Well Details

Well ID: 0295010105000
Loading map...
Location: 00/05-01-029-01W5/0
Location Alias: 00/05-01-29-01 W5M
Location Alias 2: 00/05-01-029-01 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 01
Section: 01
County/Municipality: Rocky View County
Well Name: TRANSCAN PPL CROSSE 5-1-29-1
Operator Name: TransCanada Energy Ltd.
License Number: 0044346
License Date: 1972-11-29
License Status: Abandoned
Spud Date: 1972-12-03
Final Drill Date: 1972-12-24
Well Total Depth: 2331.70 m
Surface Hole Latitude: 51.450681
Surface Hole Longitude: -114.020774

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-11-29 Obtained License
1972-12-24 Finished Drilling
1972-12-25 Production Casing Operation Performed
1973-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-01-17 Perforation Treatment Performed - Jet Perforation
1973-01-30 Well Mode changed to Drilled and Cased
1973-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-29 Perforation Treatment Performed - Jet Perforation
1973-06-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-06-05 Perforation Treatment Performed - Jet Perforation
1975-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-22 Perforation Treatment Performed - Jet Perforation
1976-12-16 Well Began Production
1976-12-16 Well Fluid changed to Crude Oil
1976-12-16 Well Mode changed to Flowing
2004-08-01 Well Type changed to Observation
2008-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-13 Plug Back Performed
2008-02-13 Well Mode changed to Abandoned Zone
2008-02-13 Well Type changed to Observation
2013-08-22 Perforation Treatment Performed - Cement Plug
2013-08-22 Plug Back Performed
2013-08-23 Perforation Treatment Performed - Jet Perforation
2013-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-24 Plug Back Performed
2013-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-25 Perforation Treatment Performed - Jet Perforation
2013-08-25 Plug Back Performed
2013-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-26 Perforation Treatment Performed - Jet Perforation
2013-08-26 Plug Back Performed
2013-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-27 Perforation Treatment Performed - Jet Perforation
2013-08-27 Plug Back Performed
2013-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-08-28 Perforation Treatment Performed - Jet Perforation
2013-08-28 Plug Back Performed
2013-08-29 Perforation Treatment Performed - Cement Plug
2013-08-29 Perforation Treatment Performed - Jet Perforation
2013-08-29 Plug Back Performed
2013-09-11 Well Abandoned
2013-09-11 Well Mode changed to Abandoned
2013-09-11 Well Type changed to Observation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-01-17 Perforation 2283.00 2292.10 7
2013-08-22 Cement Plug 1988.00 2255.00 0
2013-08-23 Perforation 1360.00 1360.50 18
2013-08-23 Perforation 1395.00 1395.50 18
2013-08-24 Packing Device Capped w/Cement 1290.00 1360.00 0
2013-08-25 Perforation 1095.00 1095.50 18
2013-08-25 Perforation 1069.00 1069.50 18
2013-08-25 Packing Device Capped w/Cement 1035.50 1095.00 0
2013-08-26 Perforation 616.00 616.50 18
2013-08-26 Perforation 566.00 566.50 18
2013-08-26 Packing Device Capped w/Cement 521.00 616.50 0
1973-01-17 Acid Treatment 2283.00 2292.10 0
2013-08-27 Perforation 513.00 513.50 18
2013-08-27 Perforation 450.00 450.50 18
2013-08-27 Packing Device Capped w/Cement 415.00 513.50 0
2013-08-28 Perforation 400.00 400.50 18
2013-08-28 Perforation 320.00 320.50 18
2013-08-28 Packing Device Capped w/Cement 301.00 400.50 0
2013-08-29 Perforation 275.00 275.50 18
2013-08-29 Cement Plug 0.00 275.00 0
1973-03-29 Perforation 2283.00 2292.10 7
1973-03-29 Acid Treatment 2283.00 2292.10 0
1973-06-05 Perforation 2275.30 2280.50 7
1973-06-05 Acid Treatment 2275.30 2280.50 0
1975-07-22 Perforation 2275.30 2280.50 0
1975-07-22 Acid Treatment 2275.30 2280.50 0
2008-02-13 Packing Device Capped w/Cement 2257.00 2265.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 24 0.0 0.0 0.0
1977 7934 0.0 0.0 0.0
1978 5462 0.0 0.0 0.0
1979 4693 0.0 0.0 0.0
1980 7841 0.0 0.0 0.0
1981 8394 0.0 0.0 0.0
1982 7225 0.0 0.0 0.0
1983 5235 0.0 0.0 0.0
1984 7319 0.0 0.0 0.0
1985 7326 0.0 0.0 0.0
1986 8487 0.0 0.0 0.0
1987 7711 0.0 0.0 0.0
1988 6625 0.0 0.0 0.0
1989 7289 0.0 0.0 0.0
1990 3654 0.0 0.0 0.0
1991 4539 0.0 0.0 0.0
1992 8625 0.0 0.0 0.0
1993 5223 0.0 0.0 0.0
1994 1271 0.0 0.0 0.0
1998 160 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-19 No Incident Encountered 0.00 0.00

For data sources see[6]