If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284291114000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.375912,"lon":-113.972127,"icon":""}]} |
Location: 00/14-11-028-29W4/0 | |
Location Alias: 00/14-11-28-29 W4M | |
Location Alias 2: 00/14-11-028-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 29 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 14-11-28-29 | |
Operator Name: Ember Resources Inc. | |
License Number: 0412082 | |
License Date: 2009-09-01 | |
License Status: Amended | |
Spud Date: 2010-02-07 | |
Final Drill Date: 2010-02-08 | |
Well Total Depth: 1840.00 m | |
Surface Hole Latitude: 51.375912 | |
Surface Hole Longitude: -113.972127 |
Date | Event |
---|---|
2009-09-01 | Obtained License |
2010-02-07 | Surface Casing Operation Performed |
2010-02-08 | Direction Drilling Operation Performed - Deviate |
2010-02-08 | Finished Drilling |
2010-02-08 | Well Mode changed to Drilled and Cased |
2010-02-09 | Production Casing Operation Performed |
2010-02-09 | Rig Released |
2010-02-19 | Well Log Performed |
2010-04-21 | Perforation Treatment Performed - Jet Perforation |
2010-10-02 | Perforation Treatment Performed - Jet Perforation |
2010-11-30 | Perforation Treatment Performed - Fractured |
2011-01-17 | Well Began Production |
2011-01-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-01-17 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-02-08 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-04-21 | Perforation | 1453.00 | 1456.00 | 13 |
2010-10-02 | Perforation | 1035.00 | 1038.00 | 13 |
2010-10-02 | Perforation | 890.00 | 893.00 | 13 |
2010-10-02 | Perforation | 751.00 | 754.00 | 13 |
2010-10-02 | Perforation | 775.00 | 778.00 | 13 |
2010-10-02 | Perforation | 695.00 | 698.00 | 13 |
2010-10-02 | Perforation | 731.00 | 734.00 | 13 |
2010-10-02 | Perforation | 800.00 | 802.00 | 13 |
2010-10-02 | Perforation | 844.00 | 847.00 | 13 |
2010-10-02 | Perforation | 868.00 | 870.00 | 13 |
2010-10-02 | Perforation | 824.00 | 827.00 | 13 |
2010-10-02 | Perforation | 957.50 | 959.50 | 13 |
2010-10-02 | Perforation | 832.00 | 835.00 | 13 |
2010-10-02 | Perforation | 1123.00 | 1126.00 | 13 |
2010-10-02 | Perforation | 1274.20 | 1274.70 | 13 |
2010-10-02 | Perforation | 1276.80 | 1278.80 | 13 |
2010-10-02 | Perforation | 1249.80 | 1250.30 | 13 |
2010-10-02 | Perforation | 1271.80 | 1272.80 | 13 |
2010-10-02 | Perforation | 1280.30 | 1280.80 | 13 |
2010-10-02 | Perforation | 1298.20 | 1298.70 | 13 |
2010-10-02 | Perforation | 1336.20 | 1336.70 | 13 |
2010-10-02 | Perforation | 1293.80 | 1294.30 | 13 |
2010-10-02 | Perforation | 964.00 | 967.00 | 13 |
2010-10-02 | Perforation | 1295.30 | 1295.80 | 13 |
2010-10-02 | Perforation | 1240.40 | 1240.90 | 13 |
2010-10-02 | Perforation | 1107.30 | 1108.30 | 13 |
2010-10-02 | Perforation | 1166.10 | 1166.60 | 13 |
2010-10-02 | Perforation | 1204.00 | 1207.00 | 13 |
2010-10-02 | Perforation | 1254.00 | 1256.00 | 13 |
2010-10-02 | Perforation | 1230.40 | 1233.40 | 13 |
2010-10-02 | Perforation | 1223.40 | 1223.90 | 13 |
2010-10-02 | Perforation | 1215.30 | 1216.30 | 13 |
2010-10-02 | Perforation | 1219.10 | 1219.60 | 13 |
2010-10-02 | Perforation | 898.00 | 899.00 | 13 |
2010-11-30 | Fracture | 695.00 | 1256.00 | 0 |
2010-11-30 | Fracture | 1107.30 | 1336.70 | 0 |
2010-10-02 | Perforation | 917.00 | 919.00 | 13 |
2010-10-02 | Perforation | 972.00 | 974.00 | 13 |
2010-10-02 | Perforation | 1040.00 | 1043.00 | 13 |
2010-10-02 | Perforation | 1085.00 | 1087.00 | 13 |
2010-10-02 | Perforation | 1016.00 | 1019.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 8371 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8669 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[6]