X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295011207002

Well Details

Well ID: 0295011207002
Loading map...
Location: 00/07-12-029-01W5/2
Location Alias: 00/07-12-29-01 W5M
Location Alias 2: 00/07-12-029-01 W5/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 01
Section: 12
County/Municipality: Rocky View County
Well Name: PWEI UNIT CROSSE 7-12-29-1
Operator Name: TAQA North Ltd.
License Number: 0020780
License Date: 1961-05-24
License Status: Issued
Spud Date: 1961-05-28
Final Drill Date: 1961-07-19
Well Total Depth: 2689.90 m
Surface Hole Latitude: 51.465167
Surface Hole Longitude: -114.009869

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-05-24 Obtained License
1961-06-20 Drill Stem Test Performed
1961-06-27 Liner Casing Operation Performed
1961-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-27 Perforation Treatment Performed - Jet Perforation
1961-07-19 Drill Stem Test Performed
1961-07-19 Finished Drilling
1961-07-19 Well Mode changed to Drilled and Cased
1961-07-22 Perforation Treatment Performed - Cement Squeeze
1965-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-10-30 Perforation Treatment Performed - Jet Perforation
1965-10-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-08 Perforation Treatment Performed - Cement Squeeze
1968-10-11 Perforation Treatment Performed - Jet Perforation
1968-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-07 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-12 Perforation Treatment Performed - Bridge Plug No Cement Required
2002-03-12 Plug Back Performed
2002-03-12 Well Log Performed
2002-03-13 Well Log Performed
2002-03-14 Perforation Treatment Performed - Jet Perforation
2002-03-17 Perforation Treatment Performed - Fractured
2004-01-01 Well Began Production
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Flowing
2012-12-09 Well Fluid changed to Gas
2012-12-09 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-06-27 Perforation 2263.40 2275.00 13
1968-10-08 Cement Squeeze 2657.90 2659.70 0
1968-10-08 Cement Squeeze 2663.60 2669.70 0
1968-10-11 Perforation 2666.10 2667.30 26
1968-10-19 Acid Treatment 2666.10 2667.30 0
1968-10-21 Acid Treatment 2666.10 2667.30 0
2002-03-07 Bridge Plug, No Cement 2628.00 2628.30 0
2002-03-12 Packing Device Capped w/Cement 2617.60 2625.90 0
2002-03-12 Bridge Plug, No Cement 2242.00 2242.30 0
2002-03-14 Perforation 1984.00 1990.00 17
2002-03-17 Fracture 1984.00 1990.00 0
1961-06-27 Acid Treatment 2263.40 2275.00 0
1961-07-22 Cement Squeeze 2263.40 2275.00 0
1965-10-30 Perforation 2657.90 2659.70 13
1965-10-30 Perforation 2663.60 2669.70 13
1965-10-30 Perforation 2653.30 2656.30 13
1965-10-30 Acid Treatment 2653.30 2669.70 0
1965-10-31 Acid Treatment 2653.30 2669.70 0
1968-10-08 Cement Squeeze 2653.30 2656.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8087 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 6599 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8753 0.0 0.0 0.0
2011 6225 0.0 0.0 0.0
2012 5875 0.0 0.0 0.0
2013 8141 0.0 0.0 0.0
2014 8484 0.0 0.0 0.0
2015 6832 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8317 0.0 0.0 0.0
2018 8407 0.0 0.0 0.0
2019 7987 0.0 0.0 0.0
2020 1889 0.0 0.0 0.0

For data sources see[5]

References