X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304110302000

Well Details

Well ID: 0304110302000
Loading map...
Location: 00/02-03-030-11W4/0
Location Alias: 00/02-03-30-11 W4M
Location Alias 2: 00/02-03-030-11 W4/00
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 11
Section: 03
County/Municipality: Special Areas No. 2
Well Name: SOC STANMORE 2-3-30-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0241639
License Date: 2000-09-06
License Status: Issued
Spud Date: 2000-09-30
Final Drill Date: 2000-10-05
Well Total Depth: 1121.00 m
Surface Hole Latitude: 51.536359
Surface Hole Longitude: -111.470785

For data sources see[1][2]

Well History

Date Event
2000-09-06 Obtained License
2000-10-01 Surface Casing Operation Performed
2000-10-02 Direction Drilling Operation Performed - Deviate
2000-10-05 Finished Drilling
2000-10-05 Well Log Performed
2000-10-06 Production Casing Operation Performed
2000-10-06 Rig Released
2000-10-06 Well Mode changed to Drilled and Cased
2000-10-15 Perforation Treatment Performed - Jet Perforation
2000-10-15 Perforation Treatment Performed - Remedial Casing
2000-10-16 Perforation Treatment Performed - Jet Perforation
2000-10-16 Perforation Treatment Performed - Remedial Casing
2000-10-30 Perforation Treatment Performed - Jet Perforation
2000-11-04 Well Began Production
2000-11-04 Well Fluid changed to Crude Oil
2000-11-04 Well Mode changed to Flowing
2000-11-29 Perforation Treatment Performed - Jet Perforation
2001-01-21 Well Fluid changed to Crude Oil
2001-01-21 Well Mode changed to Pumping
2005-01-20 Perforation Treatment Performed - Jet Perforation
2005-01-20 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-10-02 213.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-10-15 Perforation 508.00 508.30 36
2000-10-15 Remedial Casing Cementing 508.00 508.30 0
2000-10-16 Perforation 270.00 270.30 0
2000-10-16 Remedial Casing Cementing 270.00 270.30 0
2000-10-30 Perforation 1102.00 1104.00 20
2000-11-29 Perforation 1090.50 1092.00 20
2005-01-20 Perforation 1085.00 1087.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 690 0.0 0.0 0.0
2001 3548 0.0 0.0 0.0
2002 4490 0.0 0.0 0.0
2003 8254 0.0 0.0 0.0
2004 8433 0.0 0.0 0.0
2005 7891 0.0 0.0 0.0
2006 8421 0.0 0.0 0.0
2007 7484 0.0 0.0 0.0
2008 7587 0.0 0.0 0.0
2009 6404 0.0 0.0 0.0
2010 6263 0.0 0.0 0.0
2011 8210 0.0 0.0 0.0
2012 8549 0.0 0.0 0.0
2013 6521 0.0 0.0 0.0
2014 6318 0.0 0.0 0.0
2015 8614 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8570 0.0 0.0 0.0
2018 8087 0.0 0.0 0.0
2019 6036 0.0 0.0 0.0
2020 2156 0.0 0.0 0.0

For data sources see[6]

References