X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284291508000

Well Details

Well ID: 0284291508000
Loading map...
Location: 00/08-15-028-29W4/0
Location Alias: 00/08-15-28-29 W4M
Location Alias 2: 00/08-15-028-29 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 29
Section: 15
County/Municipality: Rocky View County
Well Name: PWEI UNIT CROSSE 8-15-28-29
Operator Name: TAQA North Ltd.
License Number: 0073451
License Date: 1978-12-12
License Status: Abandoned
Spud Date: 1979-06-01
Final Drill Date: 1979-06-29
Well Total Depth: 2760.00 m
Surface Hole Latitude: 51.394072
Surface Hole Longitude: -113.993075

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-12 Obtained License
1979-06-29 Finished Drilling
1979-06-29 Well Log Performed
1979-07-01 Production Casing Operation Performed
1979-07-03 Well Mode changed to Drilled and Cased
1980-01-23 Perforation Treatment Performed - Jet Perforation
1980-01-25 Perforation Treatment Performed - Fractured
1980-01-28 Well Began Production
1980-01-28 Well Fluid changed to Gas
1980-01-28 Well Mode changed to Flowing
2005-12-29 Well Fluid changed to Gas
2005-12-29 Well Mode changed to Suspended
2009-09-08 Well Log Performed
2009-09-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-14 Perforation Treatment Performed - Jet Perforation
2009-09-14 Well Fluid changed to Gas
2009-09-14 Well Mode changed to Abandoned Zone
2009-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-17 Perforation Treatment Performed - Jet Perforation
2009-09-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-19 Plug Back Performed
2009-09-20 Perforation Treatment Performed - Cement Squeeze
2009-09-21 Perforation Treatment Performed - Jet Perforation
2009-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-09-24 Plug Back Performed
2009-09-26 Well Abandoned
2009-09-26 Well Fluid changed to Gas
2009-09-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-23 Perforation 2708.50 2710.50 13
2009-09-19 Packing Device Capped w/Cement 1268.80 1276.80 0
2009-09-20 Cement Squeeze 1050.00 1051.00 0
2009-09-21 Perforation 760.00 761.00 14
2009-09-21 Perforation 610.00 611.00 14
2009-09-22 Packing Device Capped w/Cement 760.00 761.00 0
2009-09-24 Packing Device Capped w/Cement 594.80 595.20 0
1980-01-25 Fracture 2708.50 2710.50 0
2009-09-14 Packing Device Capped w/Cement 1597.80 1598.20 0
2009-09-14 Perforation 1600.00 1601.00 14
2009-09-14 Perforation 1295.00 1296.00 14
2009-09-17 Packing Device Capped w/Cement 1589.80 1597.80 0
2009-09-17 Perforation 1282.00 1283.00 14
2009-09-17 Perforation 1050.00 1051.00 14
2009-09-18 Packing Device Capped w/Cement 1276.80 1277.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 6423 0.0 0.0 0.0
1981 8143 0.0 0.0 0.0
1982 7673 0.0 0.0 0.0
1983 8444 0.0 0.0 0.0
1984 7741 0.0 0.0 0.0
1985 7005 0.0 0.0 0.0
1986 7968 0.0 0.0 0.0
1987 8677 0.0 0.0 0.0
1988 8314 0.0 0.0 0.0
1989 8614 0.0 0.0 0.0
1990 8212 0.0 0.0 0.0
1991 7989 0.0 0.0 0.0
1992 8507 0.0 0.0 0.0
1993 8227 0.0 0.0 0.0
1994 8399 0.0 0.0 0.0
1995 7618 0.0 0.0 0.0
1996 7663 0.0 0.0 0.0
1997 7311 0.0 0.0 0.0
1998 8571 0.0 0.0 0.0
1999 3383 0.0 0.0 0.0
2000 108 0.0 0.0 0.0
2004 2492 0.0 0.0 0.0
2005 48 0.0 0.0 0.0

For data sources see[5]

References