-10-11 | Perforation | 1032.00 | 1035.00 | 13 |
2010-10-11 | Perforation | 1050.00 | 1053.00 | 13 |
2010-10-11 | Perforation | 1000.00 | 1002.00 | 13 |
2010-10-11 | Perforation | 1022.00 | 1025.00 | 13 |
2010-04-21 | Perforation | 1570.00 | 1573.00 | 13 |
2010-10-11 | Perforation | 740.00 | 743.00 | 13 |
2010-10-11 | Perforation | 755.00 | 758.00 | 13 |
2010-10-11 | Perforation | 678.00 | 681.00 | 13 |
2010-10-11 | Perforation | 703.50 | 706.50 | 13 |
2010-10-11 | Perforation | 779.00 | 781.00 | 13 |
2010-10-11 | Perforation | 835.00 | 838.00 | 13 |
2010-10-11 | Perforation | 841.00 | 843.00 | 13 |
2010-10-11 | Perforation | 802.00 | 805.00 | 13 |
2010-10-11 | Perforation | 814.00 | 817.00 | 13 |
2010-10-11 | Perforation | 1215.40 | 1217.40 | 13 |
2010-04-21 | Perforation | 1541.00 | 1544.00 | 13 |
2010-10-11 | Perforation | 1219.60 | 1220.10 | 13 |
2010-10-11 | Perforation | 1205.00 | 1205.50 | 13 |
2010-10-11 | Perforation | 1212.20 | 1213.20 | 13 |
2010-10-11 | Perforation | 1233.10 | 1233.60 | 13 |
2010-10-11 | Perforation | 1261.80 | 1262.30 | 13 |
2010-10-11 | Perforation | 1267.40 | 1267.90 | 13 |
2010-10-11 | Perforation | 1234.50 | 1235.00 | 13 |
2010-10-11 | Perforation | 1238.30 | 1238.80 | 13 |
2010-10-11 | Perforation | 1177.00 | 1180.00 | 13 |
2010-10-11 | Perforation | 1108.80 | 1109.30 | 13 |
2010-04-21 | Perforation | 1516.00 | 1518.00 | 13 |
2010-10-11 | Perforation | 1077.00 | 1079.00 | 13 |
2010-10-11 | Perforation | 1144.00 | 1146.00 | 13 |
2010-10-11 | Perforation | 1156.60 | 1157.10 | 13 |
2010-10-11 | Perforation | 1167.70 | 1169.70 | 13 |
2010-10-11 | Perforation | 1151.90 | 1152.40 | 13 |
2010-10-11 | Perforation | 1132.00 | 1132.50 | 13 |
2010-11-29 | Fracture | 678.00 | 1180.00 | 0 |
2010-11-29 | Fracture | 1108.80 | 1267.90 | 0 |
2010-04-21 | Perforation | 1489.00 | 1491.00 | 13 |
2010-04-21 | Perforation | 1441.00 | 1445.00 | 13 |
2010-04-21 | Perforation | 1412.00 | 1415.00 | 13 |
2010-04-21 | Perforation | 1321.00 | 1324.00 | 13 |
2010-09-30 | Fracture | 1570.00 | 1573.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 220 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8669 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[6]