X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285021506000

Well Details

Well ID: 0285021506000
Loading map...
Location: 00/06-15-028-02W5/0
Location Alias: 00/06-15-28-02 W5M
Location Alias 2: 00/06-15-028-02 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 02
Section: 15
County/Municipality: Rocky View County
Well Name: Canlin CROSS 6-15-28-2
Operator Name: Bighorn Energy Corporation
License Number: 0018220
License Date: 1959-12-01
License Status: Issued
Spud Date: 1959-12-14
Final Drill Date: 1960-01-25
Well Total Depth: 2628.00 m
Surface Hole Latitude: 51.393011
Surface Hole Longitude: -114.203796

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-01 Obtained License
1960-01-08 Drill Stem Test Performed
1960-01-25 Finished Drilling
1960-01-26 Production Casing Operation Performed
1960-02-07 Perforation Treatment Performed - Open-Hole Completion
1960-02-09 Perforation Treatment Performed - Acid Wash - No Pressure
1960-07-14 Well Mode changed to Drilled and Cased
1961-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-12-31 Well Began Production
1961-12-31 Well Fluid changed to Gas
1961-12-31 Well Mode changed to Flowing
1965-10-14 Perforation Treatment Performed - Selective Jet Perforations
1965-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-01 Well Fluid changed to Gas
1965-12-01 Well Type changed to Storage
1974-11-01 Well Fluid changed to Gas
1974-11-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-02-07 Open Hole/Barefoot Completion 2595.70 2628.00 0
1960-02-09 Acid Wash 2595.70 2628.00 0
1961-10-23 Acid Treatment 2610.90 2628.00 0
1965-10-14 Selective Jet Perforations 2577.70 2579.20 0
1965-10-14 Selective Jet Perforations 2579.80 2581.70 0
1965-10-14 Selective Jet Perforations 2582.90 2584.10 0
1965-10-14 Selective Jet Perforations 2586.20 2588.10 0
1965-10-28 Acid Treatment 2577.70 2588.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 2043 0.0 0.0 0.0
1972 788 0.0 0.0 0.0
1973 3696 0.0 0.0 0.0
1974 4967 0.0 0.0 0.0
1975 7549 0.0 0.0 0.0
1976 4127 0.0 0.0 0.0
1977 5468 0.0 0.0 0.0
1978 5731 0.0 0.0 0.0
1979 7274 0.0 0.0 0.0
1980 6049 0.0 0.0 0.0
1981 3313 0.0 0.0 0.0
1982 3619 0.0 0.0 0.0
1983 5315 0.0 0.0 0.0
1984 2978 0.0 0.0 0.0
1985 5641 0.0 0.0 0.0
1986 3387 0.0 0.0 0.0
1987 6832 0.0 0.0 0.0
1988 5476 0.0 0.0 0.0
1989 5989 0.0 0.0 0.0
1990 3274 0.0 0.0 0.0
1991 3570 0.0 0.0 0.0
1992 8245 0.0 0.0 0.0
1993 8269 0.0 0.0 0.0
1994 8136 0.0 0.0 0.0
1995 7545 0.0 0.0 0.0
1996 8341 0.0 0.0 0.0
1997 8700 0.0 0.0 0.0
1998 8579 0.0 0.0 0.0
1999 8150 0.0 0.0 0.0
2000 8643 0.0 0.0 0.0
2001 8629 0.0 0.0 0.0
2002 8379 0.0 0.0 0.0
2003 8533 0.0 0.0 0.0
2004 8752 0.0 0.0 0.0
2005 8365 0.0 0.0 0.0
2006 8515 0.0 0.0 0.0
2007 8485 0.0 0.0 0.0
2008 8304 0.0 0.0 0.0
2009 5606 0.0 0.0 0.0
2010 7191 0.0 0.0 0.0
2011 6978 0.0 0.0 0.0
2012 8513 0.0 0.0 0.0
2013 7369 0.0 0.0 0.0
2014 7487 0.0 0.0 0.0
2015 7561 0.0 0.0 0.0
2016 6607 0.0 0.0 0.0
2017 8004 0.0 0.0 0.0
2018 4709 0.0 0.0 0.0
2019 7591 0.0 0.0 0.0
2020 2163 0.0 0.0 0.0

For data sources see[5]

References