If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0304140901030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.550728,"lon":-111.907386,"icon":""}]} |
Location: 03/01-09-030-14W4/0 | |
Location Alias: 03/01-09-30-14 W4M | |
Location Alias 2: 03/01-09-030-14 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 030 | |
Meridian: 4 | |
Range: 14 | |
Section: 09 | |
County/Municipality: Special Areas No. 2 | |
Well Name: SOC HANNA 1-9-30-14 | |
Operator Name: AlphaBow Energy Ltd. | |
License Number: 0377789 | |
License Date: 2007-06-05 | |
License Status: Abandoned | |
Spud Date: 2007-07-01 | |
Final Drill Date: 2007-07-04 | |
Well Total Depth: 1160.00 m | |
Surface Hole Latitude: 51.550728 | |
Surface Hole Longitude: -111.907386 |
Date | Event |
---|---|
2007-06-05 | Obtained License |
2007-07-02 | Surface Casing Operation Performed |
2007-07-03 | Well Log Performed |
2007-07-04 | Finished Drilling |
2007-07-04 | Production Casing Operation Performed |
2007-07-04 | Rig Released |
2007-07-04 | Well Mode changed to Drilled and Cased |
2007-07-23 | Perforation Treatment Performed - Jet Perforation |
2007-07-23 | Well Log Performed |
2007-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-07-26 | Perforation Treatment Performed - Jet Perforation |
2007-07-26 | Well Log Performed |
2007-07-31 | Well Log Performed |
2007-09-16 | Well Log Performed |
2007-09-17 | Perforation Treatment Performed - Chemical Squeeze |
2010-11-19 | Perforation Treatment Performed - Cement Squeeze |
2010-11-19 | Plug Back Performed |
2010-11-19 | Well Mode changed to Abandoned Zone |
2010-11-20 | Well Log Performed |
2010-11-27 | Perforation Treatment Performed - Jet Perforation |
2010-11-27 | Well Log Performed |
2010-11-29 | Perforation Treatment Performed - Remedial Casing |
2010-12-16 | Perforation Treatment Performed - Jet Perforation |
2010-12-17 | Perforation Treatment Performed - Remedial Casing |
2011-01-18 | Perforation Treatment Performed - Jet Perforation |
2011-01-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-01-19 | Perforation Treatment Performed - Cement Plug |
2011-01-19 | Perforation Treatment Performed - Jet Perforation |
2011-01-19 | Plug Back Performed |
2011-01-19 | Well Log Performed |
2011-03-14 | Perforation Treatment Performed - Jet Perforation |
2011-03-14 | Well Log Performed |
2011-03-15 | Perforation Treatment Performed - Remedial Casing |
2011-03-21 | Well Log Performed |
2011-03-22 | Perforation Treatment Performed - Jet Perforation |
2011-03-22 | Well Log Performed |
2011-03-25 | Perforation Treatment Performed - Remedial Casing |
2011-03-27 | Well Abandoned |
2011-03-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-07-23 | Perforation | 1109.50 | 1114.00 | 17 |
2011-01-18 | Perforation | 220.00 | 222.00 | 13 |
2011-01-19 | Packing Device Capped w/Cement | 209.00 | 217.00 | 0 |
2011-01-19 | Perforation | 175.00 | 176.00 | 13 |
2011-01-19 | Cement Plug | 118.00 | 200.00 | 0 |
2011-03-14 | Perforation | 175.00 | 176.00 | 17 |
2011-03-14 | Perforation | 172.00 | 173.00 | 17 |
2011-03-14 | Perforation | 172.00 | 173.00 | 99 |
2011-03-15 | Remedial Casing Cementing | 172.00 | 176.00 | 0 |
2011-03-22 | Perforation | 231.00 | 232.00 | 17 |
2011-03-25 | Remedial Casing Cementing | 231.00 | 232.00 | 0 |
2007-07-24 | Acid Treatment | 1109.50 | 1114.00 | 0 |
2007-07-26 | Perforation | 1107.00 | 1108.50 | 17 |
2007-09-17 | Chemical Squeeze | 1107.00 | 1108.50 | 0 |
2010-11-19 | Cement Squeeze | 1107.00 | 1114.00 | 0 |
2010-11-27 | Perforation | 436.00 | 438.00 | 17 |
2010-11-29 | Remedial Casing Cementing | 436.00 | 438.00 | 0 |
2010-12-16 | Perforation | 269.00 | 271.00 | 14 |
2010-12-17 | Remedial Casing Cementing | 269.00 | 271.00 | 0 |
For data sources see[4]