If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285023306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.436485,"lon":-114.227978,"icon":""}]} |
Location: 00/06-33-028-02W5/0 | |
Location Alias: 00/06-33-28-02 W5M | |
Location Alias 2: 00/06-33-028-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 02 | |
Section: 33 | |
County/Municipality: Rocky View County | |
Well Name: ROYALITE CROSSFIELD 6-33-28-2 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0019896 | |
License Date: 1960-10-27 | |
License Status: RecCertified | |
Spud Date: 1960-10-30 | |
Final Drill Date: 1960-11-13 | |
Well Total Depth: 2078.70 m | |
Surface Hole Latitude: 51.436485 | |
Surface Hole Longitude: -114.227978 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1960-10-27 | Obtained License |
1960-11-13 | Finished Drilling |
1960-11-13 | Well Mode changed to Drilled and Cased |
1960-11-15 | Production Casing Operation Performed |
1960-11-18 | Well Began Production |
1960-11-18 | Well Fluid changed to Crude Oil |
1960-11-18 | Well Mode changed to Flowing |
1960-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1960-11-19 | Perforation Treatment Performed - Jet Perforation |
1960-11-23 | Perforation Treatment Performed - Fractured |
1961-08-13 | Well Fluid changed to Crude Oil |
1961-08-13 | Well Mode changed to Pumping |
1965-02-16 | Perforation Treatment Performed - Condensate Squeeze |
1965-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1970-11-16 | Perforation Treatment Performed - Cement Plug |
1970-11-16 | Well Abandoned |
1970-11-16 | Well Fluid changed to Crude Oil |
1970-11-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1960-11-19 | Perforation | 2061.40 | 2064.40 | 13 |
1960-11-19 | Acid Treatment | 2061.40 | 2064.40 | 0 |
1960-11-23 | Fracture | 2061.40 | 2064.40 | 0 |
1965-02-16 | Condensate Squeeze | 2061.40 | 2064.40 | 0 |
1965-03-11 | Acid Treatment | 2061.40 | 2064.40 | 0 |
1970-11-16 | Cement Plug | 0.10 | 2078.70 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]