X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0295070511002

Well Details

Well ID: 0295070511002
Loading map...
Location: 00/11-05-029-07W5/2
Location Alias: 00/11-05-29-07 W5M
Location Alias 2: 00/11-05-029-07 W5/02
Country: Canada
Province: Alberta
Township: 029
Meridian: 5
Range: 07
Section: 05
County/Municipality: Municipal District of Bighorn No. 8
Well Name: Canlin WCATH 11-5-29-7
Operator Name: Canlin Energy Corporation
License Number: 0034335
License Date: 1968-06-24
License Status: Issued
Spud Date: 1968-07-11
Final Drill Date: 1969-01-02
Well Total Depth: 3730.10 m
Surface Hole Latitude: 51.455423
Surface Hole Longitude: -114.955592

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-06-24 Obtained License
1968-12-15 Liner Casing Operation Performed
1969-01-02 Finished Drilling
1969-01-02 Perforation Treatment Performed - Open-Hole Completion
1969-01-03 Drill Stem Test Performed
1969-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-02-26 Perforation Treatment Performed - Selective Jet Perforations
1969-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-10 Perforation Treatment Performed - Selective Jet Perforations
1969-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-12 Perforation Treatment Performed - Jet Perforation
1969-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-18 Perforation Treatment Performed - Selective Jet Perforations
1969-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-08-06 Well Mode changed to Drilled and Cased
1988-11-22 Well Began Production
1988-11-22 Well Fluid changed to Gas
1988-11-22 Well Mode changed to Flowing
1989-09-26 Well Fluid changed to Gas
1989-09-26 Well Mode changed to Suspended
1990-08-29 Well Fluid changed to Gas
1990-08-29 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-01-02 Open Hole/Barefoot Completion 3621.90 3730.10 0
1969-02-26 Selective Jet Perforations 3317.40 3319.00 0
1969-02-26 Selective Jet Perforations 3320.50 3321.40 0
1969-02-26 Selective Jet Perforations 3325.70 3326.30 0
1969-02-26 Selective Jet Perforations 3326.90 3327.50 0
1969-02-26 Selective Jet Perforations 3330.20 3330.90 0
1969-02-26 Selective Jet Perforations 3331.50 3332.10 0
1969-02-26 Selective Jet Perforations 3332.70 3333.30 0
1969-02-26 Selective Jet Perforations 3333.90 3334.50 0
1969-02-26 Selective Jet Perforations 3343.70 3344.30 0
1969-02-26 Selective Jet Perforations 3344.90 3345.50 0
1969-02-21 Acid Treatment 3621.90 3730.10 0
1969-02-26 Selective Jet Perforations 3346.10 3347.60 0
1969-02-26 Selective Jet Perforations 3350.10 3351.90 0
1969-02-26 Selective Jet Perforations 3352.50 3353.40 0
1969-02-26 Selective Jet Perforations 3354.60 3355.20 0
1969-02-26 Selective Jet Perforations 3355.80 3356.50 0
1969-02-26 Selective Jet Perforations 3357.10 3357.70 0
1969-02-26 Selective Jet Perforations 3358.30 3360.10 0
1969-02-26 Selective Jet Perforations 3361.00 3362.20 0
1969-02-26 Selective Jet Perforations 3364.10 3364.70 0
1969-02-26 Selective Jet Perforations 3366.50 3371.70 0
1969-02-26 Packing Device Capped w/Cement 3395.50 3398.50 0
1969-02-26 Selective Jet Perforations 3374.40 3378.70 0
1969-02-26 Selective Jet Perforations 3379.30 3381.50 0
