If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285011406002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.391938,"lon":-114.040477,"icon":""}]} |
Location: 00/06-14-028-01W5/2 | |
Location Alias: 00/06-14-28-01 W5M | |
Location Alias 2: 00/06-14-028-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 01 | |
Section: 14 | |
County/Municipality: Rocky View County | |
Well Name: PMW G-3 CROSSE 6-14-28-1 | |
Operator Name: TAQA North Ltd. | |
License Number: 0044616 | |
License Date: 1972-12-22 | |
License Status: Suspension | |
Spud Date: 1972-12-27 | |
Final Drill Date: 1973-01-13 | |
Well Total Depth: 2372.90 m | |
Surface Hole Latitude: 51.391938 | |
Surface Hole Longitude: -114.040477 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1972-12-22 | Obtained License |
1973-01-13 | Finished Drilling |
1973-01-13 | Well Mode changed to Drilled and Cased |
1973-01-15 | Production Casing Operation Performed |
1973-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1973-01-20 | Perforation Treatment Performed - Jet Perforation |
1973-01-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1974-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-03-06 | Perforation Treatment Performed - Jet Perforation |
1974-09-01 | Well Began Injection |
1974-09-01 | Well Fluid changed to Water |
1974-09-01 | Well Type changed to Disposal |
1975-06-11 | Well Log Performed |
1985-11-01 | Well Fluid changed to Water |
1985-11-01 | Well Mode changed to Suspended |
1985-11-01 | Well Type changed to Disposal |
1989-03-17 | Well Log Performed |
1989-03-18 | Perforation Treatment Performed - Jet Perforation |
1989-10-01 | Well Fluid changed to Water |
1989-10-01 | Well Type changed to Disposal |
2001-05-01 | Perforation Treatment Performed - Jet Perforation |
2001-05-02 | Perforation Treatment Performed - Remedial Casing |
2001-05-03 | Perforation Treatment Performed - Jet Perforation |
2001-05-03 | Perforation Treatment Performed - Remedial Casing |
2001-05-07 | Perforation Treatment Performed - Jet Perforation |
2008-11-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-11-28 | Plug Back Performed |
2008-11-28 | Well Fluid changed to Water |
2008-11-28 | Well Log Performed |
2008-11-28 | Well Mode changed to Abandoned Zone |
2008-11-28 | Well Type changed to Disposal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1973-01-20 | Perforation | 2334.20 | 2337.80 | 7 |
1989-03-18 | Perforation | 2050.00 | 2054.00 | 13 |
1989-03-18 | Perforation | 2056.00 | 2066.00 | 13 |
1989-03-18 | Perforation | 2068.00 | 2072.00 | 13 |
2001-05-01 | Perforation | 1378.30 | 1378.80 | 9 |
2001-05-02 | Remedial Casing Cementing | 1378.30 | 1378.80 | 0 |
2001-05-03 | Perforation | 382.00 | 385.00 | 13 |
2001-05-03 | Remedial Casing Cementing | 382.00 | 385.00 | 0 |
2001-05-07 | Perforation | 1327.70 | 1334.40 | 13 |
2001-05-07 | Perforation | 1344.20 | 1353.30 | 13 |
2008-11-28 | Packing Device Capped w/Cement | 2035.00 | 2043.00 | 0 |
1973-01-20 | Acid Treatment | 2334.20 | 2337.80 | 0 |
1973-01-26 | Acid Treatment | 2334.20 | 2337.80 | 0 |
1974-03-04 | Packing Device Capped w/Cement | 2109.40 | 2118.40 | 0 |
1974-03-06 | Perforation | 2070.50 | 2074.20 | 7 |
1974-03-06 | Perforation | 2063.80 | 2068.10 | 7 |
1974-03-06 | Perforation | 2058.30 | 2062.00 | 7 |
1974-03-06 | Perforation | 2052.80 | 2055.30 | 7 |
1974-03-06 | Acid Treatment | 2052.80 | 2074.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
1976 | 0 | 0.0 | 0.0 | 0.0 |
1977 | 0 | 0.0 | 0.0 | 0.0 |
1978 | 0 | 0.0 | 0.0 | 0.0 |
1979 | 0 | 0.0 | 0.0 | 0.0 |
1980 | 0 | 0.0 | 0.0 | 0.0 |
1981 | 0 | 0.0 | 0.0 | 0.0 |
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 0 | 0.0 | 0.0 | 0.0 |
1985 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]