If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0285073214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.439183,"lon":-114.962194,"icon":""}]} |
| Location: 00/14-32-028-07W5/0 | |
| Location Alias: 00/14-32-28-07 W5M | |
| Location Alias 2: 00/14-32-028-07 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 5 | |
| Range: 07 | |
| Section: 32 | |
| County/Municipality: Municipal District of Bighorn No. 8 | |
| Well Name: Canlin WCATH 14-32-28-7 | |
| Operator Name: Canlin Energy Corporation | |
| License Number: 0219344 | |
| License Date: 1998-12-04 | |
| License Status: Amended | |
| Spud Date: 1998-12-17 | |
| Final Drill Date: 1999-03-18 | |
| Well Total Depth: 3807.00 m | |
| Surface Hole Latitude: 51.439183 | |
| Surface Hole Longitude: -114.962194 |
| Date | Event |
|---|---|
| 1998-12-04 | Obtained License |
| 1998-12-17 | Well Log Performed |
| 1998-12-19 | Surface Casing Operation Performed |
| 1999-01-08 | Direction Drilling Operation Performed - Deviate |
| 1999-03-18 | Finished Drilling |
| 1999-03-18 | Well Log Performed |
| 1999-03-23 | Well Log Performed |
| 1999-03-25 | Production Casing Operation Performed |
| 1999-03-26 | Rig Released |
| 1999-03-26 | Well Mode changed to Drilled and Cased |
| 1999-05-07 | Well Log Performed |
| 1999-05-08 | Perforation Treatment Performed - Chemical Squeeze |
| 1999-05-08 | Perforation Treatment Performed - Jet Perforation |
| 1999-05-08 | Well Log Performed |
| 1999-05-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-05-19 | Well Log Performed |
| 1999-05-25 | Perforation Treatment Performed - Jet Perforation |
| 1999-05-25 | Well Log Performed |
| 1999-05-26 | Perforation Treatment Performed - Chemical Squeeze |
| 1999-05-26 | Perforation Treatment Performed - Jet Perforation |
| 1999-07-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-07-06 | Perforation Treatment Performed - Jet Perforation |
| 1999-07-06 | Well Log Performed |
| 1999-07-07 | Perforation Treatment Performed - Chemical Squeeze |
| 1999-07-07 | Perforation Treatment Performed - Jet Perforation |
| 1999-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1999-07-17 | Well Began Production |
| 1999-07-17 | Well Fluid changed to Gas |
| 1999-07-17 | Well Mode changed to Flowing |
| 2004-10-19 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 1999-01-08 | 675.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1999-05-08 | Perforation | 3642.00 | 3645.00 | 17 |
| 1999-05-26 | Perforation | 3401.00 | 3404.00 | 7 |
| 1999-05-26 | Chemical Squeeze | 3375.00 | 3465.00 | 0 |
| 1999-07-04 | Acid Treatment | 3375.00 | 3465.00 | 0 |
| 1999-07-06 | Perforation | 3289.00 | 3292.00 | 7 |
| 1999-07-06 | Perforation | 3317.00 | 3334.00 | 7 |
| 1999-07-06 | Perforation | 3337.00 | 3355.00 | 7 |
| 1999-07-07 | Perforation | 3252.00 | 3279.00 | 7 |
| 1999-07-07 | Perforation | 3298.00 | 3306.00 | 7 |
| 1999-07-07 | Perforation | 3334.00 | 3337.00 | 7 |
| 1999-07-07 | Chemical Squeeze | 3252.00 | 3355.00 | 0 |
| 1999-05-08 | Chemical Squeeze | 3642.00 | 3645.00 | 0 |
| 1999-07-09 | Acid Treatment | 3252.00 | 3355.00 | 0 |
| 1999-05-16 | Acid Treatment | 3642.00 | 3645.00 | 0 |
| 1999-05-25 | Perforation | 3408.00 | 3418.00 | 7 |
| 1999-05-25 | Perforation | 3420.00 | 3434.50 | 7 |
| 1999-05-25 | Perforation | 3435.50 | 3454.50 | 7 |
| 1999-05-25 | Perforation | 3456.50 | 3465.00 | 7 |
| 1999-05-26 | Perforation | 3395.00 | 3398.00 | 7 |
| 1999-05-26 | Perforation | 3375.00 | 3391.00 | 7 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1999 | 2351 | 0.0 | 0.0 | 0.0 |
| 2000 | 8148 | 0.0 | 0.0 | 0.0 |
| 2001 | 7431 | 0.0 | 0.0 | 0.0 |
| 2002 | 8364 | 0.0 | 0.0 | 0.0 |
| 2003 | 8155 | 0.0 | 0.0 | 0.0 |
| 2004 | 8026 | 0.0 | 0.0 | 0.0 |
| 2005 | 8222 | 0.0 | 0.0 | 0.0 |
| 2006 | 8618 | 0.0 | 0.0 | 0.0 |
| 2007 | 8646 | 0.0 | 0.0 | 0.0 |
| 2008 | 8663 | 0.0 | 0.0 | 0.0 |
| 2009 | 8374 | 0.0 | 0.0 | 0.0 |
| 2010 | 8503 | 0.0 | 0.0 | 0.0 |
| 2011 | 8287 | 0.0 | 0.0 | 0.0 |
| 2012 | 8521 | 0.0 | 0.0 | 0.0 |
| 2013 | 8097 | 0.0 | 0.0 | 0.0 |
| 2014 | 8150 | 0.0 | 0.0 | 0.0 |
| 2015 | 7426 | 0.0 | 0.0 | 0.0 |
| 2016 | 7449 | 0.0 | 0.0 | 0.0 |
| 2017 | 8368 | 0.0 | 0.0 | 0.0 |
| 2018 | 7332 | 0.0 | 0.0 | 0.0 |
| 2019 | 6410 | 0.0 | 0.0 | 0.0 |
| 2020 | 2154 | 0.0 | 0.0 | 0.0 |
For data sources see[6]