X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0285082816000

Well Details

Well ID: 0285082816000
Loading map...
Location: 00/16-28-028-08W5/0
Location Alias: 00/16-28-28-08 W5M
Location Alias 2: 00/16-28-028-08 W5/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 5
Range: 08
Section: 28
County/Municipality: Municipal District of Bighorn No. 8
Well Name: TIDEWATER WCATH 16-28-28-8
Operator Name: Pieridae Alberta Production Ltd.
License Number: 0148190
License Date: 1991-02-28
License Status: Amended
Spud Date: 1991-03-08
Final Drill Date: 1991-05-07
Well Total Depth: 3492.00 m
Surface Hole Latitude: 51.429763
Surface Hole Longitude: -115.057801

For data sources see[1][2]

Well History

Date Event
1991-02-28 Obtained License
1991-03-09 Lost Circulation Occurred
1991-03-14 Surface Casing Operation Performed
1991-03-20 Direction Drilling Operation Performed - Deviate
1991-04-17 Well Log Performed
1991-04-18 Well Log Performed
1991-04-19 Well Log Performed
1991-04-20 Intermediate Casing Operation Performed
1991-04-20 Liner Casing Operation Performed
1991-05-07 Finished Drilling
1991-05-07 Well Log Performed
1991-05-08 Well Log Performed
1991-05-11 Liner Casing Operation Performed
1991-05-13 Rig Released
1991-10-27 Perforation Treatment Performed - Jet Perforation
1991-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-11-22 Well Mode changed to Drilled and Cased
1992-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-01-20 Perforation Treatment Performed - Jet Perforation
1992-01-20 Plug Back Performed
1992-01-20 Well Log Performed
1992-01-20 Well Mode changed to Abandoned Zone
1992-01-21 Perforation Treatment Performed - Jet Perforation
1992-01-22 Perforation Treatment Performed - Jet Perforation
1992-01-22 Well Log Performed
1992-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-29 Well Log Performed
1992-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-02-02 Well Log Performed
1992-02-11 Well Log Performed
1994-10-26 Well Log Performed
1996-11-28 Perforation Treatment Performed - Chemical Squeeze
1997-05-13 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-03-20 1796.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-10-27 Perforation 2917.00 2923.00 13
1992-01-20 Perforation 2390.30 2391.30 13
1992-01-20 Perforation 2430.30 2431.30 13
1992-01-20 Perforation 2480.80 2481.80 13
1992-01-21 Perforation 2319.30 2320.30 13
1992-01-22 Perforation 2286.30 2295.30 13
1992-01-22 Perforation 2309.80 2314.80 13
1992-01-22 Perforation 2316.30 2320.30 13
1992-01-22 Perforation 2360.30 2368.30 13
1992-01-22 Perforation 2390.30 2400.80 13
1992-01-22 Perforation 2406.80 2416.80 13
1991-10-27 Perforation 2935.00 2944.00 13
1992-01-22 Perforation 2426.30 2431.30 13
1992-01-22 Perforation 2480.80 2491.30 13
1992-01-23 Acid Treatment 2286.30 2491.30 0
1992-01-24 Acid Treatment 2390.30 2491.30 0
1992-01-26 Acid Treatment 2360.30 2368.30 0
1992-01-27 Acid Treatment 2286.30 2320.30 0
1992-01-28 Acid Treatment 2360.30 2368.30 0
1992-01-30 Acid Treatment 2390.80 2416.80 0
1996-11-28 Chemical Squeeze 2286.30 2491.30 0
1997-05-13 Chemical Squeeze 2286.30 2491.30 0
1991-10-27 Perforation 2946.00 2952.00 13
1991-10-27 Perforation 3086.00 3105.00 13
1991-10-27 Perforation 3112.00 3144.00 13
1991-10-29 Acid Treatment 2917.00 3144.00 0
1991-11-02 Acid Treatment 2917.00 3144.00 0
1992-01-20 Packing Device Capped w/Cement 2677.00 2685.00 0
1992-01-20 Perforation 2367.30 2368.30 13

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1991-03-09 Lost Circulation 77.60 111.00

For data sources see[6]

References