X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285072307002

Well Details

Well ID: 0285072307002
Loading map...
Location: 00/07-23-028-07W5/2
Location Alias: 00/07-23-28-07 W5M
Location Alias 2: 00/07-23-028-07 W5/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 07
Section: 23
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 7-23-28-7
Operator Name: Canlin Energy Corporation
License Number: 0211473
License Date: 1998-01-05
License Status: Amended
Spud Date: 1998-02-14
Final Drill Date: 1998-05-08
Well Total Depth: 3717.00 m
Surface Hole Latitude: 51.404186
Surface Hole Longitude: -114.879358

For data sources see[1][2]

Well History

Date Event
1998-01-05 Obtained License
1998-02-16 Surface Casing Operation Performed
1998-02-26 Direction Drilling Operation Performed - Deviate
1998-03-17 Well Log Performed
1998-03-19 Intermediate Casing Operation Performed
1998-05-08 Finished Drilling
1998-05-08 Well Log Performed
1998-05-08 Well Mode changed to Drilled and Cased
1998-05-09 Well Log Performed
1998-05-12 Liner Casing Operation Performed
1998-05-15 Rig Released
1998-06-01 Well Log Performed
1998-07-08 Well Log Performed
1998-07-09 Perforation Treatment Performed - Jet Perforation
1998-07-10 Perforation Treatment Performed - Jet Perforation
1998-07-10 Well Log Performed
1998-07-11 Well Log Performed
1998-07-18 Perforation Treatment Performed - Fractured
1998-07-20 Well Log Performed
1998-07-21 Perforation Treatment Performed - Jet Perforation
1998-07-22 Perforation Treatment Performed - Jet Perforation
1998-07-25 Perforation Treatment Performed - Fractured
1998-11-28 Well Log Performed
1998-12-17 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-02-26 1154.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-07-09 Perforation 3609.50 3613.50 13
1998-07-10 Perforation 3599.00 3602.00 13
1998-07-10 Perforation 3603.00 3606.00 13
1998-07-18 Fracture 3560.00 3626.50 0
1998-07-21 Perforation 3290.00 3300.50 10
1998-07-21 Perforation 3304.00 3310.00 10
1998-07-21 Perforation 3314.00 3315.50 10
1998-07-21 Perforation 3317.00 3324.50 10
1998-07-21 Perforation 3334.00 3344.00 10
1998-07-22 Perforation 3256.00 3281.50 10
1998-07-25 Fracture 3256.00 3344.00 0
1998-07-09 Perforation 3615.00 3616.00 13
1998-07-09 Perforation 3616.50 3619.00 13
1998-07-09 Perforation 3621.50 3626.50 13
1998-07-10 Perforation 3560.00 3567.50 13
1998-07-10 Perforation 3572.00 3582.50 13
1998-07-10 Perforation 3587.00 3589.50 13
1998-07-10 Perforation 3593.00 3595.50 13
1998-07-10 Perforation 3597.00 3598.50 13

For data sources see[5]



References