X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294270112000

Well Details

Well ID: 0294270112000
Loading map...
Location: 00/12-01-029-27W4/0
Location Alias: 00/12-01-29-27 W4M
Location Alias 2: 00/12-01-029-27 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 27
Section: 01
County/Municipality: Mountain View County
Well Name: EMBER ET AL IRCANA 12-1-29-27
Operator Name: Ember Resources Inc.
License Number: 0413969
License Date: 2009-11-13
License Status: Issued
Spud Date: 2009-12-17
Final Drill Date: 2009-12-19
Well Total Depth: 1091.00 m
Surface Hole Latitude: 51.455087
Surface Hole Longitude: -113.680562

For data sources see[1][2]

Well History

Date Event
2009-11-13 Obtained License
2009-12-17 Surface Casing Operation Performed
2009-12-19 Finished Drilling
2009-12-19 Production Casing Operation Performed
2009-12-19 Rig Released
2009-12-19 Well Mode changed to Drilled and Cased
2009-12-21 Well Log Performed
2010-01-10 Perforation Treatment Performed - Jet Perforation
2010-01-10 Well Log Performed
2010-01-22 Perforation Treatment Performed - Fractured
2010-02-04 Well Began Production
2010-02-04 Well Fluid changed to Coalbed Methane-Coals Only
2010-02-04 Well Mode changed to Flowing
2010-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-01-10 Perforation 747.00 747.50 13
2010-01-10 Perforation 676.90 677.40 13
2010-01-10 Perforation 666.60 668.60 13
2010-01-10 Perforation 652.10 652.60 13
2010-01-10 Perforation 639.50 640.00 13
2010-01-10 Perforation 621.00 621.50 13
2010-01-10 Perforation 601.20 601.70 13
2010-01-10 Perforation 581.30 581.80 13
2010-01-10 Perforation 577.90 578.90 13
2010-01-10 Perforation 576.70 577.20 13
2010-01-10 Perforation 573.90 574.40 13
2010-01-10 Perforation 731.30 731.80 13
2010-01-10 Perforation 571.30 571.80 13
2010-01-10 Perforation 504.40 504.90 13
2010-01-10 Perforation 490.30 490.80 13
2010-01-10 Perforation 464.00 464.50 13
2010-01-10 Perforation 444.00 444.50 13
2010-01-10 Perforation 408.70 409.20 13
2010-01-10 Perforation 359.00 360.00 13
2010-01-10 Perforation 348.50 350.00 13
2010-01-10 Perforation 343.90 344.40 13
2010-01-10 Perforation 337.00 338.00 13
2010-01-10 Perforation 722.60 724.10 13
2010-01-10 Perforation 328.60 329.10 13
2010-01-10 Perforation 321.60 322.10 13
2010-01-10 Perforation 312.70 313.70 13
2010-01-10 Perforation 1042.90 1043.90 17
2010-01-10 Perforation 888.60 889.60 17
2010-01-10 Perforation 826.40 827.40 17
2010-01-10 Perforation 799.50 801.00 17
2010-01-10 Perforation 787.20 787.70 17
2010-01-22 Fracture 888.60 889.60 0
2010-01-22 Fracture 826.40 827.40 0
2010-01-10 Perforation 718.60 719.10 13
2010-01-22 Fracture 799.50 801.00 0
2010-01-22 Fracture 787.20 787.70 0
2010-01-22 Fracture 747.00 747.50 0
2010-01-22 Fracture 731.30 731.80 0
2010-01-22 Fracture 722.60 724.10 0
2010-01-22 Fracture 718.60 719.10 0
2010-01-22 Fracture 710.70 711.20 0
2010-01-22 Fracture 707.00 708.00 0
2010-01-22 Fracture 698.50 699.00 0
2010-01-22 Fracture 694.10 695.10 0
2010-01-10 Perforation 710.70 711.20 13
2010-01-22 Fracture 682.90 683.40 0
2010-01-22 Fracture 676.90 677.40 0
2010-01-22 Fracture 666.60 668.60 0
2010-01-22 Fracture 652.10 652.60 0
2010-01-22 Fracture 639.50 640.00 0
2010-01-22 Fracture 621.00 621.50 0
2010-01-22 Fracture 601.20 601.70 0
2010-01-22 Fracture 581.30 581.80 0
2010-01-22 Fracture 577.90 578.90 0
2010-01-22 Fracture 576.70 577.20 0
2010-01-10 Perforation 707.00 708.00 13
2010-01-22 Fracture 573.90 574.40 0
2010-01-22 Fracture 571.30 571.80 0
2010-01-22 Fracture 504.40 504.90 0
2010-01-22 Fracture 490.30 490.80 0
2010-01-22 Fracture 464.00 464.50 0
2010-01-22 Fracture 444.00 444.50 0
2010-01-22 Fracture 408.70 409.20 0
2010-01-22 Fracture 359.00 360.00 0
2010-01-22 Fracture 348.50 350.00 0
2010-01-22 Fracture 343.90 344.40 0
2010-01-10 Perforation 698.50 699.00 13
2010-01-22 Fracture 337.00 338.00 0
2010-01-22 Fracture 328.60 329.10 0
2010-01-22 Fracture 321.60 322.10 0
2010-01-22 Fracture 312.70 313.70 0
2010-07-10 Packing Device Capped w/Cement 777.00 785.00 0
2010-01-10 Perforation 694.10 695.10 13
2010-01-10 Perforation 682.90 683.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7623 0.0 0.0 0.0
2011 8428 0.0 0.0 0.0
2012 8704 0.0 0.0 0.0
2013 8708 0.0 0.0 0.0
2014 4702 0.0 0.0 0.0
2015 4859 0.0 0.0 0.0
2016 8706 0.0 0.0 0.0
2017 8675 0.0 0.0 0.0
2018 8590 0.0 0.0 0.0
2019 8613 0.0 0.0 0.0
2020 2180 0.0 0.0 0.0

For data sources see[5]

References