If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0295070706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.459929,"lon":-114.983299,"icon":""}]} |
| Location: 00/06-07-029-07W5/0 | |
| Location Alias: 00/06-07-29-07 W5M | |
| Location Alias 2: 00/06-07-029-07 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 029 | |
| Meridian: 5 | |
| Range: 07 | |
| Section: 07 | |
| County/Municipality: Municipal District of Bighorn No. 8 | |
| Well Name: Canlin WCATH 6-7-29-7 | |
| Operator Name: Canlin Energy Corporation | |
| License Number: 0330064 | |
| License Date: 2005-04-29 | |
| License Status: Issued | |
| Spud Date: 2005-10-26 | |
| Final Drill Date: 2005-12-26 | |
| Well Total Depth: 3850.00 m | |
| Surface Hole Latitude: 51.459929 | |
| Surface Hole Longitude: -114.983299 |
| Date | Event |
|---|---|
| 2005-04-29 | Obtained License |
| 2005-10-31 | Surface Casing Operation Performed |
| 2005-11-20 | Direction Drilling Operation Performed - Deviate |
| 2005-12-18 | Well Log Performed |
| 2005-12-21 | Well Log Performed |
| 2005-12-22 | Well Log Performed |
| 2005-12-23 | Well Log Performed |
| 2005-12-26 | Finished Drilling |
| 2005-12-26 | Well Mode changed to Drilled and Cased |
| 2005-12-27 | Well Log Performed |
| 2005-12-29 | Production Casing Operation Performed |
| 2005-12-31 | Rig Released |
| 2006-02-20 | Well Log Performed |
| 2006-02-23 | Perforation Treatment Performed - Jet Perforation |
| 2006-02-23 | Well Log Performed |
| 2006-02-24 | Perforation Treatment Performed - Chemical Squeeze |
| 2006-02-24 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2006-03-08 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-09 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-09 | Well Log Performed |
| 2006-03-10 | Perforation Treatment Performed - Chemical Squeeze |
| 2006-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2006-03-15 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-15 | Well Log Performed |
| 2006-03-16 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-18 | Perforation Treatment Performed - Chemical Squeeze |
| 2006-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2006-03-23 | Well Began Production |
| 2006-03-23 | Well Fluid changed to Gas |
| 2006-03-23 | Well Mode changed to Flowing |
| 2006-12-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2006-12-14 | Well Log Performed |
| 2006-12-20 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2005-11-20 | 2500.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-02-23 | Perforation | 3805.90 | 3812.00 | 17 |
| 2006-03-09 | Perforation | 3525.50 | 3530.50 | 13 |
| 2006-03-09 | Perforation | 3533.00 | 3536.00 | 13 |
| 2006-03-09 | Perforation | 3496.00 | 3506.00 | 13 |
| 2006-03-10 | Chemical Squeeze | 3496.00 | 3550.00 | 0 |
| 2006-03-11 | Acid Treatment | 3496.00 | 3550.00 | 0 |
| 2006-03-15 | Perforation | 3477.00 | 3479.00 | 13 |
| 2006-03-15 | Perforation | 3468.00 | 3470.00 | 13 |
| 2006-03-15 | Perforation | 3462.50 | 3465.50 | 13 |
| 2006-03-15 | Perforation | 3455.00 | 3460.00 | 13 |
| 2006-03-15 | Perforation | 3439.50 | 3450.50 | 13 |
| 2006-02-23 | Perforation | 3802.50 | 3805.90 | 17 |
| 2006-03-15 | Perforation | 3438.00 | 3439.00 | 13 |
| 2006-03-15 | Perforation | 3424.00 | 3429.00 | 13 |
| 2006-03-16 | Perforation | 3407.00 | 3416.00 | 13 |
| 2006-03-16 | Perforation | 3393.00 | 3398.00 | 13 |
| 2006-03-16 | Perforation | 3398.00 | 3407.00 | 13 |
| 2006-03-18 | Chemical Squeeze | 3424.00 | 3479.00 | 0 |
| 2006-03-19 | Acid Treatment | 3424.00 | 3479.00 | 0 |
| 2006-12-14 | Packing Device Capped w/Cement | 3472.60 | 3475.00 | 0 |
| 2006-12-14 | Packing Device Capped w/Cement | 3432.60 | 3435.00 | 0 |
| 2006-02-24 | Perforation | 3786.40 | 3792.50 | 17 |
| 2006-02-24 | Perforation | 3780.30 | 3786.40 | 17 |
| 2006-02-24 | Perforation | 3777.00 | 3780.30 | 17 |
| 2006-02-24 | Chemical Squeeze | 3777.00 | 3812.00 | 0 |
| 2006-03-04 | Acid Treatment | 3777.00 | 3812.00 | 0 |
| 2006-03-08 | Perforation | 3539.00 | 3550.00 | 13 |
| 2006-03-09 | Perforation | 3516.00 | 3518.00 | 13 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 874 | 0.0 | 0.0 | 0.0 |
| 2007 | 8224 | 0.0 | 0.0 | 0.0 |
| 2008 | 7741 | 0.0 | 0.0 | 0.0 |
| 2009 | 8231 | 0.0 | 0.0 | 0.0 |
| 2010 | 7604 | 0.0 | 0.0 | 0.0 |
| 2011 | 8340 | 0.0 | 0.0 | 0.0 |
| 2012 | 7490 | 0.0 | 0.0 | 0.0 |
| 2013 | 8476 | 0.0 | 0.0 | 0.0 |
| 2014 | 8491 | 0.0 | 0.0 | 0.0 |
| 2015 | 8014 | 0.0 | 0.0 | 0.0 |
| 2016 | 8414 | 0.0 | 0.0 | 0.0 |
| 2017 | 8356 | 0.0 | 0.0 | 0.0 |
| 2018 | 5841 | 0.0 | 0.0 | 0.0 |
| 2019 | 3251 | 0.0 | 0.0 | 0.0 |
| 2020 | 1917 | 0.0 | 0.0 | 0.0 |
For data sources see[6]