If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0294220906002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.463452,"lon":-113.046028,"icon":""}]} |
| Location: 00/06-09-029-22W4/2 | |
| Location Alias: 00/06-09-29-22 W4M | |
| Location Alias 2: 00/06-09-029-22 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 4 | |
| Range: 22 | |
| Section: 09 | |
| County/Municipality: Kneehill County | |
| Well Name: CWNG CARBON 6-9-29-22 | |
| Operator Name: ATCO Energy Solutions Ltd. | |
| License Number: 0071155 | |
| License Date: 1978-08-04 | |
| License Status: Suspension | |
| Spud Date: 1978-08-07 | |
| Final Drill Date: 1978-08-21 | |
| Well Total Depth: 1542.00 m | |
| Surface Hole Latitude: 51.463452 | |
| Surface Hole Longitude: -113.046028 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1978-08-04 | Obtained License |
| 1978-08-07 | Lost Circulation Occurred |
| 1978-08-13 | Drill Stem Test Performed |
| 1978-08-15 | Drill Stem Test Performed |
| 1978-08-21 | Drill Stem Test Performed |
| 1978-08-21 | Finished Drilling |
| 1978-08-21 | Well Mode changed to Drilled and Cased |
| 1978-08-22 | Drill Stem Test Performed |
| 1978-08-23 | Drill Stem Test Performed |
| 1978-08-24 | Drill Stem Test Performed |
| 1978-08-27 | Production Casing Operation Performed |
| 1978-09-05 | Perforation Treatment Performed - Jet Perforation |
| 1978-09-05 | Well Log Performed |
| 1978-09-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1979-08-11 | Perforation Treatment Performed - Jet Perforation |
| 1979-08-11 | Well Log Performed |
| 1979-08-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-09-02 | Perforation Treatment Performed - Fractured |
| 1980-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1980-03-19 | Perforation Treatment Performed - Jet Perforation |
| 1980-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1980-03-21 | Perforation Treatment Performed - Fractured |
| 1981-03-13 | Well Began Production |
| 1981-03-13 | Well Fluid changed to Gas |
| 1981-03-13 | Well Mode changed to Flowing |
| 2016-12-01 | Well Fluid changed to Gas |
| 2016-12-01 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1978-09-05 | Perforation | 1527.00 | 1529.00 | 7 |
| 1980-03-19 | Perforation | 1253.50 | 1254.50 | 3 |
| 1980-03-19 | Perforation | 1261.80 | 1262.80 | 3 |
| 1980-03-19 | Perforation | 1272.00 | 1273.00 | 3 |
| 1980-03-19 | Perforation | 1270.00 | 1271.50 | 3 |
| 1980-03-20 | Acid Treatment | 1253.50 | 1271.50 | 0 |
| 1980-03-21 | Fracture | 1253.50 | 1271.50 | 0 |
| 1978-09-06 | Acid Treatment | 1527.00 | 1529.00 | 0 |
| 1979-08-10 | Packing Device Capped w/Cement | 1515.00 | 1515.00 | 0 |
| 1979-08-11 | Perforation | 1473.50 | 1474.00 | 8 |
| 1979-08-11 | Perforation | 1474.50 | 1475.00 | 8 |
| 1979-08-11 | Perforation | 1480.50 | 1482.60 | 6 |
| 1979-08-31 | Acid Treatment | 1473.50 | 1482.60 | 0 |
| 1979-09-02 | Fracture | 1473.50 | 1482.60 | 0 |
| 1980-03-14 | Packing Device Capped w/Cement | 1465.00 | 1465.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1981 | 6364 | 0.0 | 0.0 | 0.0 |
| 1982 | 6804 | 0.0 | 0.0 | 0.0 |
| 1983 | 7351 | 0.0 | 0.0 | 0.0 |
| 1984 | 8159 | 0.0 | 0.0 | 0.0 |
| 1985 | 4293 | 0.0 | 0.0 | 0.0 |
| 1986 | 4037 | 0.0 | 0.0 | 0.0 |
| 1987 | 3998 | 0.0 | 0.0 | 0.0 |
| 1988 | 3899 | 0.0 | 0.0 | 0.0 |
| 1989 | 6786 | 0.0 | 0.0 | 0.0 |
| 1990 | 3194 | 0.0 | 0.0 | 0.0 |
| 1991 | 3503 | 0.0 | 0.0 | 0.0 |
| 1992 | 3534 | 0.0 | 0.0 | 0.0 |
| 1993 | 3339 | 0.0 | 0.0 | 0.0 |
| 1994 | 5357 | 0.0 | 0.0 | 0.0 |
| 1995 | 2998 | 0.0 | 0.0 | 0.0 |
| 1996 | 3869 | 0.0 | 0.0 | 0.0 |
| 1997 | 6128 | 0.0 | 0.0 | 0.0 |
| 1998 | 5678 | 0.0 | 0.0 | 0.0 |
| 1999 | 6512 | 0.0 | 0.0 | 0.0 |
| 2000 | 6579 | 0.0 | 0.0 | 0.0 |
| 2001 | 5847 | 0.0 | 0.0 | 0.0 |
| 2002 | 6888 | 0.0 | 0.0 | 0.0 |
| 2003 | 6309 | 0.0 | 0.0 | 0.0 |
| 2004 | 6136 | 0.0 | 0.0 | 0.0 |
| 2005 | 6091 | 0.0 | 0.0 | 0.0 |
| 2006 | 5926 | 0.0 | 0.0 | 0.0 |
| 2007 | 5051 | 0.0 | 0.0 | 0.0 |
| 2008 | 4719 | 0.0 | 0.0 | 0.0 |
| 2009 | 4069 | 0.0 | 0.0 | 0.0 |
| 2010 | 3381 | 0.0 | 0.0 | 0.0 |
| 2011 | 3898 | 0.0 | 0.0 | 0.0 |
| 2012 | 4997 | 0.0 | 0.0 | 0.0 |
| 2013 | 8753 | 0.0 | 0.0 | 0.0 |
| 2014 | 5879 | 0.0 | 0.0 | 0.0 |
| 2015 | 6549 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1978-08-07 | Lost Circulation | 117.00 | 117.00 |
For data sources see[6]