X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285010504000

Well Details

Well ID: 0285010504000
Loading map...
Location: 00/04-05-028-01W5/0
Location Alias: 00/04-05-28-01 W5M
Location Alias 2: 00/04-05-028-01 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 01
Section: 05
County/Municipality: Rocky View County
Well Name: BPC ET AL CROSSFIELD 4-5-28-1
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0206592
License Date: 1997-09-25
License Status: Suspension
Spud Date: 1997-09-27
Final Drill Date: 1997-10-21
Well Total Depth: 2590.00 m
Surface Hole Latitude: 51.357158
Surface Hole Longitude: -114.117927

For data sources see[1][2]

Well History

Date Event
1997-09-25 Obtained License
1997-09-28 Well Log Performed
1997-10-01 Surface Casing Operation Performed
1997-10-04 Direction Drilling Operation Performed - Deviate
1997-10-17 Well Log Performed
1997-10-21 Finished Drilling
1997-10-21 Well Log Performed
1997-10-25 Production Casing Operation Performed
1997-10-25 Rig Released
1997-10-25 Well Mode changed to Drilled and Cased
1997-11-01 Perforation Treatment Performed - Jet Perforation
1997-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-03 Perforation Treatment Performed - Fractured
1997-11-04 Perforation Treatment Performed - Jet Perforation
1997-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-17 Well Log Performed
1997-11-19 Well Log Performed
1997-11-24 Well Log Performed
1997-12-01 Well Log Performed
1997-12-10 Well Log Performed
1997-12-11 Well Log Performed
1998-08-17 Perforation Treatment Performed - Jet Perforation
2003-07-19 Well Fluid changed to Gas
2003-07-19 Well Mode changed to Testing
2010-11-04 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2010-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-10 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-10-04 1044.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-01 Perforation 2523.00 2524.00 13
2010-11-05 Packing Device Capped w/Cement 2469.50 2477.50 0
1997-11-01 Perforation 2525.50 2530.00 13
1997-11-02 Acid Treatment 2523.00 2530.00 0
1997-11-03 Fracture 2523.00 2530.00 0
1997-11-04 Perforation 2535.00 2551.00 13
1997-11-05 Acid Treatment 2535.00 2551.00 0
1998-08-17 Perforation 2485.00 2492.00 18
2010-11-04 Packing Dev Cpd w/Res-Gyp Cem 2531.00 2534.00 0
2010-11-05 Packing Device Capped w/Cement 2512.00 2520.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 48 0.0 0.0 0.0

For data sources see[6]

References