X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285011416000

Well Details

Well ID: 0285011416000
Loading map...
Location: 00/16-14-028-01W5/0
Location Alias: 00/16-14-28-01 W5M
Location Alias 2: 00/16-14-028-01 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 01
Section: 14
County/Municipality: Rocky View County
Well Name: TRANSCAN PPL CROSSE 16-14-28-1
Operator Name: TransCanada Energy Ltd.
License Number: 0019288
License Date: 1960-06-29
License Status: Issued
Spud Date: 1960-07-14
Final Drill Date: 1960-09-03
Well Total Depth: 2769.10 m
Surface Hole Latitude: 51.400136
Surface Hole Longitude: -114.027524

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-29 Obtained License
1960-08-03 Drill Stem Test Performed
1960-08-30 Drill Stem Test Performed
1960-08-31 Drill Stem Test Performed
1960-09-03 Finished Drilling
1960-09-05 Production Casing Operation Performed
1960-12-06 Well Mode changed to Drilled and Cased
1965-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-23 Perforation Treatment Performed - Jet Perforation
1965-02-14 Well Began Production
1965-02-14 Well Fluid changed to Gas
1965-02-14 Well Mode changed to Flowing
1966-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-01 Well Fluid changed to Crude Oil
1972-08-01 Well Mode changed to Flowing
1979-01-01 Well Fluid changed to Gas
1979-01-01 Well Mode changed to Flowing
1993-06-01 Well Fluid changed to Gas
1993-06-01 Well Type changed to Storage
1993-07-21 Well Log Performed
2017-08-31 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-01-23 Perforation 2307.90 2315.30 7
1965-01-23 Perforation 2316.50 2325.90 7
1965-01-23 Acid Treatment 2307.90 2325.90 0
1966-12-29 Acid Treatment 2307.90 2325.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 8692 0.0 0.0 0.0
1970 8609 0.0 0.0 0.0
1971 8574 0.0 0.0 0.0
1972 8597 0.0 0.0 0.0
1973 4805 0.0 0.0 0.0
1974 192 0.0 0.0 0.0
1975 1584 0.0 0.0 0.0
1976 989 0.0 0.0 0.0
1977 3145 0.0 0.0 0.0
1978 2047 0.0 0.0 0.0
1979 5376 0.0 0.0 0.0
1980 3149 0.0 0.0 0.0
1981 2131 0.0 0.0 0.0
1982 3100 0.0 0.0 0.0
1983 1176 0.0 0.0 0.0
1984 2428 0.0 0.0 0.0
1985 3255 0.0 0.0 0.0
1986 4983 0.0 0.0 0.0
1987 4843 0.0 0.0 0.0
1988 4240 0.0 0.0 0.0
1989 2777 0.0 0.0 0.0
1990 2431 0.0 0.0 0.0
1991 2718 0.0 0.0 0.0
1992 5477 0.0 0.0 0.0
1993 3144 0.0 0.0 0.0
1994 2365 0.0 0.0 0.0
1995 3888 0.0 0.0 0.0
1996 2935 0.0 0.0 0.0
1997 2763 0.0 0.0 0.0
1998 2361 0.0 0.0 0.0
1999 1931 0.0 0.0 0.0
2000 4645 0.0 0.0 0.0
2001 2592 0.0 0.0 0.0
2002 2280 0.0 0.0 0.0
2003 5400 0.0 0.0 0.0
2004 2892 0.0 0.0 0.0
2005 3262 0.0 0.0 0.0
2006 1098 0.0 0.0 0.0
2007 1791 0.0 0.0 0.0
2008 2115 0.0 0.0 0.0
2009 1408 0.0 0.0 0.0
2010 2366 0.0 0.0 0.0
2011 1855 0.0 0.0 0.0
2012 1042 0.0 0.0 0.0
2013 1974 0.0 0.0 0.0
2014 5074 0.0 0.0 0.0
2015 324 0.0 0.0 0.0
2016 760 0.0 0.0 0.0
2017 1411 0.0 0.0 0.0
2018 2058 0.0 0.0 0.0
2019 1763 0.0 0.0 0.0
2020 860 0.0 0.0 0.0

For data sources see[5]

References