X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285073208000

Well Details

Well ID: 0285073208000
Loading map...
Location: 00/08-32-028-07W5/0
Location Alias: 00/08-32-28-07 W5M
Location Alias 2: 00/08-32-028-07 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 07
Section: 32
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 8-32-28-7
Operator Name: Canlin Energy Corporation
License Number: 0269370
License Date: 2002-04-16
License Status: Issued
Spud Date: 2002-05-17
Final Drill Date: 2002-06-29
Well Total Depth: 3802.00 m
Surface Hole Latitude: 51.435296
Surface Hole Longitude: -114.960995

For data sources see[1][2]

Well History

Date Event
2002-04-16 Obtained License
2002-05-19 Surface Casing Operation Performed
2002-05-21 Direction Drilling Operation Performed - Deviate
2002-06-19 Well Log Performed
2002-06-29 Finished Drilling
2002-06-29 Well Log Performed
2002-06-30 Well Log Performed
2002-07-01 Well Log Performed
2002-07-02 Well Log Performed
2002-07-03 Production Casing Operation Performed
2002-07-04 Rig Released
2002-07-04 Well Mode changed to Drilled and Cased
2002-08-05 Well Log Performed
2002-08-08 Perforation Treatment Performed - Chemical Squeeze
2002-08-08 Perforation Treatment Performed - Jet Perforation
2002-08-08 Well Log Performed
2002-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-16 Perforation Treatment Performed - Jet Perforation
2002-08-17 Perforation Treatment Performed - Chemical Squeeze
2002-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-22 Perforation Treatment Performed - Jet Perforation
2002-08-23 Perforation Treatment Performed - Jet Perforation
2002-08-24 Perforation Treatment Performed - Chemical Squeeze
2002-08-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-04 Perforation Treatment Performed - Jet Perforation
2002-09-05 Perforation Treatment Performed - Jet Perforation
2002-09-06 Perforation Treatment Performed - Chemical Squeeze
2002-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-13 Well Began Production
2002-09-13 Well Fluid changed to Gas
2002-09-13 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-05-21 624.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-08-08 Perforation 3735.50 3743.00 13
2002-08-16 Perforation 3464.00 3468.00 13
2002-08-16 Perforation 3471.50 3473.50 13
2002-08-16 Perforation 3448.00 3450.00 13
2002-08-16 Perforation 3458.00 3464.00 13
2002-08-16 Perforation 3436.00 3445.00 13
2002-08-16 Perforation 3428.00 3432.00 13
2002-08-16 Perforation 3458.50 3468.00 19
2002-08-16 Perforation 3436.00 3445.00 19
2002-08-17 Chemical Squeeze 3428.00 3473.50 0
2002-08-20 Acid Treatment 3428.00 3473.50 0
2002-08-08 Perforation 3728.00 3733.00 13
2002-08-22 Perforation 3366.50 3376.00 13
2002-08-22 Perforation 3350.00 3352.00 13
2002-08-22 Perforation 3362.00 3366.50 13
2002-08-22 Perforation 3317.00 3320.00 13
2002-08-22 Perforation 3339.00 3344.00 13
2002-08-22 Perforation 3323.50 3333.00 13
2002-08-22 Perforation 3304.00 3310.00 13
2002-08-22 Perforation 3314.00 3317.00 13
2002-08-22 Perforation 3288.00 3295.00 13
2002-08-23 Perforation 3278.50 3286.00 13
2002-08-08 Perforation 3723.00 3728.00 13
2002-08-23 Perforation 3258.00 3264.00 13
2002-08-23 Perforation 3269.00 3270.00 13
2002-08-23 Perforation 3251.00 3258.00 13
2002-08-23 Perforation 3239.00 3248.00 13
2002-08-24 Chemical Squeeze 3239.00 3376.00 0
2002-08-29 Acid Treatment 3239.00 3376.00 0
2002-09-04 Perforation 3206.50 3216.00 13
2002-09-04 Perforation 3197.00 3206.50 13
2002-09-04 Perforation 3187.50 3197.00 13
2002-09-04 Perforation 3178.00 3187.50 13
2002-08-08 Perforation 3693.00 3699.00 13
2002-09-04 Perforation 3175.50 3178.00 13
2002-09-04 Perforation 3150.00 3159.50 13
2002-09-05 Perforation 3142.00 3150.00 13
2002-09-05 Perforation 3130.00 3133.50 13
2002-09-05 Perforation 3114.50 3115.50 13
2002-09-05 Perforation 3105.00 3114.50 13
2002-09-05 Perforation 3095.50 3105.00 13
2002-09-06 Chemical Squeeze 3095.50 3216.00 0
2002-09-11 Acid Treatment 3095.50 3216.00 0
2002-08-08 Perforation 3687.00 3689.00 13
2002-08-08 Perforation 3691.00 3693.00 13
2002-08-08 Perforation 3681.00 3687.00 13
2002-08-08 Chemical Squeeze 3681.00 3743.00 0
2002-08-14 Acid Treatment 3681.00 3743.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1756 0.0 0.0 0.0
2003 8621 0.0 0.0 0.0
2004 8474 0.0 0.0 0.0
2005 8364 0.0 0.0 0.0
2006 8564 0.0 0.0 0.0
2007 8609 0.0 0.0 0.0
2008 8663 0.0 0.0 0.0
2009 8567 0.0 0.0 0.0
2010 8602 0.0 0.0 0.0
2011 7897 0.0 0.0 0.0
2012 8614 0.0 0.0 0.0
2013 8291 0.0 0.0 0.0
2014 8177 0.0 0.0 0.0
2015 8053 0.0 0.0 0.0
2016 8316 0.0 0.0 0.0
2017 8367 0.0 0.0 0.0
2018 7506 0.0 0.0 0.0
2019 6445 0.0 0.0 0.0
2020 2157 0.0 0.0 0.0

For data sources see[6]

References