If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0285042910004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.425102,"lon":-114.52732,"icon":""}]} |
Location: 00/10-29-028-04W5/4 | |
Location Alias: 00/10-29-28-04 W5M | |
Location Alias 2: 00/10-29-028-04 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 5 | |
Range: 04 | |
Section: 29 | |
County/Municipality: Rocky View County | |
Well Name: TRIOIL BOTTREL 10-29-28-4 | |
Operator Name: ORLEN Upstream Canada Ltd. | |
License Number: 0273524 | |
License Date: 2002-09-06 | |
License Status: Suspension | |
Spud Date: 2010-10-12 | |
Final Drill Date: 2010-10-15 | |
Well Total Depth: 3980.00 m | |
Surface Hole Latitude: 51.425102 | |
Surface Hole Longitude: -114.527320 |
Date | Event |
---|---|
2002-09-06 | Obtained License |
2008-09-18 | Well Abandoned |
2010-10-15 | Finished Drilling |
2010-10-15 | Perforation Treatment Performed - Jet Perforation |
2010-10-15 | Well Mode changed to Drilled and Cased |
2010-10-16 | Perforation Treatment Performed - Jet Perforation |
2010-10-18 | Perforation Treatment Performed - Remedial Casing |
2010-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-10-22 | Perforation Treatment Performed - Jet Perforation |
2010-10-27 | Perforation Treatment Performed - Fractured |
2010-10-27 | Rig Released |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-10-15 | Perforation | 2445.00 | 2445.50 | 17 |
2010-10-15 | Perforation | 2330.00 | 2330.50 | 17 |
2010-10-16 | Perforation | 2359.00 | 2359.50 | 17 |
2010-10-18 | Remedial Casing Cementing | 2330.00 | 2359.50 | 0 |
2010-10-22 | Packing Device Capped w/Cement | 2429.00 | 2437.00 | 0 |
2010-10-22 | Perforation | 2406.00 | 2410.00 | 17 |
2010-10-27 | Fracture | 2406.00 | 2410.00 | 0 |
For data sources see[4]