X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285072314002

Well Details

Well ID: 0285072314002
Loading map...
Location: 00/14-23-028-07W5/2
Location Alias: 00/14-23-28-07 W5M
Location Alias 2: 00/14-23-028-07 W5/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 07
Section: 23
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 14-23-28-7
Operator Name: Canlin Energy Corporation
License Number: 0261115
License Date: 2001-10-26
License Status: Issued
Spud Date: 2001-11-11
Final Drill Date: 2002-02-04
Well Total Depth: 4052.00 m
Surface Hole Latitude: 51.402997
Surface Hole Longitude: -114.877810

For data sources see[1][2]

Well History

Date Event
2001-10-26 Obtained License
2001-11-14 Surface Casing Operation Performed
2001-11-16 Direction Drilling Operation Performed - Deviate
2001-12-14 Well Log Performed
2002-01-05 Direction Drilling Operation Performed - Sidetrack Fish
2002-01-10 Well Log Performed
2002-01-12 Intermediate Casing Operation Performed
2002-02-01 Well Log Performed
2002-02-02 Well Log Performed
2002-02-04 Finished Drilling
2002-02-04 Well Mode changed to Drilled and Cased
2002-02-05 Liner Casing Operation Performed
2002-02-07 Rig Released
2002-03-11 Well Log Performed
2002-03-12 Perforation Treatment Performed - Chemical Squeeze
2002-03-12 Perforation Treatment Performed - Jet Perforation
2002-03-12 Well Log Performed
2002-03-15 Perforation Treatment Performed - Fractured
2002-03-17 Perforation Treatment Performed - Jet Perforation
2002-03-17 Well Log Performed
2002-03-18 Perforation Treatment Performed - Jet Perforation
2002-03-19 Perforation Treatment Performed - Chemical Squeeze
2002-03-21 Perforation Treatment Performed - Fractured
2002-03-23 Perforation Treatment Performed - Jet Perforation
2002-03-23 Well Log Performed
2002-03-24 Perforation Treatment Performed - Chemical Squeeze
2002-03-27 Perforation Treatment Performed - Fractured
2002-03-29 Perforation Treatment Performed - Jet Perforation
2002-03-29 Well Log Performed
2002-03-30 Perforation Treatment Performed - Jet Perforation
2002-04-01 Perforation Treatment Performed - Chemical Squeeze
2002-04-03 Perforation Treatment Performed - Fractured
2002-04-05 Well Structure changed to Commingled
2002-07-18 Well Began Production
2002-07-18 Well Fluid changed to Gas
2002-07-18 Well Mode changed to Flowing
2011-03-12 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-11-16 630.00 Deviate (5 - 79 degrees)
2002-01-05 3411.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-12 Perforation 3979.00 3985.00 13
2002-03-18 Perforation 3742.00 3748.00 13
2002-03-18 Perforation 3739.00 3742.00 13
2002-03-18 Perforation 3737.00 3739.00 13
2002-03-18 Perforation 3726.00 3730.50 13
2002-03-18 Perforation 3716.50 3721.50 13
2002-03-18 Perforation 3710.00 3713.00 13
2002-03-18 Perforation 3680.00 3686.00 13
2002-03-18 Perforation 3688.50 3691.50 13
2002-03-19 Chemical Squeeze 3680.00 3772.00 0
2002-03-21 Fracture 3680.00 3772.00 0
2002-03-12 Perforation 3976.50 3979.00 13
2002-03-23 Perforation 3656.50 3662.00 13
2002-03-23 Perforation 3648.00 3654.00 13
2002-03-23 Perforation 3645.00 3648.00 13
2002-03-23 Perforation 3635.00 3641.00 13
2002-03-23 Perforation 3632.00 3635.00 13
2002-03-23 Perforation 3626.00 3632.00 13
2002-03-23 Perforation 3625.00 3626.00 13
2002-03-24 Chemical Squeeze 3625.00 3662.00 0
2002-03-27 Fracture 3625.00 3662.00 0
2002-03-29 Perforation 3604.00 3610.00 13
2002-03-12 Perforation 3959.00 3965.00 13
2002-03-29 Perforation 3601.00 3604.00 13
2002-03-29 Perforation 3580.50 3582.50 13
2002-03-29 Perforation 3596.00 3601.00 13
2002-03-29 Perforation 3587.00 3593.00 13
2002-03-29 Perforation 3586.00 3587.00 13
2002-03-29 Perforation 3568.50 3571.50 13
2002-03-29 Perforation 3562.50 3568.50 13
2002-03-29 Perforation 3560.00 3562.50 13
2002-03-30 Perforation 3571.50 3577.50 13
2002-03-30 Perforation 3554.00 3560.00 13
2002-03-12 Perforation 3958.00 3959.00 13
2002-03-30 Perforation 3551.00 3554.00 13
2002-03-30 Perforation 3544.00 3545.00 13
2002-03-30 Perforation 3538.50 3540.50 13
2002-03-30 Perforation 3528.00 3534.00 13
2002-03-30 Perforation 3545.00 3551.00 13
2002-03-30 Perforation 3522.00 3528.00 13
2002-03-30 Perforation 3519.00 3520.00 13
2002-03-30 Perforation 3521.00 3522.00 13
2002-03-30 Perforation 3513.50 3519.00 13
2002-04-01 Chemical Squeeze 3513.50 3610.00 0
2002-03-12 Chemical Squeeze 3958.00 3965.00 0
2002-04-03 Fracture 3513.50 3610.00 0
2002-03-12 Chemical Squeeze 3976.50 3985.00 0
2002-03-15 Fracture 3958.00 3985.00 0
2002-03-17 Perforation 3766.00 3772.00 13
2002-03-17 Perforation 3762.00 3766.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 4352 0.0 0.0 0.0
2003 8670 0.0 0.0 0.0
2004 8663 0.0 0.0 0.0
2005 7900 0.0 0.0 0.0
2006 8550 0.0 0.0 0.0
2007 8573 0.0 0.0 0.0
2008 8128 0.0 0.0 0.0
2009 8249 0.0 0.0 0.0
2010 8482 0.0 0.0 0.0
2011 7214 0.0 0.0 0.0
2012 8623 0.0 0.0 0.0
2013 7870 0.0 0.0 0.0
2014 8524 0.0 0.0 0.0
2015 8262 0.0 0.0 0.0
2016 8269 0.0 0.0 0.0
2017 8291 0.0 0.0 0.0
2018 7423 0.0 0.0 0.0
2019 6512 0.0 0.0 0.0
2020 2141 0.0 0.0 0.0

For data sources see[6]

References