X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285022001000

Well Details

Well ID: 0285022001000
Loading map...
Location: 00/01-20-028-02W5/0
Location Alias: 00/01-20-28-02 W5M
Location Alias 2: 00/01-20-028-02 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 02
Section: 20
County/Municipality: Rocky View County
Well Name: TENN A-1 CROSSFIELD 1-20-28-2
Operator Name: Canterra Energy Ltd.
License Number: 0013660
License Date: 1957-07-09
License Status: RecCertified
Spud Date: 1957-07-15
Final Drill Date: 1957-08-28
Well Total Depth: 2654.20 m
Surface Hole Latitude: 51.403808
Surface Hole Longitude: -114.239143

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-07-09 Obtained License
1957-07-16 Lost Circulation Occurred
1957-08-20 Drill Stem Test Performed
1957-08-24 Drill Stem Test Performed
1957-08-25 Drill Stem Test Performed
1957-08-26 Drill Stem Test Performed
1957-08-28 Finished Drilling
1957-08-28 Well Mode changed to Drilled and Cased
1957-08-29 Production Casing Operation Performed
1957-09-09 Perforation Treatment Performed - Jet Perforation
1957-09-10 Well Began Production
1957-09-10 Well Fluid changed to Crude Oil
1957-09-10 Well Mode changed to Flowing
1957-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-09-24 Perforation Treatment Performed - Cement Squeeze
1957-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-10-12 Perforation Treatment Performed - Jet Perforation
1957-10-17 Perforation Treatment Performed - Cement Squeeze
1957-10-20 Perforation Treatment Performed - Jet Perforation
1957-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-11-21 Perforation Treatment Performed - Cement Squeeze
1957-11-22 Perforation Treatment Performed - Jet Perforation
1957-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-11-29 Perforation Treatment Performed - Cement Squeeze
1957-12-01 Perforation Treatment Performed - Jet Perforation
1965-08-20 Perforation Treatment Performed - Selective Jet Perforations
1965-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-05 Well Fluid changed to Gas
1965-12-05 Well Mode changed to Flowing
1976-06-29 Well Log Performed
1977-06-21 Well Fluid changed to Gas
1977-06-21 Well Mode changed to Suspended
1988-10-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-21 Plug Back Performed
1988-10-21 Well Abandoned
1988-10-21 Well Fluid changed to Gas
1988-10-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-09-09 Perforation 2617.60 2620.10 26
1957-11-22 Perforation 2622.50 2623.40 13
1957-11-27 Acid Treatment 2622.50 2623.40 0
1957-11-29 Cement Squeeze 2622.50 2623.40 0
1957-12-01 Perforation 2615.20 2618.20 13
1965-08-20 Selective Jet Perforations 2609.40 2609.60 0
1965-08-20 Selective Jet Perforations 2610.60 2611.20 0
1965-08-20 Selective Jet Perforations 2612.10 2612.40 0
1965-08-20 Selective Jet Perforations 2613.70 2614.20 0
1965-09-24 Acid Treatment 2609.40 2618.20 0
1988-10-21 Packing Device Capped w/Cement 2579.00 2587.00 0
1957-09-17 Acid Treatment 2617.60 2620.10 0
1988-10-21 Packing Device Capped w/Cement 1898.00 1906.00 0
1957-09-24 Cement Squeeze 2617.60 2620.10 0
1957-10-12 Perforation 2614.90 2615.80 13
1957-10-12 Acid Treatment 2614.90 2615.80 0
1957-10-17 Cement Squeeze 2614.90 2615.80 0
1957-10-20 Perforation 2618.20 2619.50 13
1957-10-22 Acid Treatment 2618.20 2619.50 0
1957-11-21 Cement Squeeze 2618.20 2619.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1343 0.0 0.0 0.0
1969 8125 0.0 0.0 0.0
1970 7708 0.0 0.0 0.0
1971 329 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1957-07-16 Lost Circulation 39.90 92.00

For data sources see[6]

References