X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285033406000

Well Details

Well ID: 0285033406000
Loading map...
Location: 00/06-34-028-03W5/0
Location Alias: 00/06-34-28-03 W5M
Location Alias 2: 00/06-34-028-03 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 03
Section: 34
County/Municipality: Rocky View County
Well Name: VOYAGER ET AL CROSSFIELD 6-34-28-3
Operator Name: Voyager Petroleums Ltd
License Number: 0066729
License Date: 1977-11-14
License Status: RecCertified
Spud Date: 1978-01-06
Final Drill Date: 1978-02-12
Well Total Depth: 2770.30 m
Surface Hole Latitude: 51.435280
Surface Hole Longitude: -114.346135

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-14 Obtained License
1978-02-06 Drill Stem Test Performed
1978-02-12 Finished Drilling
1978-02-12 Well Mode changed to Drilled and Cased
1978-02-19 Production Casing Operation Performed
1978-06-03 Well Fluid changed to Crude Oil
1978-06-03 Well Mode changed to Potential
1978-06-04 Well Abandoned
1978-06-04 Well Fluid changed to Crude Oil
1978-06-04 Well Mode changed to Abandoned
1978-06-22 Perforation Treatment Performed - Jet Perforation
1978-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-26 Perforation Treatment Performed - Fractured
1978-07-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-04 Perforation Treatment Performed - Jet Perforation
1978-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-08 Perforation Treatment Performed - Cement Squeeze
1978-07-11 Perforation Treatment Performed - Cement Squeeze
1978-07-14 Perforation Treatment Performed - Cement Squeeze
1978-07-15 Well Log Performed
1978-07-17 Perforation Treatment Performed - Jet Perforation
1978-07-18 Well Log Performed
1978-07-19 Perforation Treatment Performed - Jet Perforation
1978-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-22 Perforation Treatment Performed - Fractured
1978-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-27 Perforation Treatment Performed - Cement Squeeze
1978-07-27 Perforation Treatment Performed - Jet Perforation
1978-07-28 Perforation Treatment Performed - Cement Squeeze
1978-07-28 Perforation Treatment Performed - Jet Perforation
1978-07-29 Well Log Performed
1978-07-30 Perforation Treatment Performed - Jet Perforation
1978-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-06-22 Perforation 2665.80 2667.00 3
1978-07-04 Perforation 2440.20 2441.40 3
1978-07-06 Acid Treatment 2440.20 2441.40 0
1978-07-08 Cement Squeeze 2414.30 2441.40 0
1978-07-11 Cement Squeeze 2414.30 2441.40 0
1978-07-14 Cement Squeeze 2414.30 2441.40 0
1978-07-17 Perforation 2421.00 2421.90 7
1978-07-17 Perforation 2422.90 2423.50 7
1978-07-17 Perforation 2423.80 2424.70 7
1978-07-19 Perforation 2421.00 2421.90 7
1978-07-19 Perforation 2422.90 2423.50 7
1978-06-22 Perforation 2672.80 2675.20 3
1978-07-19 Perforation 2423.80 2424.70 7
1978-07-20 Acid Treatment 2421.00 2424.70 0
1978-07-22 Fracture 2421.00 2424.70 0
1978-07-26 Packing Device Capped w/Cement 2389.00 2398.80 0
1978-07-27 Perforation 2313.40 2314.00 7
1978-07-27 Cement Squeeze 2313.40 2314.00 0
1978-07-28 Perforation 2283.00 2283.60 7
1978-07-28 Cement Squeeze 2283.00 2283.60 0
1978-07-30 Perforation 2290.90 2293.90 3
1978-08-01 Acid Treatment 2290.90 2293.90 0
1978-06-23 Acid Treatment 2665.80 2675.20 0
1978-08-04 Packing Device Capped w/Cement 2271.70 2279.30 0
1978-06-26 Fracture 2665.80 2675.20 0
1978-07-01 Packing Device Capped w/Cement 2648.10 2654.80 0
1978-07-04 Perforation 2414.30 2416.50 3
1978-07-04 Perforation 2421.00 2421.90 3
1978-07-04 Perforation 2422.90 2423.50 3
1978-07-04 Perforation 2423.80 2424.70 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1 0.0 0.0 0.0

For data sources see[5]

References