X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294201308000

Well Details

Well ID: 0294201308000
Loading map...
Location: 00/08-13-029-20W4/0
Location Alias: 00/08-13-29-20 W4M
Location Alias 2: 00/08-13-029-20 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 20
Section: 13
County/Municipality: Drumheller
Well Name: BEARSPAW ET AL DRUM 8-13-29-20
Operator Name: Bearspaw Petroleum Ltd.
License Number: 0024030
License Date: 1963-04-01
License Status: Abandoned
Spud Date: 1963-04-05
Final Drill Date: 1963-04-23
Well Total Depth: 1600.20 m
Surface Hole Latitude: 51.479626
Surface Hole Longitude: -112.680132

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-04-01 Obtained License
1963-04-13 Drill Stem Test Performed
1963-04-23 Finished Drilling
1963-04-23 Well Mode changed to Drilled and Cased
1963-04-24 Drill Stem Test Performed
1963-04-25 Drill Stem Test Performed
1963-04-26 Production Casing Operation Performed
1963-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-04-28 Perforation Treatment Performed - Jet Perforation
1963-05-14 Perforation Treatment Performed - Cement Squeeze
1963-05-17 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-05-19 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-05-19 Perforation Treatment Performed - Acid Wash - No Pressure
1963-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-24 Perforation Treatment Performed - Selective Bullet Perforations
1963-06-13 Well Began Production
1963-06-13 Well Fluid changed to Crude Oil
1963-06-13 Well Mode changed to Flowing
1963-07-16 Perforation Treatment Performed - Selective Bullet Perforations
1963-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-07-18 Perforation Treatment Performed - Cement Squeeze
1963-07-20 Perforation Treatment Performed - Bullet Perforation
1963-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-10 Perforation Treatment Performed - Cement Squeeze
1963-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-18 Perforation Treatment Performed - Selective Jet Perforations
1963-10-08 Well Fluid changed to Crude Oil
1963-10-08 Well Mode changed to Pumping
1973-01-26 Perforation Treatment Performed - Cement Squeeze
1973-01-28 Perforation Treatment Performed - Jet Perforation
1973-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-29 Well Began Injection
1973-01-29 Well Fluid changed to Water
1973-01-29 Well Type changed to Disposal
2019-01-10 Perforation Treatment Performed - Cement Squeeze
2019-01-10 Plug Back Performed
2019-01-10 Well Fluid changed to Water
2019-01-10 Well Mode changed to Abandoned Zone
2019-01-10 Well Type changed to Disposal
2019-01-11 Perforation Treatment Performed - Cement Plug
2019-01-11 Plug Back Performed
2019-01-15 Perforation Treatment Performed - Jet Perforation
2019-01-16 Perforation Treatment Performed - Cement Plug
2019-01-16 Plug Back Performed
2019-01-22 Perforation Treatment Performed - Cement Plug
2019-01-22 Plug Back Performed
2019-02-14 Well Abandoned
2019-02-14 Well Fluid changed to Water
2019-02-14 Well Mode changed to Abandoned
2019-02-14 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-04-28 Perforation 1542.30 1545.30 13
1963-07-17 Acid Treatment 1542.30 1546.60 0
1963-07-18 Cement Squeeze 1541.40 1546.60 0
1963-07-20 Bullet Perforation 1541.10 1541.40 13
1963-07-22 Acid Treatment 1541.10 1541.40 0
1963-08-10 Cement Squeeze 1541.10 1541.40 0
1963-08-18 Selective Jet Perforations 1542.00 1542.30 10
1963-08-18 Acid Treatment 1542.00 1542.30 0
1973-01-26 Cement Squeeze 1542.00 1542.30 0
1973-01-28 Perforation 1547.20 1551.70 3
1973-01-29 Acid Treatment 1547.20 1551.70 0
1963-04-28 Acid Treatment 1542.30 1545.30 0
2019-01-10 Cement Squeeze 1547.20 1551.80 0
2019-01-11 Cement Plug 1515.30 1551.80 0
2019-01-15 Perforation 986.00 987.00 13
2019-01-15 Perforation 496.00 497.00 13
2019-01-15 Perforation 216.00 217.00 13
2019-01-15 Perforation 193.00 194.00 13
2019-01-16 Cement Plug 952.00 1010.00 0
2019-01-22 Cement Plug 195.00 530.00 0
2019-01-22 Cement Plug 51.40 195.00 0
1963-05-14 Cement Squeeze 1542.30 1545.30 0
1963-05-17 Hydra Jet Perforation 1542.30 1542.30 0
1963-05-19 Acid Wash 1542.30 1542.30 0
1963-05-19 Hydra Jet Perforation 1541.40 1541.40 0
1963-05-24 Selective Bullet Perforations 1542.30 1542.30 0
1963-05-24 Acid Treatment 1542.30 1545.30 0
1963-07-16 Selective Bullet Perforations 1546.60 1546.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1973-01-29 No Incident Encountered 0.00 0.00
2018-12-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References