If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285010715000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.373591,"lon":-114.127676,"icon":""}]} |
Location: 00/15-07-028-01W5/0 | |
Location Alias: 00/15-07-28-01 W5M | |
Location Alias 2: 00/15-07-028-01 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 01 | |
Section: 07 | |
County/Municipality: Rocky View County | |
Well Name: KALLISTO HZ CROSS 15-7-28-1 | |
Operator Name: Steelhead Petroleum Ltd. | |
License Number: 0429064 | |
License Date: 2010-12-24 | |
License Status: Suspension | |
Spud Date: 2011-01-07 | |
Final Drill Date: 2011-01-26 | |
Well Total Depth: 3525.00 m | |
Surface Hole Latitude: 51.373591 | |
Surface Hole Longitude: -114.127676 |
Date | Event |
---|---|
2010-12-24 | Obtained License |
2011-01-12 | Surface Casing Operation Performed |
2011-01-16 | Direction Drilling Operation Performed - Deviate |
2011-01-19 | Direction Drilling Operation Performed - Horizontal |
2011-01-21 | Intermediate Casing Operation Performed |
2011-01-26 | Finished Drilling |
2011-01-26 | Well Log Performed |
2011-01-26 | Well Mode changed to Drilled and Cased |
2011-01-29 | Liner Casing Operation Performed |
2011-01-30 | Rig Released |
2011-02-18 | Well Log Performed |
2011-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-02-21 | Perforation Treatment Performed - Open-Hole Completion |
2011-03-01 | Well Began Production |
2011-03-01 | Well Fluid changed to Gas |
2011-03-01 | Well Mode changed to Flowing |
2011-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-24 | Well Fluid changed to Gas |
2013-03-24 | Well Mode changed to Suspended |
2013-06-20 | Well Fluid changed to Gas |
2013-06-20 | Well Mode changed to Flowing |
2017-06-01 | Well Fluid changed to Gas |
2017-06-01 | Well Mode changed to Suspended |
2018-07-01 | Well Fluid changed to Gas |
2018-07-01 | Well Mode changed to Flowing |
2018-08-01 | Well Fluid changed to Gas |
2018-08-01 | Well Mode changed to Suspended |
2019-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-06 | Plug Back Performed |
2019-11-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-11-07 | Plug Back Performed |
2019-11-07 | Well Fluid changed to Gas |
2019-11-07 | Well Mode changed to Abandoned Zone |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-01-16 | 1858.33 | Deviate (5 - 79 degrees) |
2011-01-19 | 2300.59 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-21 | Open Hole/Barefoot Completion | 3504.50 | 3525.00 | 0 |
2011-03-26 | Multi-Stage Fracture | 2878.10 | 2878.90 | 0 |
2011-03-26 | Multi-Stage Fracture | 2798.00 | 2798.80 | 0 |
2011-03-26 | Multi-Stage Fracture | 2717.70 | 2718.50 | 0 |
2011-03-26 | Multi-Stage Fracture | 2637.60 | 2638.40 | 0 |
2011-03-27 | Multi-Stage Fracture | 2558.90 | 2559.70 | 0 |
2011-03-27 | Multi-Stage Fracture | 2477.80 | 2478.60 | 0 |
2011-03-27 | Multi-Stage Fracture | 2399.60 | 2400.30 | 0 |
2019-11-06 | Packing Device Capped w/Cement | 2066.00 | 2240.00 | 0 |
2019-11-07 | Packing Device Capped w/Cement | 1928.00 | 1938.00 | 0 |
2011-02-21 | Multi-Stage Fracture | 3498.00 | 3498.80 | 0 |
2011-03-22 | Multi-Stage Fracture | 3445.50 | 3446.30 | 0 |
2011-03-22 | Multi-Stage Fracture | 3353.30 | 3354.00 | 0 |
2011-03-22 | Multi-Stage Fracture | 3274.00 | 3274.80 | 0 |
2011-03-23 | Multi-Stage Fracture | 3195.70 | 3196.40 | 0 |
2011-03-23 | Multi-Stage Fracture | 3117.80 | 3118.60 | 0 |
2011-03-23 | Multi-Stage Fracture | 3026.70 | 3027.50 | 0 |
2011-03-23 | Multi-Stage Fracture | 2958.90 | 2959.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3766 | 0.0 | 0.0 | 0.0 |
2012 | 4140 | 0.0 | 0.0 | 0.0 |
2013 | 2806 | 0.0 | 0.0 | 0.0 |
2014 | 2928 | 0.0 | 0.0 | 0.0 |
2015 | 7719 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 2137 | 0.0 | 0.0 | 0.0 |
2018 | 1 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-11-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]