X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0294280612000

Well Details

Well ID: 0294280612000
Loading map...
Location: 00/12-06-029-28W4/0
Location Alias: 00/12-06-29-28 W4M
Location Alias 2: 00/12-06-029-28 W4/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 4
Range: 28
Section: 06
County/Municipality: Rocky View County
Well Name: HARBOUR CROSSE 12-6-29-28
Operator Name: Tercero Resources Company
License Number: 0066939
License Date: 1977-11-23
License Status: RecCertified
Spud Date: 1977-12-14
Final Drill Date: 1978-01-05
Well Total Depth: 1751.70 m
Surface Hole Latitude: 51.455739
Surface Hole Longitude: -113.937606

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-23 Obtained License
1977-12-14 Direction Drilling Operation Performed - 98
1977-12-15 Lost Circulation Occurred
1978-01-05 Finished Drilling
1978-01-05 Well Mode changed to Drilled and Cased
1978-01-07 Production Casing Operation Performed
1978-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-05 Perforation Treatment Performed - Jet Perforation
1978-05-07 Perforation Treatment Performed - Fractured
1978-05-07 Perforation Treatment Performed - Jet Perforation
1978-06-07 Well Began Production
1978-06-07 Well Fluid changed to Crude Oil
1978-06-07 Well Mode changed to Pumping
1980-11-30 Well Fluid changed to Crude Oil
1980-11-30 Well Mode changed to Suspended
1985-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-10-29 Plug Back Performed
1985-10-29 Well Abandoned
1985-10-29 Well Fluid changed to Crude Oil
1985-10-29 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1977-12-14 1030.20 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-05-05 Perforation 1735.80 1737.70 7
1978-05-05 Acid Treatment 1735.80 1737.70 0
1978-05-07 Perforation 1735.80 1737.70 7
1978-05-07 Fracture 1735.80 1737.70 0
1985-10-29 Packing Device Capped w/Cement 1719.10 1720.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 4818 0.0 0.0 0.0
1979 4726 0.0 0.0 0.0
1980 1586 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-15 Lost Circulation 121.90 121.90

For data sources see[7]

References