X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0304111310004

Well Details

Well ID: 0304111310004
Loading map...
Location: 00/10-13-030-11W4/4
Location Alias: 00/10-13-30-11 W4M
Location Alias 2: 00/10-13-030-11 W4/04
Country: Canada
Province: Alberta
Township: 030
Meridian: 4
Range: 11
Section: 13
County/Municipality: Special Areas No. 2
Well Name: SOC STANMORE 10-13-30-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0038389
License Date: 1970-07-10
License Status: Abandoned
Spud Date: 2002-10-21
Final Drill Date: 2002-10-28
Well Total Depth: 1036.30 m
Surface Hole Latitude: 51.572320
Surface Hole Longitude: -111.417686

For data sources see[1][2]

Well History

Date Event
1970-07-10 Obtained License
2002-10-28 Finished Drilling
2002-10-28 Perforation Treatment Performed - Jet Perforation
2002-10-28 Well Mode changed to Drilled and Cased
2002-10-29 Perforation Treatment Performed - Jet Perforation
2002-10-30 Rig Released
2002-11-15 Well Began Production
2002-11-15 Well Fluid changed to Water
2002-11-15 Well Type changed to Source
2009-06-01 Well Fluid changed to Gas
2009-06-01 Well Mode changed to Flowing
2010-08-01 Well Fluid changed to Gas
2010-08-01 Well Mode changed to Pumping
2019-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-06-29 Plug Back Performed
2019-06-29 Well Fluid changed to Gas
2019-06-29 Well Mode changed to Abandoned Zone
2019-07-24 Well Abandoned
2019-07-24 Well Fluid changed to Gas
2019-07-24 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-28 Perforation 344.40 345.90 14
2002-10-29 Perforation 366.00 371.00 14
2002-10-29 Perforation 356.40 362.00 14
2002-10-29 Perforation 350.40 356.40 14
2002-10-29 Perforation 344.40 350.40 14
2019-06-29 Packing Device Capped w/Cement 321.50 329.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 711 0.0 0.0 0.0
2003 5136 0.0 0.0 0.0
2004 8289 0.0 0.0 0.0
2005 5728 0.0 0.0 0.0
2006 6843 0.0 0.0 0.0
2007 6960 0.0 0.0 0.0
2008 5784 0.0 0.0 0.0
2009 5526 0.0 0.0 0.0
2010 7445 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8753 0.0 0.0 0.0
2013 7395 0.0 0.0 0.0
2014 5156 0.0 0.0 0.0
2015 3945 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 1525 0.0 0.0 0.0
2019 96 0.0 0.0 0.0

For data sources see[5]

References