If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0294271204000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.462609,"lon":-113.680394,"icon":""}]} |
| Location: 00/04-12-029-27W4/0 | |
| Location Alias: 00/04-12-29-27 W4M | |
| Location Alias 2: 00/04-12-029-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 12 | |
| County/Municipality: Mountain View County | |
| Well Name: EMBER ET AL IRCANA 4-12-29-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0395975 | |
| License Date: 2008-04-17 | |
| License Status: Issued | |
| Spud Date: 2008-09-12 | |
| Final Drill Date: 2008-09-14 | |
| Well Total Depth: 1076.00 m | |
| Surface Hole Latitude: 51.462609 | |
| Surface Hole Longitude: -113.680394 |
| Date | Event |
|---|---|
| 2008-04-17 | Obtained License |
| 2008-09-12 | Surface Casing Operation Performed |
| 2008-09-14 | Finished Drilling |
| 2008-09-14 | Production Casing Operation Performed |
| 2008-09-14 | Rig Released |
| 2008-09-14 | Well Mode changed to Drilled and Cased |
| 2008-09-15 | Well Log Performed |
| 2008-09-19 | Well Log Performed |
| 2008-09-22 | Perforation Treatment Performed - Jet Perforation |
| 2008-10-02 | Perforation Treatment Performed - Fractured |
| 2008-11-01 | Well Began Production |
| 2008-11-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-11-01 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-09-22 | Perforation | 960.00 | 961.50 | 13 |
| 2008-09-22 | Perforation | 673.10 | 675.10 | 13 |
| 2008-09-22 | Perforation | 652.50 | 654.00 | 13 |
| 2008-09-22 | Perforation | 635.50 | 636.50 | 13 |
| 2008-09-22 | Perforation | 627.10 | 630.60 | 13 |
| 2008-09-22 | Perforation | 614.40 | 614.90 | 13 |
| 2008-09-22 | Perforation | 583.60 | 584.60 | 13 |
| 2008-09-22 | Perforation | 580.10 | 581.10 | 13 |
| 2008-09-22 | Perforation | 578.00 | 578.50 | 13 |
| 2008-09-22 | Perforation | 512.70 | 514.20 | 13 |
| 2008-09-22 | Perforation | 447.40 | 448.40 | 13 |
| 2008-09-22 | Perforation | 750.20 | 750.70 | 13 |
| 2008-09-22 | Perforation | 412.20 | 412.70 | 13 |
| 2008-09-22 | Perforation | 339.50 | 341.00 | 13 |
| 2008-10-02 | Fracture | 750.20 | 750.70 | 0 |
| 2008-10-02 | Fracture | 735.60 | 736.60 | 0 |
| 2008-10-02 | Fracture | 726.20 | 727.20 | 0 |
| 2008-10-02 | Fracture | 721.00 | 724.00 | 0 |
| 2008-10-02 | Fracture | 718.60 | 719.60 | 0 |
| 2008-10-02 | Fracture | 706.70 | 707.70 | 0 |
| 2008-10-02 | Fracture | 690.10 | 690.60 | 0 |
| 2008-10-02 | Fracture | 684.20 | 684.70 | 0 |
| 2008-09-22 | Perforation | 735.60 | 736.60 | 13 |
| 2008-10-02 | Fracture | 673.10 | 675.10 | 0 |
| 2008-10-02 | Fracture | 652.50 | 654.00 | 0 |
| 2008-10-02 | Fracture | 635.50 | 636.50 | 0 |
| 2008-10-02 | Fracture | 627.10 | 630.60 | 0 |
| 2008-10-02 | Fracture | 614.40 | 614.90 | 0 |
| 2008-10-02 | Fracture | 583.60 | 584.60 | 0 |
| 2008-10-02 | Fracture | 580.10 | 581.10 | 0 |
| 2008-10-02 | Fracture | 578.00 | 578.50 | 0 |
| 2008-10-02 | Fracture | 512.70 | 514.20 | 0 |
| 2008-10-02 | Fracture | 447.40 | 448.40 | 0 |
| 2008-09-22 | Perforation | 726.20 | 727.20 | 13 |
| 2008-10-02 | Fracture | 412.20 | 412.70 | 0 |
| 2008-10-02 | Fracture | 339.50 | 341.00 | 0 |
| 2008-09-22 | Perforation | 721.00 | 724.00 | 13 |
| 2008-09-22 | Perforation | 718.60 | 719.60 | 13 |
| 2008-09-22 | Perforation | 706.70 | 707.70 | 13 |
| 2008-09-22 | Perforation | 690.10 | 690.60 | 13 |
| 2008-09-22 | Perforation | 684.20 | 684.70 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 1460 | 0.0 | 0.0 | 0.0 |
| 2009 | 8637 | 0.0 | 0.0 | 0.0 |
| 2010 | 8664 | 0.0 | 0.0 | 0.0 |
| 2011 | 8437 | 0.0 | 0.0 | 0.0 |
| 2012 | 8715 | 0.0 | 0.0 | 0.0 |
| 2013 | 8698 | 0.0 | 0.0 | 0.0 |
| 2014 | 4703 | 0.0 | 0.0 | 0.0 |
| 2015 | 5157 | 0.0 | 0.0 | 0.0 |
| 2016 | 8704 | 0.0 | 0.0 | 0.0 |
| 2017 | 8690 | 0.0 | 0.0 | 0.0 |
| 2018 | 8745 | 0.0 | 0.0 | 0.0 |
| 2019 | 8620 | 0.0 | 0.0 | 0.0 |
| 2020 | 2107 | 0.0 | 0.0 | 0.0 |
For data sources see[5]