X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295010107000

Well Details

Well ID: 0295010107000
Loading map...
Location: 00/07-01-029-01W5/0
Location Alias: 00/07-01-29-01 W5M
Location Alias 2: 00/07-01-029-01 W5/00
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 01
Section: 01
County/Municipality: Rocky View County
Well Name: TRANSCAN PPL CROSSE 7-1-29-1
Operator Name: TransCanada Energy Ltd.
License Number: 0020533
License Date: 1961-03-08
License Status: Issued
Spud Date: 1961-03-12
Final Drill Date: 1961-04-19
Well Total Depth: 2643.80 m
Surface Hole Latitude: 51.451563
Surface Hole Longitude: -114.010524

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-03-08 Obtained License
1961-03-14 Lost Circulation Occurred
1961-04-19 Finished Drilling
1961-04-21 Production Casing Operation Performed
1961-05-29 Well Mode changed to Drilled and Cased
1963-07-21 Perforation Treatment Performed - Jet Perforation
1963-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-02-14 Well Began Production
1965-02-14 Well Fluid changed to Gas
1965-02-14 Well Mode changed to Flowing
1967-07-26 Perforation Treatment Performed - Acid Wash - No Pressure
1969-12-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-01-05 Well Log Performed
1972-08-01 Well Fluid changed to Crude Oil
1972-08-01 Well Mode changed to Flowing
1974-07-01 Well Fluid changed to Crude Oil
1974-07-01 Well Mode changed to Suspended
1976-11-01 Well Fluid changed to Gas
1976-11-01 Well Mode changed to Flowing
1979-01-01 Well Fluid changed to Gas
1979-01-01 Well Mode changed to Flowing
1993-02-01 Well Fluid changed to Gas
1993-02-01 Well Type changed to Storage
1995-10-13 Well Log Performed
1995-10-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-07-21 Perforation 2261.00 2262.20 13
1963-07-21 Perforation 2263.70 2267.10 13
1963-07-21 Perforation 2271.70 2275.00 13
1963-07-21 Perforation 2277.50 2287.80 13
1963-07-22 Acid Treatment 2261.00 2287.80 0
1967-07-26 Acid Wash 2261.00 2287.80 0
1969-12-04 Acid Treatment 2261.00 2287.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1453 0.0 0.0 0.0
1969 3334 0.0 0.0 0.0
1970 8508 0.0 0.0 0.0
1971 8480 0.0 0.0 0.0
1972 5214 0.0 0.0 0.0
1973 1376 0.0 0.0 0.0
1974 1540 0.0 0.0 0.0
1976 862 0.0 0.0 0.0
1977 5644 0.0 0.0 0.0
1978 2736 0.0 0.0 0.0
1979 7082 0.0 0.0 0.0
1980 7006 0.0 0.0 0.0
1981 8196 0.0 0.0 0.0
1982 8703 0.0 0.0 0.0
1983 2860 0.0 0.0 0.0
1984 7423 0.0 0.0 0.0
1985 7168 0.0 0.0 0.0
1986 8273 0.0 0.0 0.0
1987 7253 0.0 0.0 0.0
1988 8657 0.0 0.0 0.0
1989 8403 0.0 0.0 0.0
1990 8553 0.0 0.0 0.0
1991 7682 0.0 0.0 0.0
1992 8424 0.0 0.0 0.0
1993 4811 0.0 0.0 0.0
1994 1485 0.0 0.0 0.0
1995 1603 0.0 0.0 0.0
1996 747 0.0 0.0 0.0
1997 1999 0.0 0.0 0.0
1998 1779 0.0 0.0 0.0
1999 1682 0.0 0.0 0.0
2000 3678 0.0 0.0 0.0
2001 2412 0.0 0.0 0.0
2002 2448 0.0 0.0 0.0
2003 5676 0.0 0.0 0.0
2004 2232 0.0 0.0 0.0
2005 3185 0.0 0.0 0.0
2006 734 0.0 0.0 0.0
2007 1010 0.0 0.0 0.0
2008 1330 0.0 0.0 0.0
2009 36 0.0 0.0 0.0
2010 614 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 792 0.0 0.0 0.0
2014 5566 0.0 0.0 0.0
2015 315 0.0 0.0 0.0
2016 600 0.0 0.0 0.0
2017 547 0.0 0.0 0.0
2018 1660 0.0 0.0 0.0
2019 1291 0.0 0.0 0.0
2020 1205 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-03-14 Lost Circulation 158.50 158.50

For data sources see[6]

References