X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304110604002

Well Details

Well ID: 0304110604002
Loading map...
Location: 00/04-06-030-11W4/2
Location Alias: 00/04-06-30-11 W4M
Location Alias 2: 00/04-06-030-11 W4/02
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 11
Section: 06
County/Municipality: Special Areas No. 2
Well Name: VH1 SMORE 4-6-30-11
Operator Name: Harvest Operations Corp.
License Number: 0286641
License Date: 2003-05-02
License Status: RecCertified
Spud Date: 2003-07-16
Final Drill Date: 2003-07-23
Well Total Depth: 1270.00 m
Surface Hole Latitude: 51.537664
Surface Hole Longitude: -111.544592

For data sources see[1][2]

Well History

Date Event
2003-05-02 Obtained License
2003-07-17 Surface Casing Operation Performed
2003-07-21 Direction Drilling Operation Performed - Deviate
2003-07-23 Finished Drilling
2003-07-23 Well Mode changed to Drilled and Cased
2003-07-24 Production Casing Operation Performed
2003-07-25 Rig Released
2003-07-27 Well Log Performed
2008-09-16 Well Log Performed
2008-09-18 Perforation Treatment Performed - Jet Perforation
2008-09-19 Perforation Treatment Performed - Remedial Casing
2008-09-21 Perforation Treatment Performed - Jet Perforation
2008-09-21 Well Log Performed
2008-09-22 Perforation Treatment Performed - Remedial Casing
2008-09-23 Perforation Treatment Performed - Jet Perforation
2008-09-23 Well Log Performed
2008-09-24 Perforation Treatment Performed - Remedial Casing
2008-09-25 Well Log Performed
2008-10-02 Well Abandoned
2008-10-02 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-07-21 198.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-18 Perforation 359.00 360.00 17
2008-09-19 Remedial Casing Cementing 359.00 360.00 0
2008-09-21 Perforation 304.00 305.00 17
2008-09-22 Remedial Casing Cementing 304.00 305.00 0
2008-09-23 Perforation 250.00 251.00 17
2008-09-24 Remedial Casing Cementing 250.00 251.00 0

For data sources see[5]



References