X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294240214000

Well Details

Well ID: 0294240214000
Loading map...
Location: 00/14-02-029-24W4/0
Location Alias: 00/14-02-29-24 W4M
Location Alias 2: 00/14-02-029-24 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 24
Section: 02
County/Municipality: Kneehill County
Well Name: BUMPER ET AL SWALWELL 14-2-29-24
Operator Name: Marathon Canada Limited
License Number: 0087045
License Date: 1980-11-14
License Status: RecCertified
Spud Date: 1980-11-17
Final Drill Date: 1980-11-30
Well Total Depth: 1706.00 m
Surface Hole Latitude: 51.456664
Surface Hole Longitude: -113.280562

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-14 Obtained License
1980-11-30 Finished Drilling
1980-11-30 Well Log Performed
1980-11-30 Well Mode changed to Drilled and Cased
1980-12-02 Drill Stem Test Performed
1980-12-04 Drill Stem Test Performed
1980-12-06 Drill Stem Test Performed
1980-12-07 Production Casing Operation Performed
1980-12-17 Perforation Treatment Performed - Jet Perforation
1980-12-20 Perforation Treatment Performed - Fractured
1981-02-25 Well Began Production
1981-02-25 Well Fluid changed to Crude Oil
1981-02-25 Well Mode changed to Flowing
1981-03-31 Well Fluid changed to Crude Oil
1981-03-31 Well Mode changed to Suspended
1984-09-18 Well Log Performed
1984-09-19 Perforation Treatment Performed - Jet Perforation
1984-09-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-02 Well Fluid changed to Crude Oil
1984-10-02 Well Mode changed to Flowing
1985-04-30 Well Fluid changed to Crude Oil
1985-04-30 Well Mode changed to Pumping
1985-05-01 Perforation Treatment Performed - Jet Perforation
1985-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-01 Well Fluid changed to Crude Oil
1985-08-01 Well Mode changed to Suspended
1986-11-12 Well Fluid changed to Crude Oil
1986-11-12 Well Mode changed to Pumping
1989-10-12 Well Fluid changed to Crude Oil
1989-10-12 Well Mode changed to Suspended
1990-03-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-22 Plug Back Performed
1990-03-22 Well Fluid changed to Crude Oil
1990-03-22 Well Mode changed to Abandoned Zone
1990-03-28 Perforation Treatment Performed - Jet Perforation
1990-03-28 Well Log Performed
1990-03-31 Perforation Treatment Performed - Fractured
1994-05-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-02 Plug Back Performed
1994-05-03 Perforation Treatment Performed - Jet Perforation
1994-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-09 Plug Back Performed
1994-05-10 Perforation Treatment Performed - Jet Perforation
1994-05-10 Well Log Performed
1994-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-24 Perforation Treatment Performed - Jet Perforation
1994-09-24 Perforation Treatment Performed - Remedial Casing
1994-09-24 Plug Back Performed
1994-09-24 Well Log Performed
1994-09-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-12-17 Perforation 1618.00 1620.00 7
1990-03-28 Perforation 1383.00 1390.00 13
1990-03-31 Fracture 1383.00 1390.00 0
1994-05-02 Packing Device Capped w/Cement 1362.00 1370.00 0
1994-05-03 Perforation 778.00 781.00 13
1994-05-09 Packing Device Capped w/Cement 758.80 766.80 0
1994-05-10 Perforation 672.00 677.50 13
1994-09-24 Perforation 300.00 301.00 10
1994-09-24 Packing Device Capped w/Cement 270.00 666.00 0
1994-09-24 Remedial Casing Cementing 300.00 301.00 0
1980-12-20 Fracture 1618.00 1620.00 0
1984-09-19 Perforation 1641.00 1644.00 13
1984-09-20 Acid Treatment 1641.00 1644.00 0
1985-05-01 Perforation 1625.50 1627.00 13
1985-05-01 Perforation 1628.50 1630.50 13
1985-05-01 Perforation 1631.00 1632.50 13
1985-05-02 Acid Treatment 1625.50 1632.50 0
1990-03-22 Packing Device Capped w/Cement 1604.20 1612.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 723 0.0 0.0 0.0
1984 171 0.0 0.0 0.0
1985 1699 0.0 0.0 0.0
1986 359 0.0 0.0 0.0
1987 6287 0.0 0.0 0.0
1988 8588 0.0 0.0 0.0
1989 6719 0.0 0.0 0.0

For data sources see[5]

References