X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285012510000

Well Details

Well ID: 0285012510000
Loading map...
Location: 00/10-25-028-01W5/0
Location Alias: 00/10-25-28-01 W5M
Location Alias 2: 00/10-25-028-01 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 01
Section: 25
County/Municipality: Rocky View County
Well Name: PWEI ET AL CROSSFIELD 10-25-28-1
Operator Name: TAQA North Ltd.
License Number: 0022221
License Date: 1962-03-07
License Status: Abandoned
Spud Date: 1962-03-12
Final Drill Date: 1962-04-19
Well Total Depth: 2737.70 m
Surface Hole Latitude: 51.425626
Surface Hole Longitude: -114.010512

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-03-07 Obtained License
1962-04-02 Drill Stem Test Performed
1962-04-19 Finished Drilling
1962-04-21 Drill Stem Test Performed
1962-04-22 Drill Stem Test Performed
1962-04-23 Perforation Treatment Performed - Open-Hole Completion
1962-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-10-11 Perforation Treatment Performed - Slotted Liner or Casing
1962-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-10 Well Mode changed to Drilled and Cased
1966-10-26 Perforation Treatment Performed - Condensate Squeeze
1968-03-01 Well Began Production
1968-03-01 Well Fluid changed to Gas
1968-03-01 Well Mode changed to Flowing
1968-12-05 Liner Casing Operation Performed
1968-12-07 Perforation Treatment Performed - Jet Perforation
1968-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-21 Perforation Treatment Performed - Fractured
2006-12-20 Well Fluid changed to Gas
2006-12-20 Well Mode changed to Suspended
2018-09-12 Well Log Performed
2018-09-26 Well Log Performed
2018-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-27 Plug Back Performed
2018-09-27 Well Fluid changed to Gas
2018-09-27 Well Mode changed to Abandoned Zone
2018-09-28 Well Log Performed
2018-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-29 Perforation Treatment Performed - Bridge Plug No Cement Required
2018-09-29 Perforation Treatment Performed - Jet Perforation
2018-09-29 Plug Back Performed
2018-09-29 Well Log Performed
2018-10-01 Perforation Treatment Performed - Bridge Plug No Cement Required
2018-10-01 Perforation Treatment Performed - Jet Perforation
2018-10-01 Well Log Performed
2018-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-02 Plug Back Performed
2018-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-03 Perforation Treatment Performed - Bridge Plug No Cement Required
2018-10-03 Perforation Treatment Performed - Jet Perforation
2018-10-03 Plug Back Performed
2018-10-03 Well Log Performed
2018-10-04 Perforation Treatment Performed - Cement Plug
2018-10-04 Plug Back Performed
2018-10-23 Well Abandoned
2018-10-23 Well Fluid changed to Gas
2018-10-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-04-23 Open Hole/Barefoot Completion 2696.00 2737.70 0
2018-09-27 Packing Device Capped w/Cement 2633.00 2670.00 0
2018-09-29 Perforation 2030.00 2032.00 26
2018-09-29 Bridge Plug, No Cement 2035.00 2035.30 0
2018-09-29 Packing Device Capped w/Cement 2015.00 2658.30 0
2018-10-01 Perforation 1125.00 1127.00 17
2018-10-01 Bridge Plug, No Cement 1132.00 1132.30 0
2018-10-02 Packing Device Capped w/Cement 1090.00 1120.00 0
2018-10-03 Packing Device Capped w/Cement 879.00 887.00 0
2018-10-03 Perforation 560.00 562.00 17
2018-10-03 Perforation 435.00 437.00 17
1962-08-31 Acid Treatment 2696.00 2737.70 0
2018-10-03 Bridge Plug, No Cement 600.00 600.30 0
2018-10-04 Cement Plug 386.00 598.00 0
1962-10-11 Slotted Liner 2696.00 2737.70 0
1962-11-04 Acid Treatment 2696.00 2737.70 0
1966-10-26 Condensate Squeeze 2696.00 2737.70 0
1968-12-07 Perforation 2710.90 2712.10 26
1968-12-11 Acid Treatment 2710.90 2712.10 0
1968-12-15 Acid Treatment 2710.90 2712.10 0
1973-06-21 Fracture 2710.90 2712.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 397 0.0 0.0 0.0
1969 5800 0.0 0.0 0.0
1970 7164 0.0 0.0 0.0
1971 6923 0.0 0.0 0.0
1972 6987 0.0 0.0 0.0
1973 5838 0.0 0.0 0.0
1974 6507 0.0 0.0 0.0
1975 8091 0.0 0.0 0.0
1976 7528 0.0 0.0 0.0
1977 7559 0.0 0.0 0.0
1978 7906 0.0 0.0 0.0
1979 7362 0.0 0.0 0.0
1980 8338 0.0 0.0 0.0
1981 8140 0.0 0.0 0.0
1982 5195 0.0 0.0 0.0
1983 3082 0.0 0.0 0.0
1985 813 0.0 0.0 0.0
1986 2725 0.0 0.0 0.0
1987 4791 0.0 0.0 0.0
1988 7333 0.0 0.0 0.0
1989 6869 0.0 0.0 0.0
1990 6997 0.0 0.0 0.0
1991 7437 0.0 0.0 0.0
1992 7982 0.0 0.0 0.0
1993 737 0.0 0.0 0.0
1994 472 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References