If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0294190406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.449778,"lon":-112.622821,"icon":""}]} |
| Location: 00/06-04-029-19W4/0 | |
| Location Alias: 00/06-04-29-19 W4M | |
| Location Alias 2: 00/06-04-029-19 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 4 | |
| Range: 19 | |
| Section: 04 | |
| County/Municipality: Starland County | |
| Well Name: MARQUEE DRUM 6-4-29-19 | |
| Operator Name: Prairie Provident Resources Canada Ltd. | |
| License Number: 0045713 | |
| License Date: 1973-05-10 | |
| License Status: RecCertified | |
| Spud Date: 1973-05-31 | |
| Final Drill Date: 1973-06-05 | |
| Well Total Depth: 1347.20 m | |
| Surface Hole Latitude: 51.449778 | |
| Surface Hole Longitude: -112.622821 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1973-05-10 | Obtained License |
| 1973-06-05 | Finished Drilling |
| 1973-06-06 | Drill Stem Test Performed |
| 1973-06-07 | Drill Stem Test Performed |
| 1973-06-08 | Production Casing Operation Performed |
| 1973-06-12 | Perforation Treatment Performed - Jet Perforation |
| 1973-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1973-06-14 | Perforation Treatment Performed - Fractured |
| 1973-06-21 | Perforation Treatment Performed - Jet Perforation |
| 1973-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1973-06-23 | Perforation Treatment Performed - Cement Squeeze |
| 1973-06-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1973-06-25 | Perforation Treatment Performed - Selective Jet Perforations |
| 1973-06-26 | Perforation Treatment Performed - Cement Squeeze |
| 1973-06-27 | Perforation Treatment Performed - Selective Jet Perforations |
| 1973-06-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1973-06-29 | Perforation Treatment Performed - Cement Squeeze |
| 1973-07-04 | Perforation Treatment Performed - Cement Squeeze |
| 1973-07-06 | Perforation Treatment Performed - Cement Squeeze |
| 1973-07-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1973-07-14 | Perforation Treatment Performed - Jet Perforation |
| 1973-07-15 | Perforation Treatment Performed - Fractured |
| 1973-08-24 | Well Mode changed to Drilled and Cased |
| 1999-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1999-10-06 | Plug Back Performed |
| 1999-10-14 | Well Abandoned |
| 1999-10-14 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1973-06-12 | Perforation | 1304.20 | 1305.80 | 3 |
| 1973-06-25 | Selective Jet Perforations | 1011.00 | 1011.30 | 0 |
| 1973-06-25 | Selective Jet Perforations | 1012.20 | 1012.50 | 0 |
| 1973-06-25 | Selective Jet Perforations | 1012.50 | 1012.90 | 0 |
| 1973-06-25 | Selective Jet Perforations | 1012.90 | 1013.20 | 0 |
| 1973-06-25 | Selective Jet Perforations | 1013.20 | 1013.50 | 0 |
| 1973-06-25 | Selective Jet Perforations | 1013.50 | 1013.50 | 0 |
| 1973-06-25 | Acid Treatment | 1009.50 | 1013.50 | 0 |
| 1973-06-26 | Cement Squeeze | 1009.50 | 1013.50 | 0 |
| 1973-06-27 | Selective Jet Perforations | 584.60 | 584.90 | 0 |
| 1973-06-27 | Selective Jet Perforations | 586.70 | 587.00 | 0 |
| 1973-06-13 | Acid Treatment | 1304.20 | 1305.80 | 0 |
| 1973-06-27 | Selective Jet Perforations | 590.10 | 590.40 | 0 |
| 1973-06-27 | Selective Jet Perforations | 591.90 | 592.20 | 0 |
| 1973-06-28 | Acid Treatment | 584.60 | 592.20 | 0 |
| 1973-06-29 | Cement Squeeze | 1009.50 | 1013.50 | 0 |
| 1973-06-29 | Cement Squeeze | 584.60 | 592.20 | 0 |
| 1973-07-04 | Cement Squeeze | 584.60 | 592.20 | 0 |
| 1973-07-04 | Cement Squeeze | 584.60 | 592.20 | 0 |
| 1973-07-06 | Cement Squeeze | 584.60 | 592.20 | 0 |
| 1973-07-14 | Perforation | 1115.00 | 1116.80 | 3 |
| 1973-07-14 | Perforation | 1118.30 | 1119.20 | 3 |
| 1973-06-14 | Fracture | 1304.20 | 1305.80 | 0 |
| 1973-07-14 | Acid Treatment | 1115.00 | 1119.20 | 0 |
| 1973-07-15 | Fracture | 1115.00 | 1119.20 | 0 |
| 1999-10-06 | Packing Device Capped w/Cement | 1100.00 | 1108.00 | 0 |
| 1973-06-21 | Perforation | 1115.00 | 1115.90 | 3 |
| 1973-06-21 | Perforation | 1117.70 | 1118.60 | 3 |
| 1973-06-22 | Acid Treatment | 1115.00 | 1118.60 | 0 |
| 1973-06-23 | Cement Squeeze | 1115.00 | 1118.60 | 0 |
| 1973-06-23 | Cement Squeeze | 1115.00 | 1118.60 | 0 |
| 1973-06-25 | Selective Jet Perforations | 1009.50 | 1010.70 | 0 |
For data sources see[4]