If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0294213511003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.526769,"lon":-112.85532,"icon":""}]} |
Location: 00/11-35-029-21W4/3 | |
Location Alias: 00/11-35-29-21 W4M | |
Location Alias 2: 00/11-35-029-21 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 029 | |
Meridian: 4 | |
Range: 21 | |
Section: 35 | |
County/Municipality: Starland County | |
Well Name: BEARSPAW ET AL DRUMW 11-35-29-21 | |
Operator Name: Bearspaw Petroleum Ltd. | |
License Number: 0007344 | |
License Date: 1953-11-18 | |
License Status: Issued | |
Spud Date: 1953-12-20 | |
Final Drill Date: 1954-01-15 | |
Well Total Depth: 1699.30 m | |
Surface Hole Latitude: 51.526769 | |
Surface Hole Longitude: -112.855320 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-11-18 | Obtained License |
1954-01-15 | Finished Drilling |
1954-01-15 | Production Casing Operation Performed |
1954-01-15 | Well Mode changed to Drilled and Cased |
1954-01-19 | Perforation Treatment Performed - Jet Perforation |
1954-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1954-02-06 | Perforation Treatment Performed - Jet Perforation |
1954-02-09 | Perforation Treatment Performed - Jet Perforation |
1954-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-08-16 | Perforation Treatment Performed - Cement Squeeze |
1976-08-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-10-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-10-30 | Plug Back Performed |
2002-10-30 | Well Log Performed |
2002-10-31 | Perforation Treatment Performed - Jet Perforation |
2002-10-31 | Well Log Performed |
2002-12-03 | Perforation Treatment Performed - Fractured |
2009-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-03-18 | Plug Back Performed |
2009-03-19 | Perforation Treatment Performed - Jet Perforation |
2009-03-19 | Well Fluid changed to Gas |
2009-03-19 | Well Mode changed to Testing |
2010-07-08 | Perforation Treatment Performed - Fractured |
2010-08-11 | Well Began Production |
2010-08-11 | Well Fluid changed to Gas |
2010-08-11 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1954-01-19 | Perforation | 1675.80 | 1677.30 | 13 |
2002-10-31 | Perforation | 1330.70 | 1336.70 | 14 |
2002-12-03 | Fracture | 1330.70 | 1336.70 | 0 |
2009-03-18 | Packing Device Capped w/Cement | 1320.00 | 1328.00 | 0 |
2009-03-19 | Perforation | 1149.00 | 1152.00 | 20 |
2009-03-19 | Perforation | 1144.50 | 1148.50 | 20 |
2010-07-08 | Fracture | 1144.50 | 1152.00 | 0 |
1954-01-20 | Acid Treatment | 1675.80 | 1677.30 | 0 |
1954-02-06 | Perforation | 1668.20 | 1670.60 | 13 |
1954-02-09 | Perforation | 1662.40 | 1664.80 | 13 |
1954-02-10 | Acid Treatment | 1662.40 | 1664.80 | 0 |
1974-02-19 | Acid Treatment | 1662.40 | 1670.60 | 0 |
1976-08-16 | Cement Squeeze | 1668.20 | 1677.30 | 0 |
1976-08-17 | Acid Treatment | 1662.40 | 1664.80 | 0 |
2002-10-30 | Packing Device Capped w/Cement | 1651.50 | 1659.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 8 | 0.0 | 0.0 | 0.0 |
2010 | 2117 | 0.0 | 0.0 | 0.0 |
2011 | 4754 | 0.0 | 0.0 | 0.0 |
2012 | 7789 | 0.0 | 0.0 | 0.0 |
2013 | 8735 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8687 | 0.0 | 0.0 | 0.0 |
2016 | 7113 | 0.0 | 0.0 | 0.0 |
2017 | 6295 | 0.0 | 0.0 | 0.0 |
2018 | 4199 | 0.0 | 0.0 | 0.0 |
2019 | 5075 | 0.0 | 0.0 | 0.0 |
2020 | 2112 | 0.0 | 0.0 | 0.0 |
For data sources see[5]