If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285022001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.403808,"lon":-114.239143,"icon":""}]} |
Location: 00/01-20-028-02W5/0 | |
Location Alias: 00/01-20-28-02 W5M | |
Location Alias 2: 00/01-20-028-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 02 | |
Section: 20 | |
County/Municipality: Rocky View County | |
Well Name: TENN A-1 CROSSFIELD 1-20-28-2 | |
Operator Name: Canterra Energy Ltd. | |
License Number: 0013660 | |
License Date: 1957-07-09 | |
License Status: RecCertified | |
Spud Date: 1957-07-15 | |
Final Drill Date: 1957-08-28 | |
Well Total Depth: 2654.20 m | |
Surface Hole Latitude: 51.403808 | |
Surface Hole Longitude: -114.239143 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-07-09 | Obtained License |
1957-07-16 | Lost Circulation Occurred |
1957-08-20 | Drill Stem Test Performed |
1957-08-24 | Drill Stem Test Performed |
1957-08-25 | Drill Stem Test Performed |
1957-08-26 | Drill Stem Test Performed |
1957-08-28 | Finished Drilling |
1957-08-28 | Well Mode changed to Drilled and Cased |
1957-08-29 | Production Casing Operation Performed |
1957-09-09 | Perforation Treatment Performed - Jet Perforation |
1957-09-10 | Well Began Production |
1957-09-10 | Well Fluid changed to Crude Oil |
1957-09-10 | Well Mode changed to Flowing |
1957-09-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-09-24 | Perforation Treatment Performed - Cement Squeeze |
1957-10-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-10-12 | Perforation Treatment Performed - Jet Perforation |
1957-10-17 | Perforation Treatment Performed - Cement Squeeze |
1957-10-20 | Perforation Treatment Performed - Jet Perforation |
1957-10-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-11-21 | Perforation Treatment Performed - Cement Squeeze |
1957-11-22 | Perforation Treatment Performed - Jet Perforation |
1957-11-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-11-29 | Perforation Treatment Performed - Cement Squeeze |
1957-12-01 | Perforation Treatment Performed - Jet Perforation |
1965-08-20 | Perforation Treatment Performed - Selective Jet Perforations |
1965-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-12-05 | Well Fluid changed to Gas |
1965-12-05 | Well Mode changed to Flowing |
1976-06-29 | Well Log Performed |
1977-06-21 | Well Fluid changed to Gas |
1977-06-21 | Well Mode changed to Suspended |
1988-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-10-21 | Plug Back Performed |
1988-10-21 | Well Abandoned |
1988-10-21 | Well Fluid changed to Gas |
1988-10-21 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-09-09 | Perforation | 2617.60 | 2620.10 | 26 |
1957-11-22 | Perforation | 2622.50 | 2623.40 | 13 |
1957-11-27 | Acid Treatment | 2622.50 | 2623.40 | 0 |
1957-11-29 | Cement Squeeze | 2622.50 | 2623.40 | 0 |
1957-12-01 | Perforation | 2615.20 | 2618.20 | 13 |
1965-08-20 | Selective Jet Perforations | 2609.40 | 2609.60 | 0 |
1965-08-20 | Selective Jet Perforations | 2610.60 | 2611.20 | 0 |
1965-08-20 | Selective Jet Perforations | 2612.10 | 2612.40 | 0 |
1965-08-20 | Selective Jet Perforations | 2613.70 | 2614.20 | 0 |
1965-09-24 | Acid Treatment | 2609.40 | 2618.20 | 0 |
1988-10-21 | Packing Device Capped w/Cement | 2579.00 | 2587.00 | 0 |
1957-09-17 | Acid Treatment | 2617.60 | 2620.10 | 0 |
1988-10-21 | Packing Device Capped w/Cement | 1898.00 | 1906.00 | 0 |
1957-09-24 | Cement Squeeze | 2617.60 | 2620.10 | 0 |
1957-10-12 | Perforation | 2614.90 | 2615.80 | 13 |
1957-10-12 | Acid Treatment | 2614.90 | 2615.80 | 0 |
1957-10-17 | Cement Squeeze | 2614.90 | 2615.80 | 0 |
1957-10-20 | Perforation | 2618.20 | 2619.50 | 13 |
1957-10-22 | Acid Treatment | 2618.20 | 2619.50 | 0 |
1957-11-21 | Cement Squeeze | 2618.20 | 2619.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1343 | 0.0 | 0.0 | 0.0 |
1969 | 8125 | 0.0 | 0.0 | 0.0 |
1970 | 7708 | 0.0 | 0.0 | 0.0 |
1971 | 329 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1957-07-16 | Lost Circulation | 39.90 | 92.00 |
For data sources see[6]