X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294102014000

Well Details

Well ID: 0294102014000
Loading map...
Location: 00/14-20-029-10W4/0
Location Alias: 00/14-20-29-10 W4M
Location Alias 2: 00/14-20-029-10 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 10
Section: 20
County/Municipality: Special Areas No. 2
Well Name: POC STANMORE 14-20-29-10
Operator Name: Perpetual Operating Corp.
License Number: 0055390
License Date: 1975-10-16
License Status: RecCertified
Spud Date: 1975-10-17
Final Drill Date: 1975-10-20
Well Total Depth: 1048.50 m
Surface Hole Latitude: 51.502274
Surface Hole Longitude: -111.380146

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-16 Obtained License
1975-10-20 Finished Drilling
1975-10-20 Well Mode changed to Drilled and Cased
1975-10-21 Drill Stem Test Performed
1975-10-22 Drill Stem Test Performed
1975-10-23 Production Casing Operation Performed
1975-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-27 Perforation Treatment Performed - Jet Perforation
1975-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-11-29 Perforation Treatment Performed - Jet Perforation
1976-03-01 Well Began Production
1976-03-01 Well Fluid changed to Gas
1976-03-01 Well Mode changed to Flowing
1979-12-31 Well Fluid changed to Gas
1979-12-31 Well Mode changed to Suspended
1996-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-13 Plug Back Performed
1996-06-13 Well Fluid changed to Gas
1996-06-13 Well Mode changed to Abandoned Zone
1996-09-04 Well Abandoned
1996-09-04 Well Fluid changed to Gas
1996-09-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-11-27 Perforation 472.40 474.30 7
1975-11-27 Perforation 474.90 477.90 7
1975-11-27 Acid Treatment 472.40 477.90 0
1975-11-28 Acid Treatment 472.40 477.90 0
1975-11-29 Packing Device Capped w/Cement 399.30 406.90 0
1975-11-29 Perforation 334.10 336.20 7
1996-06-13 Packing Device Capped w/Cement 318.50 326.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 6519 0.0 0.0 0.0
1977 8052 0.0 0.0 0.0
1978 3695 0.0 0.0 0.0
1979 5902 0.0 0.0 0.0

For data sources see[5]

References