If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284293616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.441754,"lon":-113.944136,"icon":""}]} |
Location: 00/16-36-028-29W4/0 | |
Location Alias: 00/16-36-28-29 W4M | |
Location Alias 2: 00/16-36-028-29 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 29 | |
Section: 36 | |
County/Municipality: Rocky View County | |
Well Name: SBLZ CROSSE 16-36C-28-29 | |
Operator Name: Silver Blaze Energy Ltd. | |
License Number: 0057177 | |
License Date: 1976-02-20 | |
License Status: RecCertified | |
Spud Date: 1976-02-24 | |
Final Drill Date: 1976-03-05 | |
Well Total Depth: 1716.00 m | |
Surface Hole Latitude: 51.441754 | |
Surface Hole Longitude: -113.944136 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-02-20 | Obtained License |
1976-03-05 | Finished Drilling |
1976-03-06 | Drill Stem Test Performed |
1976-03-07 | Drill Stem Test Performed |
1976-03-08 | Production Casing Operation Performed |
1976-03-22 | Well Mode changed to Drilled and Cased |
1976-05-04 | Perforation Treatment Performed - Jet Perforation |
1976-05-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-05-12 | Perforation Treatment Performed - Fractured |
1976-08-15 | Well Began Production |
1976-08-15 | Well Fluid changed to Crude Oil |
1976-08-15 | Well Mode changed to Pumping |
1976-12-16 | Well Fluid changed to Crude Oil |
1976-12-16 | Well Mode changed to Suspended |
1985-07-09 | Well Fluid changed to Crude Oil |
1985-07-09 | Well Mode changed to Pumping |
1985-08-01 | Well Fluid changed to Crude Oil |
1985-08-01 | Well Mode changed to Suspended |
1989-06-27 | Well Fluid changed to Crude Oil |
1989-06-27 | Well Mode changed to Pumping |
1990-12-01 | Well Fluid changed to Crude Oil |
1990-12-01 | Well Mode changed to Suspended |
1991-08-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-08-17 | Perforation Treatment Performed - Jet Perforation |
1991-08-17 | Plug Back Performed |
1991-08-17 | Well Log Performed |
1991-08-18 | Perforation Treatment Performed - Remedial Casing |
1991-08-18 | Well Fluid changed to Crude Oil |
1991-08-18 | Well Mode changed to Abandoned |
1991-08-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-05-04 | Perforation | 1691.00 | 1692.60 | 7 |
1976-05-06 | Acid Treatment | 1691.00 | 1692.60 | 0 |
1976-05-12 | Fracture | 1691.00 | 1692.60 | 0 |
1991-08-17 | Packing Device Capped w/Cement | 1677.00 | 1685.00 | 0 |
1991-08-17 | Perforation | 254.00 | 255.00 | 13 |
1991-08-18 | Remedial Casing Cementing | 254.00 | 255.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 3236 | 0.0 | 0.0 | 0.0 |
1985 | 91 | 0.0 | 0.0 | 0.0 |
1989 | 1824 | 0.0 | 0.0 | 0.0 |
1990 | 1680 | 0.0 | 0.0 | 0.0 |
1991 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]