If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284291105020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.378563,"lon":-113.97678,"icon":""}]} |
| Location: 02/05-11-028-29W4/0 | |
| Location Alias: 02/05-11-28-29 W4M | |
| Location Alias 2: 02/05-11-028-29 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 29 | |
| Section: 11 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 102 CROSSE 5-11-28-29 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0435945 | |
| License Date: 2011-08-11 | |
| License Status: Issued | |
| Spud Date: 2011-10-29 | |
| Final Drill Date: 2011-11-01 | |
| Well Total Depth: 1566.00 m | |
| Surface Hole Latitude: 51.378563 | |
| Surface Hole Longitude: -113.976780 |
| Date | Event |
|---|---|
| 2011-08-11 | Obtained License |
| 2011-10-29 | Direction Drilling Operation Performed - Deviate |
| 2011-10-30 | Surface Casing Operation Performed |
| 2011-11-01 | Finished Drilling |
| 2011-11-01 | Production Casing Operation Performed |
| 2011-11-01 | Well Mode changed to Drilled and Cased |
| 2011-11-02 | Rig Released |
| 2011-11-15 | Well Log Performed |
| 2011-12-07 | Perforation Treatment Performed - Jet Perforation |
| 2011-12-14 | Perforation Treatment Performed - Fractured |
| 2012-02-16 | Well Began Production |
| 2012-02-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2012-02-16 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-29 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-12-07 | Perforation | 621.40 | 621.90 | 13 |
| 2011-12-07 | Perforation | 790.10 | 790.60 | 13 |
| 2011-12-07 | Perforation | 800.50 | 801.00 | 13 |
| 2011-12-07 | Perforation | 802.70 | 803.70 | 13 |
| 2011-12-07 | Perforation | 813.90 | 814.40 | 13 |
| 2011-12-07 | Perforation | 815.00 | 816.00 | 13 |
| 2011-12-07 | Perforation | 848.00 | 848.50 | 13 |
| 2011-12-07 | Perforation | 867.90 | 868.40 | 13 |
| 2011-12-07 | Perforation | 886.10 | 886.60 | 13 |
| 2011-12-07 | Perforation | 933.00 | 936.00 | 13 |
| 2011-12-07 | Perforation | 946.00 | 949.00 | 13 |
| 2011-12-07 | Perforation | 624.80 | 625.80 | 13 |
| 2011-12-07 | Perforation | 954.90 | 955.40 | 13 |
| 2011-12-07 | Perforation | 1003.00 | 1003.50 | 13 |
| 2011-12-07 | Perforation | 1023.50 | 1024.00 | 13 |
| 2011-12-07 | Perforation | 1041.30 | 1042.80 | 13 |
| 2011-12-07 | Perforation | 1055.70 | 1057.70 | 13 |
| 2011-12-07 | Perforation | 1072.60 | 1073.10 | 13 |
| 2011-12-07 | Perforation | 1080.00 | 1083.00 | 13 |
| 2011-12-07 | Perforation | 1094.60 | 1096.60 | 13 |
| 2011-12-07 | Perforation | 1099.00 | 1099.50 | 13 |
| 2011-12-07 | Perforation | 1099.90 | 1101.90 | 13 |
| 2011-12-07 | Perforation | 637.20 | 637.70 | 13 |
| 2011-12-07 | Perforation | 1103.40 | 1103.90 | 13 |
| 2011-12-07 | Perforation | 1116.70 | 1117.20 | 13 |
| 2011-12-07 | Perforation | 1118.20 | 1118.70 | 13 |
| 2011-12-07 | Perforation | 1121.10 | 1121.60 | 13 |
| 2011-12-07 | Perforation | 1122.30 | 1122.80 | 13 |
| 2011-12-07 | Perforation | 1142.80 | 1143.30 | 13 |
| 2011-12-07 | Perforation | 1146.50 | 1147.00 | 13 |
| 2011-12-07 | Perforation | 1147.40 | 1147.90 | 13 |
| 2011-12-14 | Fracture | 621.40 | 1147.90 | 0 |
| 2011-12-07 | Perforation | 644.40 | 645.90 | 13 |
| 2011-12-07 | Perforation | 653.90 | 654.40 | 13 |
| 2011-12-07 | Perforation | 662.10 | 662.60 | 13 |
| 2011-12-07 | Perforation | 706.80 | 707.30 | 13 |
| 2011-12-07 | Perforation | 783.10 | 784.60 | 13 |
| 2011-12-07 | Perforation | 785.70 | 786.20 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 7679 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8747 | 0.0 | 0.0 | 0.0 |
| 2015 | 8742 | 0.0 | 0.0 | 0.0 |
| 2016 | 8760 | 0.0 | 0.0 | 0.0 |
| 2017 | 8669 | 0.0 | 0.0 | 0.0 |
| 2018 | 8400 | 0.0 | 0.0 | 0.0 |
| 2019 | 8660 | 0.0 | 0.0 | 0.0 |
| 2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[6]