1969-02-26 Selective Jet Perforations 3383.90 3383.90 0
1969-03-01 Acid Treatment 3343.70 3383.90 0
1969-03-05 Acid Treatment 3304.00 3383.90 0
1969-03-10 Selective Jet Perforations 3165.70 3166.30 0
1969-03-10 Selective Jet Perforations 3167.20 3168.10 0
1969-03-10 Selective Jet Perforations 3169.90 3170.50 0
1969-03-10 Selective Jet Perforations 3172.10 3173.60 0
1969-03-10 Selective Jet Perforations 3175.70 3177.80 0
1969-02-26 Selective Jet Perforations 3304.00 3304.60 0
1969-03-10 Selective Jet Perforations 3178.80 3181.20 0
1969-03-10 Selective Jet Perforations 3181.80 3187.90 0
1969-03-10 Selective Jet Perforations 3192.80 3193.70 0
1969-03-10 Selective Jet Perforations 3194.30 3196.40 0
1969-03-10 Selective Jet Perforations 3197.40 3198.30 0
1969-03-10 Selective Jet Perforations 3200.10 3200.70 0
1969-03-10 Selective Jet Perforations 3201.30 3204.70 0
1969-03-10 Selective Jet Perforations 3205.30 3206.80 0
1969-03-11 Acid Treatment 3165.70 3206.80 0
1969-03-12 Perforation 3160.50 3160.80 16
1969-02-26 Selective Jet Perforations 3305.30 3306.80 0
1969-03-12 Perforation 3165.70 3166.00 16
1969-03-12 Perforation 3170.80 3171.10 16
1969-03-12 Perforation 3177.80 3178.10 16
1969-03-12 Perforation 3199.80 3200.10 16
1969-03-12 Perforation 3194.90 3195.20 16
1969-03-12 Acid Treatment 3160.50 3206.80 0
1969-03-13 Acid Treatment 3160.50 3206.80 0
1969-03-18 Selective Jet Perforations 3115.10 3115.40 0
1969-03-18 Selective Jet Perforations 3116.90 3117.20 0
1969-03-18 Selective Jet Perforations 3117.50 3121.20 0
1969-02-26 Selective Jet Perforations 3307.40 3308.30 0
1969-03-18 Selective Jet Perforations 3123.30 3124.80 0
1969-03-18 Selective Jet Perforations 3125.10 3125.40 0
1969-03-18 Selective Jet Perforations 3127.90 3130.30 0
1969-03-18 Selective Jet Perforations 3132.10 3132.40 0
1969-03-18 Selective Jet Perforations 3132.70 3133.60 0
1969-03-18 Selective Jet Perforations 3134.00 3134.30 0
1969-03-18 Selective Jet Perforations 3134.60 3138.20 0
1969-03-18 Selective Jet Perforations 3138.50 3138.80 0
1969-03-18 Selective Jet Perforations 3139.40 3144.30 0
1969-03-18 Selective Jet Perforations 3146.80 3148.30 0
1969-02-26 Selective Jet Perforations 3309.80 3311.30 0
1969-03-18 Selective Jet Perforations 3150.10 3151.30 0
1969-03-21 Acid Treatment 3109.00 3154.70 0
1969-02-26 Selective Jet Perforations 3313.20 3313.80 0
1969-02-26 Selective Jet Perforations 3314.70 3316.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1337 0.0 0.0 0.0
1989 4961 0.0 0.0 0.0
1990 2641 0.0 0.0 0.0
1991 6386 0.0 0.0 0.0
1992 7731 0.0 0.0 0.0
1993 8403 0.0 0.0 0.0
1994 8018 0.0 0.0 0.0
1995 8600 0.0 0.0 0.0
1996 8563 0.0 0.0 0.0
1997 8283 0.0 0.0 0.0
1998 8605 0.0 0.0 0.0
1999 8593 0.0 0.0 0.0
2000 8570 0.0 0.0 0.0
2001 8524 0.0 0.0 0.0
2002 8687 0.0 0.0 0.0
2003 7592 0.0 0.0 0.0
2004 8324 0.0 0.0 0.0
2005 8222 0.0 0.0 0.0
2006 8474 0.0 0.0 0.0
2007 8456 0.0 0.0 0.0
2008 7719 0.0 0.0 0.0
2009 8592 0.0 0.0 0.0
2010 7603 0.0 0.0 0.0
2011 8473 0.0 0.0 0.0
2012 7575 0.0 0.0 0.0
2013 8288 0.0 0.0 0.0
2014 8277 0.0 0.0 0.0
2015 7998 0.0 0.0 0.0
2016 7966 0.0 0.0 0.0
2017 8357 0.0 0.0 0.0
2018 7548 0.0 0.0 0.0
2019 5608 0.0 0.0 0.0
2020 1999 0.0 0.0 0.0

For data sources see[5]

References