X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294113415022

Well Details

Well ID: 0294113415022
Loading map...
Location: 02/15-34-029-11W4/2
Location Alias: 02/15-34-29-11 W4M
Location Alias 2: 02/15-34-029-11 W4/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 11
Section: 34
County/Municipality: Special Areas No. 2
Well Name: SOC STANMORE 15-34-29-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0327949
License Date: 2005-03-11
License Status: Amended
Spud Date: 2005-03-16
Final Drill Date: 2005-03-20
Well Total Depth: 1066.00 m
Surface Hole Latitude: 51.530232
Surface Hole Longitude: -111.464672

For data sources see[1][2]

Well History

Date Event
2005-03-11 Obtained License
2005-03-17 Surface Casing Operation Performed
2005-03-20 Finished Drilling
2005-03-20 Well Log Performed
2005-03-20 Well Mode changed to Drilled and Cased
2005-03-21 Production Casing Operation Performed
2005-03-21 Rig Released
2005-04-27 Perforation Treatment Performed - Jet Perforation
2005-04-27 Well Log Performed
2005-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-05-03 Perforation Treatment Performed - Jet Perforation
2005-05-03 Plug Back Performed
2005-05-03 Well Log Performed
2005-05-06 Perforation Treatment Performed - Jet Perforation
2005-05-06 Well Log Performed
2005-05-19 Well Began Production
2005-05-19 Well Fluid changed to Crude Oil
2005-05-19 Well Mode changed to Pumping
2005-09-16 Perforation Treatment Performed - Jet Perforation
2005-09-16 Well Log Performed
2005-09-17 Well Log Performed
2005-10-01 Well Fluid changed to Crude Oil
2005-10-01 Well Mode changed to Suspended
2005-12-01 Well Began Injection
2005-12-01 Well Fluid changed to Water
2005-12-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-04-27 Perforation 1044.00 1047.00 17
2005-05-03 Packing Device Capped w/Cement 1034.00 1042.00 0
2005-05-03 Perforation 1024.00 1026.00 17
2005-05-06 Perforation 1024.00 1027.00 17
2005-09-16 Perforation 1029.50 1033.50 17
2005-09-16 Perforation 1026.50 1029.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 2828 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References